Dublin City Council · 4040/20 · Permission

Saint Patrick's Tower, The Digital Hub, Thomas Street, Dublin 8

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 23 Dec 2020We first saw it 11 Sept 2026, 18:51 (2089 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

4040/20 is a planning application for permission at Saint Patrick's Tower, The Digital Hub, Thomas Street, Dublin 8, received by Dublin City Council on 23 Dec 2020 and first seen by Planning Register on 11 Sept 2026. The application describes: PROTECTED STRUCTURE: Change of use of St. Patrick's Tower from a vacant building to exhibition space and associated works. St. Patrick's Tower is located at the Digital Hub, Thomas Street, Dublin 8. Proposed works include necessary repairs and adaptation of the tower for public use including: 1. Proposed external works: gently sloping access ramps, pedestrian crossings, cobblestone area with benches to the front entrance area, removal of bars from existing ground floor window, replacement of damaged rear window with new louvred vent, new entrance doors, new illuminated signage. 2. Proposed internal works to ground and first floor only, necessary minor repairs to brickwork and repairs to internal roof of entrance lobby area, new floor finish throughout ground floor, new lightweight ceiling finish mounted to underside of existing concrete slab, surface mounted lighting and wiring, mechanical ventilation system with 4 new opes to concrete slab and localized plant on first floor slab, removal of non-historic existing timber stairs, with new fold-down access stairs provided in its place. New firestopping provided to inner side of historic brick partition wall. The council granted permission on 25 Feb 2021. The five-week observation window closed on 5 Feb 2021. A commencement notice (SN0013527DC) was lodged on 23 Dec 2025, so works have started on site. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 145 other decided applications in the last five years and 15 appeals.

Appeal window closes 25 Mar 2021 closed 1997 days ago
4 weeks from the council's decision (25 Feb 2021) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

PROTECTED STRUCTURE: Change of use of St. Patrick's Tower from a vacant building to exhibition space and associated works. St. Patrick's Tower is located at the Digital Hub, Thomas Street, Dublin 8. Proposed works include necessary repairs and adaptation of the tower for public use including: 1. Proposed external works: gently sloping access ramps, pedestrian crossings, cobblestone area with benches to the front entrance area, removal of bars from existing ground floor window, replacement of damaged rear window with new louvred vent, new entrance doors, new illuminated signage. 2. Proposed internal works to ground and first floor only, necessary minor repairs to brickwork and repairs to internal roof of entrance lobby area, new floor finish throughout ground floor, new lightweight ceiling finish mounted to underside of existing concrete slab, surface mounted lighting and wiring, mechanical ventilation system with 4 new opes to concrete slab and localized plant on first floor slab, removal of non-historic existing timber stairs, with new fold-down access stairs provided in its place. New firestopping provided to inner side of historic brick partition wall.

Status
Decision Notice Issued
Decision
Grant permission on 25 Feb 2021
Final grant
8 Apr 2021
Site (from polygon)
279 m²
Location precision
site (coords_polygon)

Timeline

  • 23 Dec 2020
    New application
    Observation window closed 5 Feb 2021
  • 25 Feb 2021
    Decision
    Appeal window closed 25 Mar 2021

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.34399, -6.28405

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

  • Seven day notice SN0013527DC
    23 Dec 202585 James's Street, Dublin, Dublin 8, D08 C2PRmatched by ref_exact

Zoning at the site

Zone Z5 - DEV PLAN 2022-2028

M2 — Major town centre

Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

The main town centre — retail, offices, civic uses, apartments.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • EPA-licensed facility · 4
    Diageo Ireland; Diageo Ireland; Diageo Ireland
  • NIAH-recorded building · 71
    Rupert Guinness Theatre Guinness Brewery; Guinness Brewery; Guinness Brewery
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument · 36
    Gateway; Gateway; Ritual site - holy well

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 79573). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open