Coolcloher South, Boherbue, Mallow, Co. Cork
Declared invalid.
- 8 Jan 2026Received
- 12 Feb 2026Observations closed
Planning details
- Status
- Withdrawn or invalid
- Reference
- 26/0019
- Received
- 8 Jan 2026
- Site
- 1,365 m²
What’s proposed
Permission for the refurbishment and extension of existing cottage. The proposed development will include the following: (1) Demolition of an existing single-storey extension and outbuilding at the rear of the existing cottage; (2) Construction of a new single-storey extension to the original dwelling, including a link structure between the proposed extension and the existing cottage;
Show all
(3) New openings and alterations to existing façades; (4) A new vehicular site entrance and reinstatement of the original road boundary; (5) Decommissioning and removal of the existing septic tank and installation of a new wastewater treatment system; (6) All associated site ancillary works
2 other applications within 500 m in the last year
Get the full reportNearby 2 · 500 m · 12 months
Homes nearby
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
26/0019 is a planning application to Cork County Council for permission for the refurbishment and extension of existing cottage. The proposed, received on 8 Jan 2026; the file is recorded as invalid - case closed.