Littlesilver, Bandon, Co. Cork

With the council, no decision yet.

  1. 19 Dec 2025Received
  2. 3 Feb 2026Observations closed

An email when it’s decided. After that, only if it’s appealed or building starts.

Planning details

Status
With the council, no decision yet
Reference
25/6877
Received
19 Dec 2025
Site
1.30 ha

What’s proposed

EDF Renewables Ireland Limited intend to apply for a 10 Year Permission for development at this site of c. 1.29 ha, located on lands at Littlesilver, Bandon, Co. Cork. The proposed development consists of a battery energy storage system (BESS) facility, which will comprise of rechargeable battery units contained within 28 no. c. 25 ft containers on site; 7 no.

Show all

MVs units; 1 no. auxiliary transformer; a resistor, reactor and harmonic filter unit; a low voltage (LV) building and a welfare and spares container. The proposed development also involves the diversion of the existing overhead line on site and includes an underground cable, which will connect the BESS facility to the Bandon 110kV substation. The proposed development will include for the demolition and removal of the existing decommissioned wind turbine and associated outbuilding on site. The proposed development also includes the construction of a 38kV substation building with associated compounds and car parking; stock proof fencing and gateways; landscaping; foul water holding tank; rainwater harvesting tank; stone soakaways; piped infrastructure and ducting; retention basin and stone headwall; signage; security fencing; boundary treatments; lighting; CCTV; SUDs; permeable gravel area; upgrading of the existing site entrance with partial hedgerow removal; new access track and upgrading of the existing access track; and all associated site development and excavation works above and below ground. Planning permission is sought for a period of 10 years

7 other applications within 500 m in five years

Open the report

Nearby 7 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

25/6877 is a planning application to Cork County Council for EDF Renewables Ireland Limited intend to apply for a 10 Year Permission for development, received on 19 Dec 2025; no decision has been recorded yet.