4029/24 is a planning application for permission at Site at Thomas Street, including No. 144 Thomas Street (the site is bounded by No. 143 Thomas Street, and Marshalsea Lane to the east and No's 151-156 Thomas Street to the west), Dublin 8, received by Dublin City Council on 17 Jul 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: The proposed development comprises site clearance works, including the demolition of all existing buildings /structures on site, including the existing boundary wall and gates along the Thomas Street frontage, and the construction of a new Part 3-; Part 4-; Part 6- and Part 7- storey Aparthotel building over basement level with a total Gross Floor Area (GIA) of 6,790 sq.m together with the formation of a new vehicular access ramp (with integrated bicycle lane) off Thomas Street leading to basement level. The basement level will accommodate 16 no. cycle parking spaces; staff changing-rooms/showers; a service yard and ancillary plant and storage rooms; waste/refuse storage; ancillary gym for hotel guests and ancillary kitchen. Ground floor level will accommodate a reception area (222.9 sq.m) and café (156.6 sq.m) accessed off Thomas Street, and an ESB sub-station and switchroom. Aparthotel rooms / suites are provided at first to fifth floor level (93 no. self-contained/self-catering units). At sixth floor level, a public bar / event space (257.5 sq.m) with south facing roof terrace is provided. Other site works include the provision of hard and soft landscaping measures to ancillary amenity spaces. The proposed building incorporates sustainable drainage measures that includes green roofs and underground attenuation tank. Screened plant is provided at rooftop level. The council refused permission on 10 Sept 2024. The five-week observation window closed on 21 Aug 2024. An Coimisiún Pleanála decided appeal 321007 on 21 Aug 2025 (refuse). The site is zoned null under the Dublin City Council development plan. Within 500 m there are 148 other decided applications in the last five years and 20 appeals.
Proposal
The proposed development comprises site clearance works, including the demolition of all existing buildings /structures on site, including the existing boundary wall and gates along the Thomas Street frontage, and the construction of a new Part 3-; Part 4-; Part 6- and Part 7- storey Aparthotel building over basement level with a total Gross Floor Area (GIA) of 6,790 sq.m together with the formation of a new vehicular access ramp (with integrated bicycle lane) off Thomas Street leading to basement level. The basement level will accommodate 16 no. cycle parking spaces; staff changing-rooms/showers; a service yard and ancillary plant and storage rooms; waste/refuse storage; ancillary gym for hotel guests and ancillary kitchen. Ground floor level will accommodate a reception area (222.9 sq.m) and café (156.6 sq.m) accessed off Thomas Street, and an ESB sub-station and switchroom. Aparthotel rooms / suites are provided at first to fifth floor level (93 no. self-contained/self-catering units). At sixth floor level, a public bar / event space (257.5 sq.m) with south facing roof terrace is provided. Other site works include the provision of hard and soft landscaping measures to ancillary amenity spaces. The proposed building incorporates sustainable drainage measures that includes green roofs and underground attenuation tank. Screened plant is provided at rooftop level.
- Status
- Appeal Decided
- Decision
- Refuse permission on 10 Sept 2024
- Site (from polygon)
- 1,875 m²
- Location precision
- site (coords_polygon)
Timeline
- 17 Jul 2024New applicationObservation window closed 21 Aug 2024
- 10 Sept 2024DecisionAppeal window closed 8 Oct 2024
- 9 Oct 2024Appeal lodged

Full planning report for 53.34368, -6.28276
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Commencement
No commencement notice matched to this reference.
Zoning at the site
Zone Z5 - DEV PLAN 2022-2028
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
The main town centre — retail, offices, civic uses, apartments.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- EPA-licensed facility · 4
- NIAH-recorded building · 81
- Radon risk area · 1
- Recorded monument · 46
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 86538). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |