PlanningRegister.ie
Dublin City Council · 2681/20

The former electricity substation building (a Protected Structure) at Alexandra Road And East Wall Road, Dublin Port, Dublin 1

Approved, built and signed off.

  1. 8 May 2020Received
  2. 17 Jul 2020Approved
  3. 28 Aug 2020Final approval
  4. 29 Sept 2021Building started
  5. 19 Jul 2023Signed off
Status
Building started
Decision
Approved · 17 Jul 2020
Council
Dublin City Council
Type
Permission
Site
829 m²

Live near The former electricity substation…?

Everything else planned on your street, in one report.

Check my street

What’s proposed

PROTECTED STRUCTURE: The proposed development will consist of the change of use, renovation and extension of the existing two storey protected structure to provide a new distributed museum, exhibition and multi-functional space to be operated by Dublin Port Company. The development will include: stability improvement works to the protected structure comprising underpinning and rehabilitation works of existing masonry walls, piling works to a new ground floor slab, construction of additional internal structural steelwork, and removal of existing temporary shoring and bracing; removal of stairs and first floor mezzanine slab (60sqm) within the protected structure; provision of lighting to the exterior of the protected structure; excavation works within the protected structure to expose the historic sea wall running under the site boundary with East Wall Road (15.9sqm), and provision of waterproofing, drainage measures and a protective railing; part removal of the existing southern façade to form an opening to a proposed contemporary flat roof glazed extension (7.4m in height providing an additional 86sqm at ground floor level and 13.2sqm at first floor level) to provide additional museum/exhibition floor space, a service area, unisex WC and storage area; provision of solar photovoltaic panels at roof level of the protected structure and proposed extension; rearrangement of the landscaped public plaza to the south of the protected structure to include new/relocated seating arrangements, lighting column, planting and resurfacing; and all associated ancillary site development works including revised utilities/drainage arrangements

Planning details

Reference
2681/20
Local authority
Dublin City Council
Status
Commenced · register status “Decision Notice Issued”
Received
8 May 2020
Observations close
12 Jun 2020 (closed 2305 days ago)
Decision due
17 Jul 2020 · decided 17 Jul 2020
Decision
Grant permission on 17 Jul 2020
Proposed development
PROTECTED STRUCTURE: The proposed development will consist of the change of use, renovation and extension of the existing two storey protected structure to provide a new distributed museum, exhibition and multi-functional space to be operated by Dublin Port Company. The development will include: stability improvement works to the protected structure comprising underpinning and rehabilitation works of existing masonry walls, piling works to a new ground floor slab, construction of additional internal structural steelwork, and removal of existing temporary shoring and bracing; removal of stairs and first floor mezzanine slab (60sqm) within the protected structure; provision of lighting to the exterior of the protected structure; excavation works within the protected structure to expose the historic sea wall running under the site boundary with East Wall Road (15.9sqm), and provision of waterproofing, drainage measures and a protective railing; part removal of the existing southern façade to form an opening to a proposed contemporary flat roof glazed extension (7.4m in height providing an additional 86sqm at ground floor level and 13.2sqm at first floor level) to provide additional museum/exhibition floor space, a service area, unisex WC and storage area; provision of solar photovoltaic panels at roof level of the protected structure and proposed extension; rearrangement of the landscaped public plaza to the south of the protected structure to include new/relocated seating arrangements, lighting column, planting and resurfacing; and all associated ancillary site development works including revised utilities/drainage arrangements
As published by the register.
Site area
829 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 64 · 500 m · 5 years

Show all 64

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Building started

  • 29 Sept 2021 · Builder told the council work was starting (seven-day notice) SN0006547DC

Zoning

Zone Z7 - DEV PLAN 2022-2028

C2.2 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 3
    P1022; Dublin Port Company
  • NIAH-recorded building · 4
    electricity substation; building misc
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

2681/20 is a planning application to Dublin City Council for pROTECTED STRUCTURE: The proposed development will consist of the change of use, received on 8 May 2020; permission was granted on 17 Jul 2020.