Approved in 2023. Building started in 2024.

  1. 4 Jul 2023Received
  2. 28 Aug 2023Approved
  3. 9 Oct 2023Final approval
  4. 24 Sept 2024Building started
Status
Building startedi
Decision
Approved · 28 Aug 2023
Council
Dublin City Council
Type
Permission
Site
384 m²

Live near 87 Willow Park Avenue?

Everything else planned on your street, in one report.

Check my street

What’s proposed

The development will consist of (a) - Demolition and safe removal of existing chimney stack and roof hip structure at roof level to side (West Elevation). (b) - The raising of existing gable wall and 1no. window with obscure glass at side (West Elevation) with modification / extension of existing roof structure. (c) - Construction of 1no. dormer at rear, including the conversion of existing attic space for domestic storage / ancillary accommodation, incorporating new access stairs and shower room, with 3no. windows and 1no. velux roof-light at rear (North Elevation) and 2no. velux roof-lights at front (South Elevation). (d) - The widening of existing vehicular entrance from 2.5 meters to 4.2 meters with a new permeable finish to front driveway, including all necessary site works to facilitate the development

Planning details

Reference
4074/23
Local authority
Dublin City Council
Status
Commenced · register status “Decision Notice Issued”
Received
4 Jul 2023
Observations close
8 Aug 2023 (closed 1153 days ago)
Decision due
28 Aug 2023 · decided 28 Aug 2023
Decision
Grant permission on 28 Aug 2023
Proposed development
The development will consist of (a) - Demolition and safe removal of existing chimney stack and roof hip structure at roof level to side (West Elevation). (b) - The raising of existing gable wall and 1no. window with obscure glass at side (West Elevation) with modification / extension of existing roof structure. (c) - Construction of 1no. dormer at rear, including the conversion of existing attic space for domestic storage / ancillary accommodation, incorporating new access stairs and shower room, with 3no. windows and 1no. velux roof-light at rear (North Elevation) and 2no. velux roof-lights at front (South Elevation). (d) - The widening of existing vehicular entrance from 2.5 meters to 4.2 meters with a new permeable finish to front driveway, including all necessary site works to facilitate the development
As published by the register.
Site area
384 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 110 · 500 m · 5 years

Show all 110

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Building started

  • 24 Sept 2024 · Builder told the council small works were starting CN0119929DC

Zoning

Zone Z1 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

No mapped flood area nearby.

  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

4074/23 is a planning application to Dublin City Council for the development will consist of (a) - Demolition and safe removal of existing chimney, received on 4 Jul 2023; permission was granted on 28 Aug 2023.