Planning Register
Dublin City Council · 3624/20 · Permission

Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82)

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 23 Oct 2020We first saw it 11 Sept 2026, 18:51 (2150 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

3624/20 is a planning application for permission at Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82), received by Dublin City Council on 23 Oct 2020 and first seen by Planning Register on 11 Sept 2026. The application describes: The Electricity Supply Board (ESB) intends to apply for planning permission for development on a c. 5.6 ha site located within the existing Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82), which is licenced by the Environmental Protection Agency (EPA) under an Industrial Emissions (IE) Licence [Ref. P0577-03]. The development will consist of a 75 MWe (electrical output) aero derivative gas fired turbine for the generation of electricity and will include the following elements: (a) c. 240 sq.m. aero derivative gas fired turbine module up to c. 15.6 m high with a c. 30 m high stack; (b) ancillary buildings including: c. 128 sq.m., c. 6 m high gas compressor building; c. 18 sq.m., c. 5 m high liquid fuel forwarding pumps building; c. 80 sq. m., c. 5 m high fire fighting pumps building; c. 209 sq. m., c. 5.4 m high water treatment plant building; c. 48 sq. m., c. 6 m high gas reducing building; c. 12.6 sq. m., c. 2.7 m high continuous emissions monitoring (CEMS) hut; c. 90.1 sq. m., c. 4.7 m high electrical equipment module; c. 90.1 sq. m., c. 4.7 m high control & instrumentation (C&I) communications module; c. 90.1 sq. m., c. 4.7 m high plant control module (PCM); c. 90.1 sq. m., c. 4.7 m high welfare facilities building; c. 39.6 sq. m., c. 3 m high fire suppression and compressed air system building; (c) industrial/ electrical plant including: c. 22.2 sq.m., c. 2.6 m high emergency diesel generator; c. 28 sq.m., c. 4 m high gas compressor cooler; de-mineralised water tank (c. 12 m high, c. 1,540 cubic metre capacity); c. 36 sq.m., c. 2.6 m high spare parts storage container; bunded liquid fuel tank (c. 9 m high, c. 182 cubic metre capacity); raw / fire water tank (c. 14 m high, c. 2,044 cubic metre capacity); c. 11.1 sq. m., c. 2.2 m high fire suppression cabinet; c. 3 sq. m., c. 2.4 m high liquid fuel forwarding skid; c. 7.5 sq. m., c. 1.8 m high water wash cart; c. 3.8 sq. m., c. 3.3 m high lube oil skid; c. 1,309 sq. m., c. 6.5 m high fenced transformer compound; c. 21 sq. m., c. 6.6 m high generator circuit breaker; c. 97 sq. m., c. 5 m high fin fan coolers; c. 11 sq. m., c. 3.7 m high water injection skid; c. 10.9 sq. m., c. 2.5 m high bunded house transformer; (d) various boundary and internal fencing and gates with different treatments including securi-mesh (c. 2.4 m high), palisade (c. 2.6 m high), and chainlink (c. 2.7 m high); (e) ancillary site clearance and development works including provision of areas of hardstanding and car parking, internal access roads, pipe bridges, onsite drainage and attenuation, temporary construction laydown area; and connections to site services networks including: telecommunications, gas, liquid fuel, electrical, water supply, surface water drainage/ attenuation, and wastewater. The primary access will be via the existing Poolbeg Generating Station entrance at Pigeon House Road with a temporary construction access via the existing entrance off the road immediately south of the site. The proposed development is for the purposes of an activity requiring a licence from the Environmental Protection Agency under the Industrial Emissions Directive. An Environmental Impact Assessment Report (EIAR) which complies with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I. 296 of 2018) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, during office hours at the offices of the planning authority. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council during its public opening hours and a submission or observation in relation to the application may be made to the Authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application. The application may also be viewed or downloaded on the Department of Housing, Planning and Local Government's EIA Portal located at https://housinggovie.maps.arcgis.com/apps/webappviewer/index.html?id=d7d5a3d48f104ecbb206e7e5f84b71f1. The council granted permission on 7 May 2021. The five-week observation window closed on 27 Nov 2020. A commencement notice (CN0110062DC) was lodged on 22 Feb 2024, so works have started on site. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 8 other decided applications in the last five years and 1 appeal.

Appeal window closes 4 Jun 2021 closed 1926 days ago
4 weeks from the council's decision (7 May 2021) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

The Electricity Supply Board (ESB) intends to apply for planning permission for development on a c. 5.6 ha site located within the existing Poolbeg Generating Station, Pigeon House Road, Dublin 4 (Eircode D04 XD82), which is licenced by the Environmental Protection Agency (EPA) under an Industrial Emissions (IE) Licence [Ref. P0577-03]. The development will consist of a 75 MWe (electrical output) aero derivative gas fired turbine for the generation of electricity and will include the following elements: (a) c. 240 sq.m. aero derivative gas fired turbine module up to c. 15.6 m high with a c. 30 m high stack; (b) ancillary buildings including: c. 128 sq.m., c. 6 m high gas compressor building; c. 18 sq.m., c. 5 m high liquid fuel forwarding pumps building; c. 80 sq. m., c. 5 m high fire fighting pumps building; c. 209 sq. m., c. 5.4 m high water treatment plant building; c. 48 sq. m., c. 6 m high gas reducing building; c. 12.6 sq. m., c. 2.7 m high continuous emissions monitoring (CEMS) hut; c. 90.1 sq. m., c. 4.7 m high electrical equipment module; c. 90.1 sq. m., c. 4.7 m high control & instrumentation (C&I) communications module; c. 90.1 sq. m., c. 4.7 m high plant control module (PCM); c. 90.1 sq. m., c. 4.7 m high welfare facilities building; c. 39.6 sq. m., c. 3 m high fire suppression and compressed air system building; (c) industrial/ electrical plant including: c. 22.2 sq.m., c. 2.6 m high emergency diesel generator; c. 28 sq.m., c. 4 m high gas compressor cooler; de-mineralised water tank (c. 12 m high, c. 1,540 cubic metre capacity); c. 36 sq.m., c. 2.6 m high spare parts storage container; bunded liquid fuel tank (c. 9 m high, c. 182 cubic metre capacity); raw / fire water tank (c. 14 m high, c. 2,044 cubic metre capacity); c. 11.1 sq. m., c. 2.2 m high fire suppression cabinet; c. 3 sq. m., c. 2.4 m high liquid fuel forwarding skid; c. 7.5 sq. m., c. 1.8 m high water wash cart; c. 3.8 sq. m., c. 3.3 m high lube oil skid; c. 1,309 sq. m., c. 6.5 m high fenced transformer compound; c. 21 sq. m., c. 6.6 m high generator circuit breaker; c. 97 sq. m., c. 5 m high fin fan coolers; c. 11 sq. m., c. 3.7 m high water injection skid; c. 10.9 sq. m., c. 2.5 m high bunded house transformer; (d) various boundary and internal fencing and gates with different treatments including securi-mesh (c. 2.4 m high), palisade (c. 2.6 m high), and chainlink (c. 2.7 m high); (e) ancillary site clearance and development works including provision of areas of hardstanding and car parking, internal access roads, pipe bridges, onsite drainage and attenuation, temporary construction laydown area; and connections to site services networks including: telecommunications, gas, liquid fuel, electrical, water supply, surface water drainage/ attenuation, and wastewater. The primary access will be via the existing Poolbeg Generating Station entrance at Pigeon House Road with a temporary construction access via the existing entrance off the road immediately south of the site. The proposed development is for the purposes of an activity requiring a licence from the Environmental Protection Agency under the Industrial Emissions Directive. An Environmental Impact Assessment Report (EIAR) which complies with the European Union (Planning and Development) (Environmental Impact Assessment) Regulations 2018 (S.I. 296 of 2018) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy, during office hours at the offices of the planning authority. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council during its public opening hours and a submission or observation in relation to the application may be made to the Authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application. The application may also be viewed or downloaded on the Department of Housing, Planning and Local Government's EIA Portal located at https://housinggovie.maps.arcgis.com/apps/webappviewer/index.html?id=d7d5a3d48f104ecbb206e7e5f84b71f1.

Status
Decision Notice Issued
Decision
Grant permission on 7 May 2021
Final grant
22 Jun 2021
Site (from polygon)
5.51 ha
Location precision
site (coords_polygon)

Timeline

  • 23 Oct 2020
    New application
    Observation window closed 27 Nov 2020
  • 17 Dec 2020
    Further information requested
  • 15 Mar 2021
    Further information received
  • 7 May 2021
    Decision
    Appeal window closed 4 Jun 2021

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.33868, -6.18714

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

  • Commencement notice CN0110062DC
    22 Feb 2024Pigeon House Road, Dublin, D04 XD82, Dublin 4matched by ref_exact
  • Seven day notice SN0009230DC
    9 Oct 2023Pigeon House Road, Dublin, Dublin 4matched by ref_exact

Zoning at the site

Zone Z9 - DEV PLAN 2022-2028

C2.2 — Economic development and employment

Z7: Employment (Heavy): To provide for the protection and creation of industrial uses, and facilitate opportunities for employment creation including Port Related Activities.

Zoned for employment uses. Housing is not the intended use here.

G5 — Open space and amenity

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R3 — Rural cluster

Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

A small rural settlement where only modest infill serving local need is envisaged.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • EPA-licensed facility · 3
    Electricity Supply Board; Electricity Supply Board; P0577
  • Natural Heritage Area (incl. proposed) · 1
    South Dublin Bay
  • Special Area of Conservation · 1
    South Dublin Bay SAC
  • Recorded monument · 6
    Battery; Sea wall; Signal tower
  • Special Protection Area · 1
    South Dublin Bay and River Tolka Estuary SPA

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88574). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open