3455/22 is a planning application for permission at 62-66 Faussagh Avenue, Dublin 7, DO7 KH60, received by Dublin City Council on 7 Mar 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: Permission for development for a residential and retail development at ac. 0.16 ha site located at Nos. 62-66 Faussagh Avenue, Dublin 7, DO7 KH60, (formerly ‘The Cabra House’) and the adjoining unnamed laneway to the rear and to the west, extending to Faussagh Avenue. The development will principally consist of: the demolition of the part-one, part-two storey detached former licenced public house (950 sq m); the construction of a four storey building with roof access (total gross floor area of 2,421 sq m); (comprising a licensed supermarket of 535 sq m at ground floor; with 24 No. apartments (12 No. 1-bed units and 12 No. 2-bed units, with balconies or terraces on the north, south, east and west elevations and to the internal courtyard). The development will also consist of: communal open spaces at first floor level (87 sq m) and roof level of the southern block (155 sq m); circulation spaces; ESB substation and switch room; plant rooms; waste storage areas; bicycle, cargo bike and motorbike parking; 8 No. resident car parking spaces at the rear accessed via the laneway; PV panels at roof level, sustainable urban drainage systems (including green roof and attenuation tanks); associated hard and soft landscaping; all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments, including the provision of a replacement rear gate; and associated site servicing (foul and surface water drainage and water supply). The development will also consist of: alterations to the layout of the unnamed laneway to the rear and west including the removal of the existing gate at the entrance; revision to surface layout and road markings. Access to the scheme will be via Faussagh Avenue and the laneway to the rear. The council refused permission on 29 Apr 2022. The five-week observation window closed on 11 Apr 2022. An Coimisiún Pleanála decided appeal 313655 on 12 Oct 2023 (refuse). The site is zoned null under the Dublin City Council development plan. Within 500 m there are 85 other decided applications in the last five years and 10 appeals.
Proposal
Permission for development for a residential and retail development at ac. 0.16 ha site located at Nos. 62-66 Faussagh Avenue, Dublin 7, DO7 KH60, (formerly ‘The Cabra House’) and the adjoining unnamed laneway to the rear and to the west, extending to Faussagh Avenue. The development will principally consist of: the demolition of the part-one, part-two storey detached former licenced public house (950 sq m); the construction of a four storey building with roof access (total gross floor area of 2,421 sq m); (comprising a licensed supermarket of 535 sq m at ground floor; with 24 No. apartments (12 No. 1-bed units and 12 No. 2-bed units, with balconies or terraces on the north, south, east and west elevations and to the internal courtyard). The development will also consist of: communal open spaces at first floor level (87 sq m) and roof level of the southern block (155 sq m); circulation spaces; ESB substation and switch room; plant rooms; waste storage areas; bicycle, cargo bike and motorbike parking; 8 No. resident car parking spaces at the rear accessed via the laneway; PV panels at roof level, sustainable urban drainage systems (including green roof and attenuation tanks); associated hard and soft landscaping; all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments, including the provision of a replacement rear gate; and associated site servicing (foul and surface water drainage and water supply). The development will also consist of: alterations to the layout of the unnamed laneway to the rear and west including the removal of the existing gate at the entrance; revision to surface layout and road markings. Access to the scheme will be via Faussagh Avenue and the laneway to the rear.
- Status
- Appeal Decided
- Decision
- Refuse permission on 29 Apr 2022
- Site (from polygon)
- 1,636 m²
- Location precision
- site (coords_polygon)
Timeline
- 7 Mar 2022New applicationObservation window closed 11 Apr 2022
- 29 Apr 2022DecisionAppeal window closed 27 May 2022
- 27 May 2022Appeal lodged

Full planning report for 53.36761, -6.29878
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Commencement
No commencement notice matched to this reference.
Zoning at the site
Zone Z3 - DEV PLAN 2022-2028
Z3: Neighbourhood Centres: To provide for and improve neighbourhood facilities.
A local centre: shops, services and apartments over them, serving the surrounding housing.
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Designations within 250 m
No OPW flood extent nearby.
- NIAH-recorded building · 2
- Radon risk area · 1
- Recorded monument · 2
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88486). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |