Planning Register
Dublin City Council · 3041/22 · Permission

The site of c. 0.94 ha at lands South of Belcamp 220 kV Substation, Belcamp, Dublin 17

Data updated 13 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 12 Jan 2022We first saw it 11 Sept 2026, 18:51 (1704 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

3041/22 is a planning application for permission at The site of c. 0.94 ha at lands South of Belcamp 220 kV Substation, Belcamp, Dublin 17, received by Dublin City Council on 12 Jan 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation , Belcamp Dublin 17 . The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours. The council granted permission on 30 Aug 2022. The five-week observation window closed on 16 Feb 2022. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 7 other decided applications in the last five years.

Appeal window closes 27 Sept 2022 closed 1447 days ago
4 weeks from the council's decision (30 Aug 2022) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation , Belcamp Dublin 17 . The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours.

Status
Decision Notice Issued
Decision
Grant permission on 30 Aug 2022
Final grant
11 Oct 2022
Site (from polygon)
1.20 ha
Location precision
site (coords_polygon)

Timeline

  • 12 Jan 2022
    New application
    Observation window closed 16 Feb 2022
  • 8 Mar 2022
    Further information requested
  • 3 Aug 2022
    Further information received
  • 30 Aug 2022
    Decision
    Appeal window closed 27 Sept 2022

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.40787, -6.20274

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z14 - DEV PLAN 2022-2028

    R3 — Rural cluster

    Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

    A small rural settlement where only modest infill serving local need is envisaged.

    HT - High Technology: Facilitate opportunities for high technology, high technology and advanced manufacturing, major office and research and development based employment within high quality, highly accessible, campus style settings. The HT zoning is aimed at providing a location for high end, high quality, value added businesses and corporate headquarters. An emphasis on exemplar sustainable design and aesthetic quality will be promoted to enhance corporate image and identity.

    C3 — High technology

    HT - High Technology: Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

    Zoned for office, research and development and high-technology manufacturing.

    G4 — Open space

    OS - Open Space: Preserve and provide for open space and recreational amenities

    Open space and recreational amenity, to be preserved as such.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • NIAH-recorded building · 2
      Belcamp House; icehouse
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 2
      House - 16th/17th century; R149742

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 86863). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open