PlanningRegister.ie
Dublin City Council · 3878/24

site at junction of Gardiner Street Upper and Sherrard Street Upper , Mountjoy, Dublin 1

  1. 19 Jun 2024Received
  2. 12 Aug 2024Grant permission
  3. 24 Sept 2024Final grant
  4. 12 May 2025Commenced
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
Status
Commenced
Decision
Grant permission · 12 Aug 2024
Council
Dublin City Council
Type
Permission
Site
642 m²

What’s proposed

Permission for development at the site at the junction of Gardiner Street Upper and Sherrard Street Upper, Mountjoy, Dublin 1, within part of the garden bounded by a limestone wall, adjacent to St Francis Xavier Church and Presbytery (54-74 Gardiner Street Upper, Dublin 1). and within its curtilage, all Protected Structures (RPS No 3138) The proposed development will consist of the demolition of 2 no. single storey maintenance sheds (combined area 62sq.m.) to facilitate the construction of a two-storey archive storage building at the corner of the walled garden at the junction of Gardiner Street Upper and Sherrard Street Upper, with a new entrance through the existing boundary wall on Gardiner Street Upper. The proposed development, area c. 358 sq.m, will consist of a new entrance gate with associated signage, an open air entrance area with bicycle storage and access to the building; the building itself consists of a reception area, with split level access to the archive storage room, research reading room , ancillary offices, staff facilities, accessible sanitary facilities, platform lift, and plant room and ancillary spaces including a heat pump located in the existing adjoining service yard. Some alteration works are proposed to the limestone boundary wall on Gardiner Street Upper to accommodate an entrance into the building, including the formation of an opening. The development includes the provision of photovoltaic panels at roof level; 3 no. cycle parking spaces; and all associated site development works

3878/24 is a planning application to Dublin City Council for permission for development at the site at the junction of Gardiner Street Upper and, received on 19 Jun 2024; permission was granted on 12 Aug 2024.

Planning details

Reference
3878/24
Local authority
Dublin City Council
Status
Commenced · register status “Decision Notice Issued
Received
19 Jun 2024
Observations close
24 Jul 2024 (closed 783 days ago)
Decision due
13 Aug 2024 · decided 12 Aug 2024
Decision
Grant permission on 12 Aug 2024
Proposed development
Permission for development at the site at the junction of Gardiner Street Upper and Sherrard Street Upper, Mountjoy, Dublin 1, within part of the garden bounded by a limestone wall, adjacent to St Francis Xavier Church and Presbytery (54-74 Gardiner Street Upper, Dublin 1). and within its curtilage, all Protected Structures (RPS No 3138) The proposed development will consist of the demolition of 2 no. single storey maintenance sheds (combined area 62sq.m.) to facilitate the construction of a two-storey archive storage building at the corner of the walled garden at the junction of Gardiner Street Upper and Sherrard Street Upper, with a new entrance through the existing boundary wall on Gardiner Street Upper. The proposed development, area c. 358 sq.m, will consist of a new entrance gate with associated signage, an open air entrance area with bicycle storage and access to the building; the building itself consists of a reception area, with split level access to the archive storage room, research reading room , ancillary offices, staff facilities, accessible sanitary facilities, platform lift, and plant room and ancillary spaces including a heat pump located in the existing adjoining service yard. Some alteration works are proposed to the limestone boundary wall on Gardiner Street Upper to accommodate an entrance into the building, including the formation of an opening. The development includes the provision of photovoltaic panels at roof level; 3 no. cycle parking spaces; and all associated site development works
As published by the register.
Site area
642 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Around this site this application first, then everything within 500 m

Explore from hereFree report
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.35839, -6.26028

Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

  • Commencement notice CN0128401DC
    12 May 202554-72 Gardiner Street Upper, Dublin 1matched by ref_exact

Zoning at the site

Zone Z9 - DEV PLAN 2022-2028

G5 — Open space and amenity

Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

O2 — Green belt

Z8: Georgian Conservation Areas: To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

Zoned to protect the open land between urban areas. Development is strongly resisted.

Designations within 250 m

No OPW flood extent nearby.

  • NIAH-recorded building · 212
    The Temple/Kavanaghs; house; house
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument · 2
    House - indeterminate date; R178403

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 83231). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open