PlanningRegister.ie
Dublin City Council · 4193/24

Ashmere, 77 Marlborough Road, Donnybrook Dublin 4, D04RH21

Approved in 2024. Building started in 2025.

  1. 23 Aug 2024Received
  2. 17 Oct 2024Approved
  3. 10 Dec 2024Final approval
  4. 26 Mar 2025Building started
Status
Building startedi
Decision
Approved · 17 Oct 2024
Council
Dublin City Council
Type
Permission
Units
1
Site
352 m²

Live near Ashmere?

Everything else planned on your street, in one report.

Check my street

What’s proposed

The development will consist of: 1. The return of the existing house to a single-family dwelling from three apartment units 2. The removal of the existing modern extension to the rear of the existing house and the removal of modern internal interventions throughout. 3. The construction of a single-storey double-height extension to the rear of the existing house together with associated roof lights. 4. Internal reconfiguration, refurbishment and associated restoration works throughout the house. 5. The re-pointing of the existing brickwork with lime mortar to the front elevation. 6. The refurbishment of the existing historic timber sash windows throughout and, the replacement of the existing modern lower ground floor front pvc window with a conservation grade timber window. 7. The replacement of the existing north-west facing inner roof valley roof-light with a new conservation grade roof-light together with a new additional inner roof valley roof-light and, pv panels to the same inner roof valley. 8. All ancillary site, boundary and landscaping works

Planning details

Reference
4193/24
Local authority
Dublin City Council
Status
Commenced · register status “Decision Notice Issued”
Received
23 Aug 2024
Observations close
27 Sept 2024 (closed 741 days ago)
Decision due
17 Oct 2024 · decided 17 Oct 2024
Decision
Grant permission on 17 Oct 2024
Proposed development
The development will consist of: 1. The return of the existing house to a single-family dwelling from three apartment units 2. The removal of the existing modern extension to the rear of the existing house and the removal of modern internal interventions throughout. 3. The construction of a single-storey double-height extension to the rear of the existing house together with associated roof lights. 4. Internal reconfiguration, refurbishment and associated restoration works throughout the house. 5. The re-pointing of the existing brickwork with lime mortar to the front elevation. 6. The refurbishment of the existing historic timber sash windows throughout and, the replacement of the existing modern lower ground floor front pvc window with a conservation grade timber window. 7. The replacement of the existing north-west facing inner roof valley roof-light with a new conservation grade roof-light together with a new additional inner roof valley roof-light and, pv panels to the same inner roof valley. 8. All ancillary site, boundary and landscaping works
As published by the register.
Site area
352 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 225 · 500 m · 5 years

Show all 225

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Building started

  • 26 Mar 2025 · Builder told the council small works were starting CN0126784DC

Zoning

Zone Z2 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

No mapped flood area nearby.

  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

4193/24 is a planning application to Dublin City Council for the development will consist of: 1. The return of the existing house to a single-family, received on 23 Aug 2024; permission was granted on 17 Oct 2024.