PlanningRegister.ie
Cork County Council · 26/0819

Kilanully, Kilnahone, and Ballygarvan, Co. Cork, T12 AX80

Waiting for a decision.

  1. 1 Apr 2026Received
  2. 6 May 2026Observations closed
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
With the council, no decision yet
Decision
Not yet
Council
Cork County Council
Type
Permission
Site
51.91 ha

Live near Kilanully?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

We, Roadstone Ltd., intend to apply to Cork County Council for a 30-year planning permission for the development of a vertical extension at this site, the existing Ballygarvan Quarry in the townlands of Killanully, Kilnahone and Ballygarvan, Co. Cork. The proposed development consists of: • Development of a vertical extension to the existing quarry comprising extraction, processing and washing of limestone and soil from an area measuring approximately 5.4ha and will allow for the extraction of approximately 1,303,798m3 of material; • Construction of an aggregate washing plant (including filter press, water supply tank, and water management network); • Construction of a quarantine area comprising a concrete foundation slab and inspection shed (gross floor area of 625m2); • Infilling and restoration of the existing and future quarry void over an area of approximately 14.7ha. It is proposed to fill the void with soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product. There will be a phased restoration of the quarry void working from the base of the void vertically building up soil and stone. Following completion of the infilling works, natural colonisation of plant species will occur from the seedbank within the redistributed soil; • Continued use of existing operational infrastructure including weighbridge, office, wheel-wash facility, maintenance workshop, lime shed, water storage tanks, refuelling area and plant and machinery storage area; • Continued use of existing site access via the existing entrance off the R613; • All associated site development works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development

Planning details

Reference
26/0819
Local authority
Cork County Council
Status
With the council, no decision yet · register status “Awaiting F.I. Response”
Received
1 Apr 2026
Observations close
6 May 2026 (closed 151 days ago)
Decision due
No due date published
Decision
Not decided
Proposed development
We, Roadstone Ltd., intend to apply to Cork County Council for a 30-year planning permission for the development of a vertical extension at this site, the existing Ballygarvan Quarry in the townlands of Killanully, Kilnahone and Ballygarvan, Co. Cork. The proposed development consists of: • Development of a vertical extension to the existing quarry comprising extraction, processing and washing of limestone and soil from an area measuring approximately 5.4ha and will allow for the extraction of approximately 1,303,798m3 of material; • Construction of an aggregate washing plant (including filter press, water supply tank, and water management network); • Construction of a quarantine area comprising a concrete foundation slab and inspection shed (gross floor area of 625m2); • Infilling and restoration of the existing and future quarry void over an area of approximately 14.7ha. It is proposed to fill the void with soil and stone by-product (i.e. essentially virgin soil or equivalent to virgin soil and stone) which will be notified to the EPA as an Article 27 by-product. There will be a phased restoration of the quarry void working from the base of the void vertically building up soil and stone. Following completion of the infilling works, natural colonisation of plant species will occur from the seedbank within the redistributed soil; • Continued use of existing operational infrastructure including weighbridge, office, wheel-wash facility, maintenance workshop, lime shed, water storage tanks, refuelling area and plant and machinery storage area; • Continued use of existing site access via the existing entrance off the R613; • All associated site development works. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development
As published by the register.
Site area
51.91 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 3 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Zoning

Not zoned in the current plan.

Protections nearby 250 m

No mapped flood area nearby.

  • NIAH-recorded building · 3
    rectory/glebe/vicarage/curate's house; church/chapel
  • Recorded monument · 16
    Ritual site - holy well; Graveyard

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

26/0819 is a planning application to Cork County Council for we, Roadstone Ltd., intend to apply to Cork County Council for a 30-year planning, received on 1 Apr 2026; no decision has been recorded yet.