Lauriston, 19 Park Drive, Ranelagh, Dublin 6, D06 H6C7
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
4122/23 is a planning application for permission at Lauriston, 19 Park Drive, Ranelagh, Dublin 6, D06 H6C7, received by Dublin City Council on 11 Jul 2023 and first seen by Planning Register on 11 Sept 2026. The application describes: PROTECTED STRUCTURE: the development will consist of renovation, alteration, conservation and extension works to existing three storey semi-detached period property, to include: (1) demolition of existing non-original single storey extension (50m2) to side, and construction of a new replacement single storey extension (58m2) to the side with roof lights / roof-glazing, (2) alterations to existing external walls and door/window opes of ground floor rear return and installation of new glazed patio doors to east elevation and new projecting timber bay window to south elevation, (3) alterations / reconfiguration of existing layout and internal partitions to ground & 1st floor return rooms, (4) formation of new door openings in existing internal walls at ground, first & second floor, (5) internal insulation/ thermal upgrade works to selected existing external walls and existing suspended timber floor, (6) replacement of existing defective roof finishes to domed roof turret, (7) re-slating of pitched roof and general repairs and conservation works to roof, chimneys, fascia's & rainwater goods; (8) installation of photovoltaic (PV) solar panels to southern roof facade at rear, (9) facade conservation works including lime repointing and brickwork repairs, repair/replacement of existing external dash-render finishes and cleaning / conservation works to stonework, (10) upgrading and refurbishment works to existing timber casement windows, doors and external timberwork, (11) general refurbishment and conservation works to interior & exterior of existing period structure, (12) associated site works. The council granted permission on 4 Sept 2023. The five-week observation window closed on 15 Aug 2023. A commencement notice (CN0133945DC) was lodged on 30 Sept 2025, so works have started on site. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 125 other decided applications in the last five years and 20 appeals.
Proposal
PROTECTED STRUCTURE: the development will consist of renovation, alteration, conservation and extension works to existing three storey semi-detached period property, to include: (1) demolition of existing non-original single storey extension (50m2) to side, and construction of a new replacement single storey extension (58m2) to the side with roof lights / roof-glazing, (2) alterations to existing external walls and door/window opes of ground floor rear return and installation of new glazed patio doors to east elevation and new projecting timber bay window to south elevation, (3) alterations / reconfiguration of existing layout and internal partitions to ground & 1st floor return rooms, (4) formation of new door openings in existing internal walls at ground, first & second floor, (5) internal insulation/ thermal upgrade works to selected existing external walls and existing suspended timber floor, (6) replacement of existing defective roof finishes to domed roof turret, (7) re-slating of pitched roof and general repairs and conservation works to roof, chimneys, fascia's & rainwater goods; (8) installation of photovoltaic (PV) solar panels to southern roof facade at rear, (9) facade conservation works including lime repointing and brickwork repairs, repair/replacement of existing external dash-render finishes and cleaning / conservation works to stonework, (10) upgrading and refurbishment works to existing timber casement windows, doors and external timberwork, (11) general refurbishment and conservation works to interior & exterior of existing period structure, (12) associated site works.
- Status
- Decision Notice Issued
- Decision
- Grant permission on 4 Sept 2023
- Final grant
- 11 Oct 2023
- Site (from polygon)
- 644 m²
- Location precision
- site (coords_polygon)
Timeline
- 11 Jul 2023New applicationObservation window closed 15 Aug 2023
- 4 Sept 2023DecisionAppeal window closed 2 Oct 2023

Full planning report for 53.31615, -6.25096
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
- Short commencement notice CN0133945DC
Zoning at the site
Zone Z2 - DEV PLAN 2022-2028
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.
Reserved for the schools, creches, community and health facilities a neighbourhood needs.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 83089). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |