Unit 9, Sancton Wood Building, Heuston South Quarter, Military Road, Kilmainham, Dublin 8, D08 TK88
- 8 Aug 2024Received
- 30 Sept 2024Grant permission
- 20 Nov 2024Final grant
- 2 Dec 2024Commenced
- Status
- Commenced
- Decision
- Grant permission · 30 Sept 2024
- Council
- Dublin City Council
- Type
- Permission
- Site
- 535 m²
What’s proposed
The proposed development comprises the construction of a new extended mezzanine level (at ground level) to provide additional floor space (extended by approximately 161.4 sq.m) in connection with the existing gymnasium use permitted under DCC Planning Ref. 2551/15. The layout of the proposed mezzanine floor space will integrate with the existing office floor space permitted under DCC Planning Ref. 2366/18 but in a reconfigured manner to include a change of use of permitted office space to an ancillary canteen in connection with the gymnasium. The proposed development includes all associated/ancillary works and connection to services
4128/24 is a planning application to Dublin City Council for the proposed development comprises the construction of a new extended mezzanine level, received on 8 Aug 2024; permission was granted on 30 Sept 2024.
Planning details
- Reference
- 4128/24
- Local authority
- Dublin City Council
- Status
- Commenced · register status “Decision Notice Issued”
- Received
- 8 Aug 2024
- Observations close
- 12 Sept 2024 (closed 732 days ago)
- Decision due
- 2 Oct 2024 · decided 30 Sept 2024
- Decision
- Grant permission on 30 Sept 2024
- Proposed development
- The proposed development comprises the construction of a new extended mezzanine level (at ground level) to provide additional floor space (extended by approximately 161.4 sq.m) in connection with the existing gymnasium use permitted under DCC Planning Ref. 2551/15. The layout of the proposed mezzanine floor space will integrate with the existing office floor space permitted under DCC Planning Ref. 2366/18 but in a reconfigured manner to include a change of use of permitted office space to an ancillary canteen in connection with the gymnasium. The proposed development includes all associated/ancillary works and connection to servicesAs published by the register.
- Site area
- 535 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name
Full planning report for 53.34398, -6.29715
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
- Seven day notice SN0011590DC
Zoning at the site
Zone Z5 - DEV PLAN 2022-2028
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
The main town centre — retail, offices, civic uses, apartments.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- NIAH-recorded building · 14
- Radon risk area · 1
- Recorded monument · 14
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 82746). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |