Dublin City Council · 3137/23

Lands within the Poolbeg Generating Station complex, Pigeon House Road, Dublin 4, D04 XD82

  1. 31 Jan 2023Received
  2. 2 Nov 2023Grant permission
  3. 11 Dec 2023Final grant
  4. 13 Apr 2026Commenced
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
Status
Commenced
Decision
Grant permission · 2 Nov 2023
Council
Dublin City Council
Type
Permission
Site
7.24 ha

What’s proposed

The proposed development will consist of: 1. Demolition of the existing Babcock Store building; 1 No. Hydrogen Tank; the temporary Control Building; 1 No. Water Tank within the National Oil Reserves Agency (NORA) Bunded Area 2. Construction/ installation of an OCGT generating unit and associated plant and equipment, comprising the following main components: - An exhaust stack approx. 40m in height (approx. 8m diameter and 40m H) - Gas Turbine Air Intake (approx. 24m L x 18m W x 26m H) - Generator Enclosure (approx. 24m L x 18m W x 14.5m H) - Gas turbine enclosure including Gas Turbine auxiliaries and loading / rotor turning area (approx. 53m L x 15mW x 26m H) - Exhaust Diffuser (approx. 14.5m L x 10.4m W x 10.5m H) - Gas Turbine Power Control and Electrical Control & Instrumentation (C&I) Module (approx. 24m L x 18m W x 10m H) - 9No. Fin Fan Coolers (approx.27m L x 19m W x 8m H) - Main Transformer (approx. 12.2m L x 7.5m W x 9.3m H), including - 17.5m x 18m bund; and -3No 12m high Blast Walls - Auxiliary Transformer (approx.4.9m L x4.7m W x 6.9m H) - 6.8m x 7.5m bund; and - 2No 12m high Blast Walls - Demineralised Water Treatment Plant (approx.20m L x 10m W x 5.4m H) - Demineralised Water Tank (approx.22.3m diameter and 14.6m H) - Raw/Fire Water Tank (approx.15.2m diameter and 14.6m H) - 8,000m3 Distillate Fuel (Secondary Oil Tank (approx.27.2m diameter and 17.6m H) - Including 8No 1.7m high Baffle Walls surrounding the tank - Fuel Oil Forwarding Pump (approx.8.9m L x 7.8m W x 2.2m H) - Fire Fighting Pumphouse (approx. 12m L x 7m W x 5.4m H) - 1 No. <1 MW thermal output emergency diesel generator 250KWe (approx. 10m L x 4m W x 5m H) - Generator Circuit Breaker (approx.8.8m L x5.1m W x 4m H) - 2 No. Water (replacement) Firewater Tanks for NORA (approx.13m diameter and 14.6m H) - 3-Bay 220kV Indoor Switchgear Building (approx.30m L x 18m W x 18m H) and 3 No. bolted connections (approx.12.5m L x 15m W x 15m H) - Gas Conditioning Compound (approx. 42.2m L x 11.4m W x 3.6m H) which includes: - Gas Compressor and Auxiliaries Building (approx. 24m L x 7.5m W x 5m H) - Gas Compressor Reducing Building (approx. 8m L x 6m W x 6m H); and - Gas Compressor Cooler (approx. 7m L x 4m W x 5m H) - Hydrogen Storage Compound (approx. 6m L x 3.5m W x 3m H) - Continuous Emissions Monitoring System (CEMS) (approx. 3.5m L x 2.5m W x 5m H) - CCGT Stores Building (approx. 15m Lx 14m W x 10m H) - Workshop, Stores and Administration Building (approx. 23m L x 22m W x 15m H) 3. Connection to the existing gas Above Ground Installation (AGI); 4. Connection to the National Grid via the existing 220kV Poolbeg Substation; and 5. All associated works to facilitate the development (e.g. temporary construction compound, perimeter fencing, blast and baffle walls, above-ground pipe racks, underground cables, a new lighting arrangement, lightning and telecommunication masts, parking and surface water drainage network including a new stormwater outfall. All works will take place within the grounds of the ESB Poolbeg Generating station complex. The development consists of an activity for which an Industrial Emissions Licence is required. An Environmental Impact Assessment Report (EIAR) which compiles with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I 296 of 2018 and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application

3137/23 is a planning application to Dublin City Council for the proposed development will consist of: 1. Demolition of the existing Babcock Store, received on 31 Jan 2023; permission was granted on 2 Nov 2023.

