3315/22 is a planning application for permission at La Touche House, Custom House Dock, I.f.S.C. Dublin 1, received by Dublin City Council on 18 Feb 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: We, La Touche S.a.r.l. c/o BCP Capital, 71 Upper Leeson Street, Dublin 4, intend to apply for planning permission for development at this c. 0.4417 ha site at La Touche House, Custom House Dock, International Financial Services Centre, Dublin 1. The proposed development will consist of; the refurbishment/reconfiguration, partial demolition, recladding and vertical extension of an existing (c. 13,275.9 sq.m GFA) 7-storey building to a 10-storey (c. 23,314.3 sq.m GFA) office building with an additional c. 8,068.4 sq.m commercial floorspace provided and a total height of c. 45.84 m from ground (50.85m ODM), including the following: 1) Partial demolition of the existing fifth floor and the existing sixth floor plant rooms and external plant areas to fifth floor slab level, comprising a combined area of c. 1528.5sq.m removed, the removal of an existing bridge link across the atrium, and maintaining the existing c. 565.1 sq.m of office space and the existing core areas to the east, west and south; 2) Refurbishment and reconfiguration of the existing office building as follows:- a) Basement level: Reduction in car parking provision from 143 no. to 99 no. retained spaces, reconfiguration of existing plant areas, increased bicycle parking to 184 no. spaces, provision of bicycle storage areas, locker room, changing rooms, staff toilets and drying room, bin storage area, new staircase link, bicycle lift and service lift from podium (ground floor level) covering an additional area of c.913.2 sq.m within the existing basement; b) Ground Floor: Reconfiguration of the existing ground floor to include a new glazed screen enclosure to the existing atrium and introduce a new building entrance to the south elevation accessed from IFSC Plaza and close the existing entrance. Change of use of 103 sq.m of part of an existing retail bank area to office use. Change of use of c. 134.9 sq.m existing office space to a c. 152.1 sq.m food & beverage unit including an extended area of c. 17.2 sq.m to the east and access to an external terrace to the east. Change of use of c. 128.2 sq.m existing office space to a c. 164 sq.m bicycle café including an extended area of c. 35.8 sq.m to the south and east. Reconfiguration of the existing ground floor to the south/south- west to include a change of use from existing office area to create 2 no. food & beverage/retail units of c. 94.1 sq.m and c. 44 sq.m respectively; c) First Floor, Second Floor and Third Floor: Reconfiguration of the existing office floors to include refurbished and extended toilet accommodation; extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium; d) Fourth Floor: Reconfiguration of the existing office floors to include refurbished and extended toilet accommodation; extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium and enclosure of 2 no. external balcony areas to provide an additional c. 86.6 sq.m office space; e) Fifth Floor: New office floor accommodation to replace the existing plant areas and the enclosure of the existing external terrace to the north of the office floor (c. 1,226 sq.m) and to include the existing c. 565.1 sq.m of office accommodation to the north of the new extended floorplate, reconfiguration of existing plant areas to unisex toilets, lift lobby and circulation space within core area to the south; f) Addition of new floors: Addition of 4 no. office floors with the existing stair cores extended upwards and toilet accommodation replicated as the supplemented existing provision on the lower floors and the existing atrium extended through to roof level; the proposed sixth, seventh and eighth floor levels will consist of c. 1,791.1 sq.m office space each; the proposed ninth floor level will consist of c. 1,329.5 sq.m office space; setback of the external envelope and creation of a terrace area accessible for maintenance only at ninth floor level; new Part M compliant accommodation stairs within the atrium from ground floor to ninth floor; g) External works to include; A complete recladding with replacement curtain walling and an over-wrapping by a translucent perforated metal veil to the vertical external envelope of the existing building from ground floor level to fifth floor level and the extension and continuation of a new curtain wall and external perforated veil above to include the newly reconstructed fifth floor, and the new sixth, seventh. eighth and ninth floors; new plant and plant enclosure screen at roof level; additional plant on perforated metal platforms adjacent to the 3 no. existing cores from first to ninth floor; the provision of photovoltaic panels at roof level; new glazed atrium roof; provision of 4 no standard bicycle spaces and 9 no. cargo bicycle spaces at ground level; provision of a platform lift on the north-east corner of the site; new hard and soft landscaping adjacent to the building only; new lighting; and all associated site development works. The council granted permission on 30 Jun 2022. The five-week observation window closed on 25 Mar 2022. Appeal 314206 is before An Coimisiún Pleanála (lodged 27 Jul 2022). The site is zoned null under the Dublin City Council development plan. Within 500 m there are 145 other decided applications in the last five years and 25 appeals.
Proposal
We, La Touche S.a.r.l. c/o BCP Capital, 71 Upper Leeson Street, Dublin 4, intend to apply for planning permission for development at this c. 0.4417 ha site at La Touche House, Custom House Dock, International Financial Services Centre, Dublin 1. The proposed development will consist of; the refurbishment/reconfiguration, partial demolition, recladding and vertical extension of an existing (c. 13,275.9 sq.m GFA) 7-storey building to a 10-storey (c. 23,314.3 sq.m GFA) office building with an additional c. 8,068.4 sq.m commercial floorspace provided and a total height of c. 45.84 m from ground (50.85m ODM), including the following: 1) Partial demolition of the existing fifth floor and the existing sixth floor plant rooms and external plant areas to fifth floor slab level, comprising a combined area of c. 1528.5sq.m removed, the removal of an existing bridge link across the atrium, and maintaining the existing c. 565.1 sq.m of office space and the existing core areas to the east, west and south; 2) Refurbishment and reconfiguration of the existing office building as follows:- a) Basement level: Reduction in car parking provision from 143 no. to 99 no. retained spaces, reconfiguration of existing plant areas, increased bicycle parking to 184 no. spaces, provision of bicycle storage areas, locker room, changing rooms, staff toilets and drying room, bin storage area, new staircase link, bicycle lift and service lift from podium (ground floor level) covering an additional area of c.913.2 sq.m within the existing basement; b) Ground Floor: Reconfiguration of the existing ground floor to include a new glazed screen enclosure to the existing atrium and introduce a new building entrance to the south elevation accessed from IFSC Plaza and close the existing entrance. Change of use of 103 sq.m of part of an existing retail bank area to office use. Change of use of c. 134.9 sq.m existing office space to a c. 152.1 sq.m food & beverage unit including an extended area of c. 17.2 sq.m to the east and access to an external terrace to the east. Change of use of c. 128.2 sq.m existing office space to a c. 164 sq.m bicycle café including an extended area of c. 35.8 sq.m to the south and east. Reconfiguration of the existing ground floor to the south/south- west to include a change of use from existing office area to create 2 no. food & beverage/retail units of c. 94.1 sq.m and c. 44 sq.m respectively; c) First Floor, Second Floor and Third Floor: Reconfiguration of the existing office floors to include refurbished and extended toilet accommodation; extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium; d) Fourth Floor: Reconfiguration of the existing office floors to include refurbished and extended toilet accommodation; extension of the office accommodation to the edge of a new glazed screen enclosure to the existing atrium and enclosure of 2 no. external balcony areas to provide an additional c. 86.6 sq.m office space; e) Fifth Floor: New office floor accommodation to replace the existing plant areas and the enclosure of the existing external terrace to the north of the office floor (c. 1,226 sq.m) and to include the existing c. 565.1 sq.m of office accommodation to the north of the new extended floorplate, reconfiguration of existing plant areas to unisex toilets, lift lobby and circulation space within core area to the south; f) Addition of new floors: Addition of 4 no. office floors with the existing stair cores extended upwards and toilet accommodation replicated as the supplemented existing provision on the lower floors and the existing atrium extended through to roof level; the proposed sixth, seventh and eighth floor levels will consist of c. 1,791.1 sq.m office space each; the proposed ninth floor level will consist of c. 1,329.5 sq.m office space; setback of the external envelope and creation of a terrace area accessible for maintenance only at ninth floor level; new Part M compliant accommodation stairs within the atrium from ground floor to ninth floor; g) External works to include; A complete recladding with replacement curtain walling and an over-wrapping by a translucent perforated metal veil to the vertical external envelope of the existing building from ground floor level to fifth floor level and the extension and continuation of a new curtain wall and external perforated veil above to include the newly reconstructed fifth floor, and the new sixth, seventh. eighth and ninth floors; new plant and plant enclosure screen at roof level; additional plant on perforated metal platforms adjacent to the 3 no. existing cores from first to ninth floor; the provision of photovoltaic panels at roof level; new glazed atrium roof; provision of 4 no standard bicycle spaces and 9 no. cargo bicycle spaces at ground level; provision of a platform lift on the north-east corner of the site; new hard and soft landscaping adjacent to the building only; new lighting; and all associated site development works.
- Status
- Decision Notice Issued
- Decision
- Grant permission on 30 Jun 2022
- Final grant
- 12 Aug 2022
- Site (from polygon)
- 4,180 m²
- Location precision
- site (coords_polygon)
Timeline
- 18 Feb 2022New applicationObservation window closed 25 Mar 2022
- 14 Apr 2022Further information requested
- 3 Jun 2022Further information received
- 30 Jun 2022DecisionAppeal window closed 28 Jul 2022

Full planning report for 53.34955, -6.25024
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Commencement
No commencement notice matched to this reference.
Zoning at the site
Zone Z9 - DEV PLAN 2022-2028
Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.
Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
The main town centre — retail, offices, civic uses, apartments.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- NIAH-recorded building · 66
- Radon risk area · 1
- Recorded monument · 6
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 87469). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |