Lands within the Poolbeg Generating Station complex, Pigeon House Road, Dublin 4, D04 XD82
Approved in Dec 2023. Building started in 2025.
What’s proposed
The proposed development will consist of: 1. Demolition of the existing Babcock Store building; 1 No. Hydrogen Tank; the temporary Control Building; 1 No. Water Tank within the National Oil Reserves Agency (NORA) Bunded Area 2.
Show all
Construction/ installation of an OCGT generating unit and associated plant and equipment, comprising the following main components: - An exhaust stack approx. 40m in height (approx. 8m diameter and 40m H) - Gas Turbine Air Intake (approx. 24m L x 18m W x 26m H) - Generator Enclosure (approx. 24m L x 18m W x 14.5m H) - Gas turbine enclosure including Gas Turbine auxiliaries and loading / rotor turning area (approx. 53m L x 15mW x 26m H) - Exhaust Diffuser (approx. 14.5m L x 10.4m W x 10.5m H) - Gas Turbine Power Control and Electrical Control & Instrumentation (C&I) Module (approx. 24m L x 18m W x 10m H) - 9No. Fin Fan Coolers (approx.27m L x 19m W x 8m H) - Main Transformer (approx. 12.2m L x 7.5m W x 9.3m H), including - 17.5m x 18m bund; and -3No 12m high Blast Walls - Auxiliary Transformer (approx.4.9m L x4.7m W x 6.9m H) - 6.8m x 7.5m bund; and - 2No 12m high Blast Walls - Demineralised Water Treatment Plant (approx.20m L x 10m W x 5.4m H) - Demineralised Water Tank (approx.22.3m diameter and 14.6m H) - Raw/Fire Water Tank (approx.15.2m diameter and 14.6m H) - 8,000m3 Distillate Fuel (Secondary Oil Tank (approx.27.2m diameter and 17.6m H) - Including 8No 1.7m high Baffle Walls surrounding the tank - Fuel Oil Forwarding Pump (approx.8.9m L x 7.8m W x 2.2m H) - Fire Fighting Pumphouse (approx. 12m L x 7m W x 5.4m H) - 1 No. <1 MW thermal output emergency diesel generator 250KWe (approx. 10m L x 4m W x 5m H) - Generator Circuit Breaker (approx.8.8m L x5.1m W x 4m H) - 2 No. Water (replacement) Firewater Tanks for NORA (approx.13m diameter and 14.6m H) - 3-Bay 220kV Indoor Switchgear Building (approx.30m L x 18m W x 18m H) and 3 No. bolted connections (approx.12.5m L x 15m W x 15m H) - Gas Conditioning Compound (approx. 42.2m L x 11.4m W x 3.6m H) which includes: - Gas Compressor and Auxiliaries Building (approx. 24m L x 7.5m W x 5m H) - Gas Compressor Reducing Building (approx. 8m L x 6m W x 6m H); and - Gas Compressor Cooler (approx. 7m L x 4m W x 5m H) - Hydrogen Storage Compound (approx. 6m L x 3.5m W x 3m H) - Continuous Emissions Monitoring System (CEMS) (approx. 3.5m L x 2.5m W x 5m H) - CCGT Stores Building (approx. 15m Lx 14m W x 10m H) - Workshop, Stores and Administration Building (approx. 23m L x 22m W x 15m H) 3. Connection to the existing gas Above Ground Installation (AGI); 4. Connection to the National Grid via the existing 220kV Poolbeg Substation; and 5. All associated works to facilitate the development (e.g. temporary construction compound, perimeter fencing, blast and baffle walls, above-ground pipe racks, underground cables, a new lighting arrangement, lightning and telecommunication masts, parking and surface water drainage network including a new stormwater outfall. All works will take place within the grounds of the ESB Poolbeg Generating station complex. The development consists of an activity for which an Industrial Emissions Licence is required. An Environmental Impact Assessment Report (EIAR) which compiles with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I 296 of 2018 and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
- 31 Jan 2023Received
- 2 Nov 2023Approved
- 11 Dec 2023Final approval
- 31 Jan 2025Building started
Planning details
- Status
- Building startedi
- Decision
- Approved · 2 Nov 2023
- Reference
- 3137/23
- Received
- 31 Jan 2023
- Further information
- Requested 22 Aug 2023 · received 8 Sept 2023
- Site
- 7.24 ha
7 other applications within 500 m in five years
Get the full reportNearby 7 · 500 m · 5 years
- CommencedPoolbeg AGI, Poolbeg Power Station, Pigeon House Road, Dublin 4
- WithdrawnPoolbeg AGI, Poolbeg Power Station, Pigeon House Road, Dublin 4
- WithdrawnPoolbeg Power Station, Pigeon House Road, Dublin 4
- WithdrawnPoolbeg Power Station, Pigeon House Rd, Dublin 4
- GrantedPoolbeg Power Station, Pigeon House Road, Dublin 4
- WithdrawnPoolbeg Power Station, Pigeon House Rd, Dublin 4
- CommencedPoolbeg 220kV Electrical Substation and adjacent land, Pigeon House Road, Dublin 4 on site measuring 3.6haAB[ Ref:.
Homes nearby
- For sale221 Clontarf Road, Clontarf, Dublin 3, D03 K5Y3
- For sale41 Merrion Strand, Sandymount, Dublin 4, D04 H6R6
- For saleApartment 7 Strand House, 171 Strand Road, Sandymount, Dublin 4, D04 ET20
- WithdrawnApartment 3, 219 Clontarf Road, Clontarf, Dublin 3, D03 AP57
- WithdrawnApartment 1, Seabury, Sandymount, Dublin 4, D04 XR79
- Withdrawn41 Merrion Strand, Sandymount, Dublin 4, D04 H6R6
Development land nearby
- Public land off Poolbeg Generating Station, Pigeon House Road… (0.1 km)
- Public land off Poolbeg Power Station, Pigeon House Road, Dublin 4 (0.2 km)
- Public land off Poolbeg Power Station, Pigeon House Road, Dublin 4 (0.2 km)
- Public land off Poolbeg Generating Station, Pigeon House Road… (0.2 km)
- Public land off Poolbeg Generating Station, Pigeon House Road… (0.2 km)
Building started
- 30 Nov 2026 · Builder told the council work was starting (seven-day notice) SN0015228DC
- 30 Nov 2026 · Builder told the council work was starting (seven-day notice) SN0015238DC
- 30 Nov 2026 · Builder told the council work was starting (seven-day notice) SN0015235DC
- 30 Nov 2026 · Builder told the council work was starting (seven-day notice) SN0015236DC
- 13 Apr 2026 · Builder told the council work was starting (seven-day notice) SN0013999DC
- 2 Mar 2026 · Builder told the council work was starting (seven-day notice) SN0013810DC
- 2 Mar 2026 · Builder told the council work was starting (seven-day notice) SN0013809DC
- 9 Apr 2025 · Builder told the council work was starting (seven-day notice) SN0012291DC
- 31 Jan 2025 · Builder told the council work was starting (seven-day notice) SN0012009DC
Zoning
Zone Z14 - DEV PLAN 2022-2028
Zoned for employment uses. Housing is not the intended use here.
Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
A small rural settlement where only modest infill serving local need is envisaged.
Protections nearby 250 m
Flood area nearby (OPW maps). floodinfo.ie ↗
- EPA-licensed facility · 3
- Natural Heritage Area (incl. proposed) · 2
- Special Area of Conservation · 1
- Recorded monument · 6
- Special Protection Area · 1
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
3137/23 is a planning application to Dublin City Council for the proposed development will consist of: 1. Demolition of the existing Babcock Store, received on 31 Jan 2023; permission was granted on 2 Nov 2023.