Planning Register
Dublin City Council · 3137/23 · Permission

Lands within the Poolbeg Generating Station complex, Pigeon House Road, Dublin 4, D04 XD82

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 31 Jan 2023We first saw it 11 Sept 2026, 18:51 (1320 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

3137/23 is a planning application for permission at Lands within the Poolbeg Generating Station complex, Pigeon House Road, Dublin 4, D04 XD82, received by Dublin City Council on 31 Jan 2023 and first seen by Planning Register on 11 Sept 2026. The application describes: The proposed development will consist of: 1. Demolition of the existing Babcock Store building; 1 No. Hydrogen Tank; the temporary Control Building; 1 No. Water Tank within the National Oil Reserves Agency (NORA) Bunded Area 2. Construction/ installation of an OCGT generating unit and associated plant and equipment, comprising the following main components: - An exhaust stack approx. 40m in height (approx. 8m diameter and 40m H) - Gas Turbine Air Intake (approx. 24m L x 18m W x 26m H) - Generator Enclosure (approx. 24m L x 18m W x 14.5m H) - Gas turbine enclosure including Gas Turbine auxiliaries and loading / rotor turning area (approx. 53m L x 15mW x 26m H) - Exhaust Diffuser (approx. 14.5m L x 10.4m W x 10.5m H) - Gas Turbine Power Control and Electrical Control & Instrumentation (C&I) Module (approx. 24m L x 18m W x 10m H) - 9No. Fin Fan Coolers (approx.27m L x 19m W x 8m H) - Main Transformer (approx. 12.2m L x 7.5m W x 9.3m H), including - 17.5m x 18m bund; and -3No 12m high Blast Walls - Auxiliary Transformer (approx.4.9m L x4.7m W x 6.9m H) - 6.8m x 7.5m bund; and - 2No 12m high Blast Walls - Demineralised Water Treatment Plant (approx.20m L x 10m W x 5.4m H) - Demineralised Water Tank (approx.22.3m diameter and 14.6m H) - Raw/Fire Water Tank (approx.15.2m diameter and 14.6m H) - 8,000m3 Distillate Fuel (Secondary Oil Tank (approx.27.2m diameter and 17.6m H) - Including 8No 1.7m high Baffle Walls surrounding the tank - Fuel Oil Forwarding Pump (approx.8.9m L x 7.8m W x 2.2m H) - Fire Fighting Pumphouse (approx. 12m L x 7m W x 5.4m H) - 1 No. <1 MW thermal output emergency diesel generator 250KWe (approx. 10m L x 4m W x 5m H) - Generator Circuit Breaker (approx.8.8m L x5.1m W x 4m H) - 2 No. Water (replacement) Firewater Tanks for NORA (approx.13m diameter and 14.6m H) - 3-Bay 220kV Indoor Switchgear Building (approx.30m L x 18m W x 18m H) and 3 No. bolted connections (approx.12.5m L x 15m W x 15m H) - Gas Conditioning Compound (approx. 42.2m L x 11.4m W x 3.6m H) which includes: - Gas Compressor and Auxiliaries Building (approx. 24m L x 7.5m W x 5m H) - Gas Compressor Reducing Building (approx. 8m L x 6m W x 6m H); and - Gas Compressor Cooler (approx. 7m L x 4m W x 5m H) - Hydrogen Storage Compound (approx. 6m L x 3.5m W x 3m H) - Continuous Emissions Monitoring System (CEMS) (approx. 3.5m L x 2.5m W x 5m H) - CCGT Stores Building (approx. 15m Lx 14m W x 10m H) - Workshop, Stores and Administration Building (approx. 23m L x 22m W x 15m H) 3. Connection to the existing gas Above Ground Installation (AGI); 4. Connection to the National Grid via the existing 220kV Poolbeg Substation; and 5. All associated works to facilitate the development (e.g. temporary construction compound, perimeter fencing, blast and baffle walls, above-ground pipe racks, underground cables, a new lighting arrangement, lightning and telecommunication masts, parking and surface water drainage network including a new stormwater outfall. All works will take place within the grounds of the ESB Poolbeg Generating station complex. The development consists of an activity for which an Industrial Emissions Licence is required. An Environmental Impact Assessment Report (EIAR) which compiles with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I 296 of 2018 and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The council granted permission on 2 Nov 2023. The five-week observation window closed on 7 Mar 2023. A commencement notice (SN0013999DC) was lodged on 13 Apr 2026, so works have started on site. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 7 other decided applications in the last five years and 1 appeal.

Appeal window closes 30 Nov 2023 closed 1018 days ago
4 weeks from the council's decision (2 Nov 2023) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

The proposed development will consist of: 1. Demolition of the existing Babcock Store building; 1 No. Hydrogen Tank; the temporary Control Building; 1 No. Water Tank within the National Oil Reserves Agency (NORA) Bunded Area 2. Construction/ installation of an OCGT generating unit and associated plant and equipment, comprising the following main components: - An exhaust stack approx. 40m in height (approx. 8m diameter and 40m H) - Gas Turbine Air Intake (approx. 24m L x 18m W x 26m H) - Generator Enclosure (approx. 24m L x 18m W x 14.5m H) - Gas turbine enclosure including Gas Turbine auxiliaries and loading / rotor turning area (approx. 53m L x 15mW x 26m H) - Exhaust Diffuser (approx. 14.5m L x 10.4m W x 10.5m H) - Gas Turbine Power Control and Electrical Control & Instrumentation (C&I) Module (approx. 24m L x 18m W x 10m H) - 9No. Fin Fan Coolers (approx.27m L x 19m W x 8m H) - Main Transformer (approx. 12.2m L x 7.5m W x 9.3m H), including - 17.5m x 18m bund; and -3No 12m high Blast Walls - Auxiliary Transformer (approx.4.9m L x4.7m W x 6.9m H) - 6.8m x 7.5m bund; and - 2No 12m high Blast Walls - Demineralised Water Treatment Plant (approx.20m L x 10m W x 5.4m H) - Demineralised Water Tank (approx.22.3m diameter and 14.6m H) - Raw/Fire Water Tank (approx.15.2m diameter and 14.6m H) - 8,000m3 Distillate Fuel (Secondary Oil Tank (approx.27.2m diameter and 17.6m H) - Including 8No 1.7m high Baffle Walls surrounding the tank - Fuel Oil Forwarding Pump (approx.8.9m L x 7.8m W x 2.2m H) - Fire Fighting Pumphouse (approx. 12m L x 7m W x 5.4m H) - 1 No. <1 MW thermal output emergency diesel generator 250KWe (approx. 10m L x 4m W x 5m H) - Generator Circuit Breaker (approx.8.8m L x5.1m W x 4m H) - 2 No. Water (replacement) Firewater Tanks for NORA (approx.13m diameter and 14.6m H) - 3-Bay 220kV Indoor Switchgear Building (approx.30m L x 18m W x 18m H) and 3 No. bolted connections (approx.12.5m L x 15m W x 15m H) - Gas Conditioning Compound (approx. 42.2m L x 11.4m W x 3.6m H) which includes: - Gas Compressor and Auxiliaries Building (approx. 24m L x 7.5m W x 5m H) - Gas Compressor Reducing Building (approx. 8m L x 6m W x 6m H); and - Gas Compressor Cooler (approx. 7m L x 4m W x 5m H) - Hydrogen Storage Compound (approx. 6m L x 3.5m W x 3m H) - Continuous Emissions Monitoring System (CEMS) (approx. 3.5m L x 2.5m W x 5m H) - CCGT Stores Building (approx. 15m Lx 14m W x 10m H) - Workshop, Stores and Administration Building (approx. 23m L x 22m W x 15m H) 3. Connection to the existing gas Above Ground Installation (AGI); 4. Connection to the National Grid via the existing 220kV Poolbeg Substation; and 5. All associated works to facilitate the development (e.g. temporary construction compound, perimeter fencing, blast and baffle walls, above-ground pipe racks, underground cables, a new lighting arrangement, lightning and telecommunication masts, parking and surface water drainage network including a new stormwater outfall. All works will take place within the grounds of the ESB Poolbeg Generating station complex. The development consists of an activity for which an Industrial Emissions Licence is required. An Environmental Impact Assessment Report (EIAR) which compiles with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I 296 of 2018 and a Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.

Status
Decision Notice Issued
Decision
Grant permission on 2 Nov 2023
Final grant
11 Dec 2023
Site (from polygon)
7.24 ha
Location precision
site (coords_polygon)

Timeline

  • 31 Jan 2023
    New application
    Observation window closed 7 Mar 2023
  • 22 Aug 2023
    Further information requested
  • 8 Sept 2023
    Further information received
  • 2 Nov 2023
    Decision
    Appeal window closed 30 Nov 2023

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.33921, -6.18739

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

  • Seven day notice SN0013999DC
    13 Apr 2026Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0013809DC
    2 Mar 2026Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0013810DC
    2 Mar 2026Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0012291DC
    9 Apr 2025Pigeon House Road, Dublin, Dublin 4matched by ref_exact
  • Seven day notice SN0012009DC
    31 Jan 2025Pigeon House Road, Dublin, Dublin 4matched by ref_exact

Zoning at the site

Zone Z9 - DEV PLAN 2022-2028

C2.2 — Economic development and employment

Z7: Employment (Heavy): To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

Zoned for employment uses. Housing is not the intended use here.

G5 — Open space and amenity

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R3 — Rural cluster

Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

A small rural settlement where only modest infill serving local need is envisaged.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • EPA-licensed facility · 3
    P0577; Electricity Supply Board; Electricity Supply Board
  • Natural Heritage Area (incl. proposed) · 2
    Dolphins, Dublin Docks; South Dublin Bay
  • Special Area of Conservation · 1
    South Dublin Bay SAC
  • Recorded monument · 6
    Battery; Sea wall; Signal tower
  • Special Protection Area · 1
    South Dublin Bay and River Tolka Estuary SPA

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 89028). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open