Planning details

Reference
3137/23
Local authority
Dublin City Council
Status
Commenced · register status “Decision Notice Issued
Received
31 Jan 2023
Observations close
7 Mar 2023 (closed 1287 days ago)
Decision due
2 Nov 2023 · decided 2 Nov 2023
Decision
Grant permission on 2 Nov 2023
Proposed development
The proposed development will consist of: 1. Demolition of the existing Babcock Store building; 1 No. Hydrogen Tank; the temporary Control Building; 1 No. Water Tank within the National Oil Reserves Agency (NORA) Bunded Area 2. Construction/ installation of an OCGT generating unit and associated plant and equipment, comprising the following main components: - An exhaust stack approx. 40m in height (approx. 8m diameter and 40m H) - Gas Turbine Air Intake (approx. 24m L x 18m W x 26m H) - Generator Enclosure (approx. 24m L x 18m W x 14.5m H) - Gas turbine enclosure including Gas Turbine auxiliaries and loading / rotor turning area (approx. 53m L x 15mW x 26m H) - Exhaust Diffuser (approx. 14.5m L x 10.4m W x 10.5m H) - Gas Turbine Power Control and Electrical Control & Instrumentation (C&I) Module (approx. 24m L x 18m W x 10m H) - 9No. Fin Fan Coolers (approx.27m L x 19m W x 8m H) - Main Transformer (approx. 12.2m L x 7.5m W x 9.3m H), including - 17.5m x 18m bund; and -3No 12m high Blast Walls - Auxiliary Transformer (approx.4.9m L x4.7m W x 6.9m H) - 6.8m x 7.5m bund; and - 2No 12m high Blast Walls - Demineralised Water Treatment Plant (approx.20m L x 10m W x 5.4m H) - Demineralised Water Tank (approx.22.3m diameter and 14.6m H) - Raw/Fire Water Tank (approx.15.2m diameter and 14.6m H) - 8,000m3 Distillate Fuel (Secondary Oil Tank (approx.27.2m diameter and 17.6m H) - Including 8No 1.7m high Baffle Walls surrounding the tank - Fuel Oil Forwarding Pump (approx.8.9m L x 7.8m W x 2.2m H) - Fire Fighting Pumphouse (approx. 12m L x 7m W x 5.4m H) - 1 No. <1 MW thermal output emergency diesel generator 250KWe (approx. 10m L x 4m W x 5m H) - Generator Circuit Breaker (approx.8.8m L x5.1m W x 4m H) - 2 No. Water (replacement) Firewater Tanks for NORA (approx.13m diameter and 14.6m H) - 3-Bay 220kV Indoor Switchgear Building (approx.30m L x 18m W x 18m H) and 3 No. bolted connections (approx.12.5m L x 15m W x 15m H) - Gas Conditioning Compound (approx. 42.2m L x 11.4m W x 3.6m H) which includes: - Gas Compressor and Auxiliaries Building (approx. 24m L x 7.5m W x 5m H) - Gas Compressor Reducing Building (approx. 8m L x 6m W x 6m H); and - Gas Compressor Cooler (approx. 7m L x 4m W x 5m H) - Hydrogen Storage Compound (approx. 6m L x 3.5m W x 3m H) - Continuous Emissions Monitoring System (CEMS) (approx. 3.5m L x 2.5m W x 5m H) - CCGT Stores Building (approx. 15m Lx 14m W x 10m H) - Workshop, Stores and Administration Building (approx. 23m L x 22m W x 15m H) 3. Connection to the existing gas Above Ground Installation (AGI); 4. Connection to the National Grid via the existing 220kV Poolbeg Substation; and 5. All associated works to facilitate the development (e.g. temporary construction compound, perimeter fencing, blast and baffle walls, above-ground pipe racks, underground cables, a new lighting arrangement, lightning and telecommunication masts, parking and surface water drainage network including a new stormwater outfall. All works will take place within the grounds of the ESB Poolbeg Generating station complex. The development consists of an activity for which an Industrial Emissions Licence is required. An Environmental Impact Assessment Report (EIAR) which compiles with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I 296 of 2018 and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application
As published by the register.
Site area
7.24 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Around this site this application first, then everything within 500 m

Explore from hereFree report
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.33921, -6.18739

Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

  • Seven day notice SN0013999DC
    13 Apr 2026Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0013809DC
    2 Mar 2026Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0013810DC
    2 Mar 2026Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0012291DC
    9 Apr 2025Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0012009DC
    31 Jan 2025Pigeon House Road, Dublin, Dublin 4matched by ref_exact

Zoning at the site

Zone Z9 - DEV PLAN 2022-2028

C2.2 — Economic development and employment

Z7: Employment (Heavy): To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

Zoned for employment uses. Housing is not the intended use here.

G5 — Open space and amenity

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R3 — Rural cluster

Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

A small rural settlement where only modest infill serving local need is envisaged.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • EPA-licensed facility · 3
    P0577; Electricity Supply Board; Electricity Supply Board
  • Natural Heritage Area (incl. proposed) · 2
    Dolphins, Dublin Docks; South Dublin Bay
  • Special Area of Conservation · 1
    South Dublin Bay SAC
  • Recorded monument · 6
    Battery; Sea wall; Signal tower
  • Special Protection Area · 1
    South Dublin Bay and River Tolka Estuary SPA

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 89028). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open