The chq Building (formerly 'Stack A', a Protected Structure, RPS No. 2094), Custom House Quay, Dublin 1
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
3251/23 is a planning application for permission at The chq Building (formerly 'Stack A', a Protected Structure, RPS No. 2094), Custom House Quay, Dublin 1, received by Dublin City Council on 22 Feb 2023 and first seen by Planning Register on 11 Sept 2026. The application describes: PROTECTED STRUCTURE: PERMISSION: The proposals comprise alterations of The chq Building including change of use of existing floor space to facilitate a licenced food market at ground floor level (part), exhibition and event space (including dining, licenced restaurant) at mezzanine level (part) and the partial demolition of existing service buildings and provision of an extended services building. The development will consist of the partial demolition of 2 no. service buildings (external walls retained) and the provision of c. 2,952 sqm new floor area as follows: at basement (c. 246 sqm), ground floor (c. 134 sqm), mezzanine level (c. 691 sqm) and service building (c. 1,881 sqm); change of use of c. 4,829 sqm of existing retail/restaurant/storage units/office to food market at basement level (c. 28 sqm) and ground floor level (c. 2,094 sqm) and exhibition / event space (including dining and licenced restaurant use) at mezzanine level (c. 2,707sqm). Food and alcohol will be served within the food hall, galleria and outside area and the following works to The chq Building: 1. West-Elevation - New central entrance & stair & lift access from George's Dock including change of use of unit C1 (retail) and units 20 and 21 (restaurant) to food market use and circulation. The restoration of lost granite arched entrance and the provision of cast-iron doors and frame in its original location in the west elevation. 2. South-elevation Custom House Quay - Removal of modern restrictive revolving door and flight of steps and replacement with wider sliding doors and wider flight of steps to provide better access to and from chq building. 3. South Mall Area - (Ground Floor Level) - Change of use of existing chq units 1A - 11B, 13-15 & 18-19 from retail /restaurant to food market (providing 30 market units in total) and ancillary uses (cloakroom / locker area to rear of Units 18 & 19). 4. South-East mezzanine level (currently vacant/storage) Exhibition/event space (including dining) and pre-event space 01 with feature stairs and lift access from galleria; lowering of mezzanine by c. 300 mm. 5. Extended existing unit 1A (c. 49 sqm) to provide additional mezzanine floor area for winter garden at existing Dogpatch Labs, Startup Hub and shared office space. 6. Extension of existing unit 2 (c. 39 sqm) to provide additional mezzanine floor area for circulation to new exhibition event space. 7. North-West mezzanine - change of use from currently vacant/storage use to exhibition/event space and improved fire escape stairs (amendments to Unit 31 at ground floor level). 8. South-West mezzanine - change of use from currently vacant/storage use to exhibition/event space including pre-event space 02 with pop up unit, keg room & restroom provision, with feature stairs accessed from market entrance. 9. Provision of two no. internal bridges / viewing platforms to connect east & west mezzanine Levels. 10. Partial demolition (external walls retained) and extension to two no. existing service buildings at eastern elevation to provide a 5-storey mixed-use building over extended basement (total floor area c. 3,717 sqm including basement), (with enclosed roof level above behind brick parapet wall and (part) covered with green roof), to provide back of house facilities including staff, office and event service use and bicycle parking (44 spaces) (at ground to second floor levels) & office space (at third and fourth floor levels) and installation of fall-arrest system and plant at roof level. Building to have pedestrian access from George's Dock to the north and vehicular access to loading bays at car park at eastern elevation via Exchange Place. 11.Provision of 30 no. new openable glazed rooflights to the inner slopes of the chq roof and removal of forty-six existing glazed rooflights and replacement with openable glazed roof lights (AOVS) to match existing. Removal of fifty-six small panes of glass in cast-iron lanterns lights and replacement with metal grills and installation of fall-arrest system. 12. Provision of designated outdoor seating for food market at George's Dock adjacent to west elevation. 13. Extended floor area (c. 246 sqm) at basement/vault level (east) for required additional fire escape access, fridge room, keg room, workshop and improved services and change of use from office space to museum restroom at basement level (west). 14. Provision of thirteen signage elements on East Elevation, West Elevation, and Southeast Mezzanine totalling c. 25.65 sqm. Signage 1: Central Entrance (3 x 0.93 sqm each); Signage 2: Market Entrance (2 x 0.93 sqm each); Signage 3: Irish Food Market (4 x 2.13 sqm each); Signage 4: Epic CHQ Gala Banquet (4) x 3.12 sqm each). 15. Completion of repairs and renovation of historic and modern fabric as detailed in the Conservation Methodology Statement in compliance with Conservation Best Practice, including restoration of 3 no segmental granite arches at ground floor level in the east elevation and openings in the historic fabric of the east wall including 3 no door openings and a servery opening, to provide access to the services building of the Protected Structure. 16. All associated site works and provision of 18 no. bicycle parking spaces at the northwest elevation. A Natura Impact Statement has been prepared in respect of the planning application. The council granted permission on 19 Jan 2024. The five-week observation window closed on 29 Mar 2023. A commencement notice (SN0014296DC) was lodged on 15 Jun 2026, so works have started on site. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 134 other decided applications in the last five years and 20 appeals.
Proposal
PROTECTED STRUCTURE: PERMISSION: The proposals comprise alterations of The chq Building including change of use of existing floor space to facilitate a licenced food market at ground floor level (part), exhibition and event space (including dining, licenced restaurant) at mezzanine level (part) and the partial demolition of existing service buildings and provision of an extended services building. The development will consist of the partial demolition of 2 no. service buildings (external walls retained) and the provision of c. 2,952 sqm new floor area as follows: at basement (c. 246 sqm), ground floor (c. 134 sqm), mezzanine level (c. 691 sqm) and service building (c. 1,881 sqm); change of use of c. 4,829 sqm of existing retail/restaurant/storage units/office to food market at basement level (c. 28 sqm) and ground floor level (c. 2,094 sqm) and exhibition / event space (including dining and licenced restaurant use) at mezzanine level (c. 2,707sqm). Food and alcohol will be served within the food hall, galleria and outside area and the following works to The chq Building: 1. West-Elevation - New central entrance & stair & lift access from George's Dock including change of use of unit C1 (retail) and units 20 and 21 (restaurant) to food market use and circulation. The restoration of lost granite arched entrance and the provision of cast-iron doors and frame in its original location in the west elevation. 2. South-elevation Custom House Quay - Removal of modern restrictive revolving door and flight of steps and replacement with wider sliding doors and wider flight of steps to provide better access to and from chq building. 3. South Mall Area - (Ground Floor Level) - Change of use of existing chq units 1A - 11B, 13-15 & 18-19 from retail /restaurant to food market (providing 30 market units in total) and ancillary uses (cloakroom / locker area to rear of Units 18 & 19). 4. South-East mezzanine level (currently vacant/storage) Exhibition/event space (including dining) and pre-event space 01 with feature stairs and lift access from galleria; lowering of mezzanine by c. 300 mm. 5. Extended existing unit 1A (c. 49 sqm) to provide additional mezzanine floor area for winter garden at existing Dogpatch Labs, Startup Hub and shared office space. 6. Extension of existing unit 2 (c. 39 sqm) to provide additional mezzanine floor area for circulation to new exhibition event space. 7. North-West mezzanine - change of use from currently vacant/storage use to exhibition/event space and improved fire escape stairs (amendments to Unit 31 at ground floor level). 8. South-West mezzanine - change of use from currently vacant/storage use to exhibition/event space including pre-event space 02 with pop up unit, keg room & restroom provision, with feature stairs accessed from market entrance. 9. Provision of two no. internal bridges / viewing platforms to connect east & west mezzanine Levels. 10. Partial demolition (external walls retained) and extension to two no. existing service buildings at eastern elevation to provide a 5-storey mixed-use building over extended basement (total floor area c. 3,717 sqm including basement), (with enclosed roof level above behind brick parapet wall and (part) covered with green roof), to provide back of house facilities including staff, office and event service use and bicycle parking (44 spaces) (at ground to second floor levels) & office space (at third and fourth floor levels) and installation of fall-arrest system and plant at roof level. Building to have pedestrian access from George's Dock to the north and vehicular access to loading bays at car park at eastern elevation via Exchange Place. 11.Provision of 30 no. new openable glazed rooflights to the inner slopes of the chq roof and removal of forty-six existing glazed rooflights and replacement with openable glazed roof lights (AOVS) to match existing. Removal of fifty-six small panes of glass in cast-iron lanterns lights and replacement with metal grills and installation of fall-arrest system. 12. Provision of designated outdoor seating for food market at George's Dock adjacent to west elevation. 13. Extended floor area (c. 246 sqm) at basement/vault level (east) for required additional fire escape access, fridge room, keg room, workshop and improved services and change of use from office space to museum restroom at basement level (west). 14. Provision of thirteen signage elements on East Elevation, West Elevation, and Southeast Mezzanine totalling c. 25.65 sqm. Signage 1: Central Entrance (3 x 0.93 sqm each); Signage 2: Market Entrance (2 x 0.93 sqm each); Signage 3: Irish Food Market (4 x 2.13 sqm each); Signage 4: Epic CHQ Gala Banquet (4) x 3.12 sqm each). 15. Completion of repairs and renovation of historic and modern fabric as detailed in the Conservation Methodology Statement in compliance with Conservation Best Practice, including restoration of 3 no segmental granite arches at ground floor level in the east elevation and openings in the historic fabric of the east wall including 3 no door openings and a servery opening, to provide access to the services building of the Protected Structure. 16. All associated site works and provision of 18 no. bicycle parking spaces at the northwest elevation. A Natura Impact Statement has been prepared in respect of the planning application.
- Status
- Decision Notice Issued
- Decision
- Grant permission on 19 Jan 2024
- Final grant
- 28 Feb 2024
- Site (from polygon)
- 9,417 m²
- Location precision
- site (coords_polygon)
Timeline
- 22 Feb 2023New applicationObservation window closed 29 Mar 2023
- 20 Sept 2023Further information requested
- 14 Dec 2023Further information received
- 19 Jan 2024DecisionAppeal window closed 16 Feb 2024

Full planning report for 53.34881, -6.24789
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
- Seven day notice SN0014296DC
Zoning at the site
Zone Z9 - DEV PLAN 2022-2028
Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.
Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
The main town centre — retail, offices, civic uses, apartments.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- NIAH-recorded building · 27
- Radon risk area · 1
- Recorded monument · 5
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88110). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |