PlanningRegister.ie
Dublin City Council · 3308/20/X1

76, 76G & 280 Bannow Road

With the council, no decision yet.

This is 76, 76G & 280 Bannow Road — 69 homes, up to 5 storeys, by Catena Property Company Limited. Read the scheme page →

  1. 12 Aug 2026Received
  2. 16 Sept 2026Observations closed
Status
With the council, no decision yet
Decision
Not yet
Council
Dublin City Council
Type
Extension of Duration of Permission

Live near 76 76G & 280 Bannow Road?

Everything else planned on your street, in one report.

Check my street

What’s proposed

EXT. OF DURATION: The proposed development will consist of the construction of a ‘Build to Rent’ residential development comprising of 69 no. apartments (51 no. 1 beds, 18 no. 2 beds) in 2 no. blocks, to be provided as follows: Block A – a four storey building containing a total of 20 no. apartments comprising of 3 no. 1 beds, 17 no. 2 beds with balconies to north, south and east elevations with ancillary residential amenity facilities including concierge and residential lounge at ground level; Block B – a five storey building containing a total of 49 no. apartments comprising of 48 no. 1 beds, 1 no. 2 beds with balconies to south elevations; a single level basement comprising a total of 33 no car parking spaces, 3 no. motorcycle spaces, 148 no. bicycle parking spaces (128 no. spaces at basement level and 20 no. spaces at ground floor level), ancillary plant room and refuse storage areas; along with a play/activity room, gym facility, utility room in support of the Build to Rent ancillary residential amenities and support facilities; vehicular and pedestrian access will be onto Bannow Road. Construction of a basement level social and community centre/non-residential club (Class 10) unit for the relocation of the Cabra Pigeon Racing Club which will maintain its separate access from the eastern boundary of application site providing access onto Bannow Road; The double height retail unit located at 76 Bannow Road will be modified with a new roof structure, extension and modification to front elevation (south), modifications to north east and west elevations, signage and internal floor area and will be integrated into Block A of the development proposal; Landscaping, boundary treatment, drainage, signage, green roofs and solar pv panels to roof level of Blocks A and B, and all associated site and infrastructure works necessary to facilitate the development. The proposed development will also consist of the demolition of the existing two-storey building located at 280 Bannow Road (known as the Alma Hygiene building together with a kickboxing club) the demolition of the existing single storey warehouse unit and racing pigeon club unit at 76G Bannow Road (known as the Dublin Circus Centre and Cabra Racing Pigeon Club Building) and the demolition of all associated structures on site in order to facilitate the development. The subject site is bounded by Bannow Road to the south, ‘The Coach House’ and Hamilton Square to the west, Broombridge LUAS stop and maintenance depot to the north and a gated service laneway which provides separate access to Cabra Racing Pigeon Club’s Clubhouse to the east

Planning details

Reference
3308/20/X1
Local authority
Dublin City Council
Status
With the council, no decision yet · register status “Registered Application”
Received
12 Aug 2026
Observations close
16 Sept 2026 (closed 25 days ago)
Decision due
No due date published
Decision
Not decided
Proposed development
EXT. OF DURATION: The proposed development will consist of the construction of a ‘Build to Rent’ residential development comprising of 69 no. apartments (51 no. 1 beds, 18 no. 2 beds) in 2 no. blocks, to be provided as follows: Block A – a four storey building containing a total of 20 no. apartments comprising of 3 no. 1 beds, 17 no. 2 beds with balconies to north, south and east elevations with ancillary residential amenity facilities including concierge and residential lounge at ground level; Block B – a five storey building containing a total of 49 no. apartments comprising of 48 no. 1 beds, 1 no. 2 beds with balconies to south elevations; a single level basement comprising a total of 33 no car parking spaces, 3 no. motorcycle spaces, 148 no. bicycle parking spaces (128 no. spaces at basement level and 20 no. spaces at ground floor level), ancillary plant room and refuse storage areas; along with a play/activity room, gym facility, utility room in support of the Build to Rent ancillary residential amenities and support facilities; vehicular and pedestrian access will be onto Bannow Road. Construction of a basement level social and community centre/non-residential club (Class 10) unit for the relocation of the Cabra Pigeon Racing Club which will maintain its separate access from the eastern boundary of application site providing access onto Bannow Road; The double height retail unit located at 76 Bannow Road will be modified with a new roof structure, extension and modification to front elevation (south), modifications to north east and west elevations, signage and internal floor area and will be integrated into Block A of the development proposal; Landscaping, boundary treatment, drainage, signage, green roofs and solar pv panels to roof level of Blocks A and B, and all associated site and infrastructure works necessary to facilitate the development. The proposed development will also consist of the demolition of the existing two-storey building located at 280 Bannow Road (known as the Alma Hygiene building together with a kickboxing club) the demolition of the existing single storey warehouse unit and racing pigeon club unit at 76G Bannow Road (known as the Dublin Circus Centre and Cabra Racing Pigeon Club Building) and the demolition of all associated structures on site in order to facilitate the development. The subject site is bounded by Bannow Road to the south, ‘The Coach House’ and Hamilton Square to the west, Broombridge LUAS stop and maintenance depot to the north and a gated service laneway which provides separate access to Cabra Racing Pigeon Club’s Clubhouse to the east
As published by the register.
Site area
No site boundary mapped
Applicant
Not published — the national feed carries no applicant name

Nearby 84 · 500 m · 5 years

Show all 84

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Zoning

Not zoned in the current plan.

Protections nearby 250 m

No mapped flood area nearby.

  • NIAH-recorded building · 1
    Church of the Most Precious Blood
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels

Where this comes from

National planning feed (NPAD), fetched 4 Oct 2026, 23:38.

Source: council_registers · fetched 4 Oct 2026, 23:38
SourceLicenceFetchedLink
council_registersCC-BY-4.04 Oct 2026, 23:38open
Summary

3308/20/X1 is a planning application to Dublin City Council for EXT. OF DURATION: The proposed development will consist of the construction of a ‘Build, received on 12 Aug 2026; no decision has been recorded yet.