The site of c. 0.94 ha at lands South of Belcamp 220 kV Substation, Belcamp, Dublin 17

  1. 15 Dec 2021Received
  2. 4 Jan 2022Application declared inva
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
Status
Withdrawn or invalid
Decision
Application declared inva · 4 Jan 2022
Council
Dublin City Council
Type
Permission
Site
1.20 ha

What’s proposed

Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation , Belcamp Dublin 17 . The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours

4091/21 is a planning application to Dublin City Council for mayne Stability Limited intends to apply for permission for a period of 10 years for the, received on 15 Dec 2021; it was withdrawn on 4 Jan 2022.

Planning details

Reference
4091/21
Local authority
Dublin City Council
Status
Withdrawn or invalid · register status “Decision Notice Issued
Received
15 Dec 2021
Observations close
28 Jan 2022 (closed 1691 days ago)
Decision due
17 Feb 2022 · decided 4 Jan 2022
Decision
Application declared inva on 4 Jan 2022
Proposed development
Mayne Stability Limited intends to apply for permission for a period of 10 years for the development of access to the Synchronous Compensator Development (Grid Stabililisation Facility) on the site of a c 0.94 ha. at lands south of Belcamp 220KV substation , Belcamp Dublin 17 . The proposed development will consist of the following elements within the administrative boundary of Dublin City Council: a) New access entrance from the R139 and a clear span bridge crossing over River Mayne. b) Internal access tracks, security fencing, temporary construction compound, landscaping, and drainage. A concurrent planning application is being made to Fingal County Council which relates to the lands directly to the north of the site of c.1.65 ha for the construction of A Grid Stabilisation Facility containing 1 No. High Inertia Synchronous Compensator (HISC) unit enclosed within a steel clad framed style structure (12.1m max height) and supported by 8 No. electrical equipment containers (containing ancillary power supply products including a static frequency converts, MV switchgear, exciters, LV distribution, control room, welfare and office), main, auxiliary & start-up electrical transformers, generator circuit breaker, switchgear equipment, External cooler units and 1 No. back up diesel generator and associated diesel storage tank; A 220kV High Voltage Gas Insulated Switchgear (GIS) compound containing a GIS building with all control & HV equipment within a single storey building (13.2m max height). The building will be surrounded by a compound road and contained within a 2.6m high galvanised steel palisade fence; A 220kV underground cable to the existing adjoining Eirgrid substation boundary; Associated elements comprising a clear span bridge over the River Mayne, various underground cables and ducts, equipment plinths, boundary security fence, compound lighting and palisade gates and fencing, security lighting, CCTV, internal access roads, hardstanding areas and all necessary foundations works for the above compounds. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. The NIS may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours
As published by the register.
Site area
1.20 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Around this site this application first, then everything within 500 m

Explore from hereFree report
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.40787, -6.20274

Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z14 - DEV PLAN 2022-2028

    R3 — Rural cluster

    Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.

    A small rural settlement where only modest infill serving local need is envisaged.

    HT - High Technology: Facilitate opportunities for high technology, high technology and advanced manufacturing, major office and research and development based employment within high quality, highly accessible, campus style settings. The HT zoning is aimed at providing a location for high end, high quality, value added businesses and corporate headquarters. An emphasis on exemplar sustainable design and aesthetic quality will be promoted to enhance corporate image and identity.

    C3 — High technology

    HT - High Technology: Provide for office, research and development and high technology/high technology manufacturing type employment in a high quality built and landscaped environment

    Zoned for office, research and development and high-technology manufacturing.

    G4 — Open space

    OS - Open Space: Preserve and provide for open space and recreational amenities

    Open space and recreational amenity, to be preserved as such.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • NIAH-recorded building · 2
      Belcamp House; icehouse
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 2
      House - 16th/17th century; R149742

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 86858). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open