Clancy Quay (the former Clancy Barracks), South Circular Road, Islandbridge, Dublin 8
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
4361/19 is a planning application for permission at Clancy Quay (the former Clancy Barracks), South Circular Road, Islandbridge, Dublin 8, received by Dublin City Council on 5 Nov 2019 and first seen by Planning Register on 11 Sept 2026. The application describes: RETENTION: PROTECTED STRUCTURE: The site is generally bounded by the Clancy Quay development scheme to the north and east, South Circular Road to the west, and CIE lands and St. John's Road West to the south. ''Clancy Barracks: 19th Century Buildings'' are listed in the record of protected structures. The development consists of minor amendments to the development permitted under DDC Reg. Ref. 2850/17 (Clancy Quay Phase 3 'parent permission') as follows: Permission for signage to the south of the vehicular site entrance, affixed to the permitted curved wall. Permission for design amendments to the permitted boundary treatment, adjacent to the retail unit in Block 1 on South Circular Road, including: the removal of a section of the Dublin City Council owned wall on the perimeter of the site, keeping a greater proportion of the former Barrack Boundary Wall (protected structure), removal of a length of railing from the original boundary wall and replacement with new balustrade and handrail extending to the top of existing ramp, and reuse of original railing at the Clancy Quay Phase 3 site entrance. Permission for the removal of 18no. surface car parking spaces and replacement with public amenity open space. Retention Permission for the completion of the conversion of permitted roof areas to roof terraces at permitted Block 1 (level 9), Block 3 (level 8) and Blocks 3 & 4 (level 7), with associated works including erection of safety railings, pergolas, trellis screening, planter boxes and minor extension of corridors onto roof terraces to accommodate part M compliant ramps for access. Retention Permission for reuse of stone material from the former Barrack Boundary Wall (protected structure) to the wall flanking the entrance to the retail unit on South Circular Road. The council granted permission on 2 Jan 2020. The five-week observation window closed on 10 Dec 2019. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 44 other decided applications in the last five years and 9 appeals.
Proposal
RETENTION: PROTECTED STRUCTURE: The site is generally bounded by the Clancy Quay development scheme to the north and east, South Circular Road to the west, and CIE lands and St. John's Road West to the south. ''Clancy Barracks: 19th Century Buildings'' are listed in the record of protected structures. The development consists of minor amendments to the development permitted under DDC Reg. Ref. 2850/17 (Clancy Quay Phase 3 'parent permission') as follows: Permission for signage to the south of the vehicular site entrance, affixed to the permitted curved wall. Permission for design amendments to the permitted boundary treatment, adjacent to the retail unit in Block 1 on South Circular Road, including: the removal of a section of the Dublin City Council owned wall on the perimeter of the site, keeping a greater proportion of the former Barrack Boundary Wall (protected structure), removal of a length of railing from the original boundary wall and replacement with new balustrade and handrail extending to the top of existing ramp, and reuse of original railing at the Clancy Quay Phase 3 site entrance. Permission for the removal of 18no. surface car parking spaces and replacement with public amenity open space. Retention Permission for the completion of the conversion of permitted roof areas to roof terraces at permitted Block 1 (level 9), Block 3 (level 8) and Blocks 3 & 4 (level 7), with associated works including erection of safety railings, pergolas, trellis screening, planter boxes and minor extension of corridors onto roof terraces to accommodate part M compliant ramps for access. Retention Permission for reuse of stone material from the former Barrack Boundary Wall (protected structure) to the wall flanking the entrance to the retail unit on South Circular Road.
- Status
- Decision Notice Issued
- Decision
- Grant permission and rete on 2 Jan 2020
- Final grant
- 11 Feb 2020
- Site (from polygon)
- 1.47 ha
- Location precision
- site (coords_polygon)
Timeline
- 5 Nov 2019New applicationObservation window closed 10 Dec 2019
- 2 Jan 2020DecisionAppeal window closed 30 Jan 2020

Full planning report for 53.34479, -6.30687
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
Zone Z10 - DEV PLAN 2022-2028
Z10: Inner Suburban and inner City Sustainable Mixed-Uses: To consolidate and facilitate the development of inner city and inner suburban sites for mixed-uses.
A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- NIAH-recorded building · 25
- Radon risk area · 2
- Recorded monument · 13
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88809). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |