PlanningRegister.ie
Dublin City Council · 4574/19

Calor, Tolka Quay Road, Dublin 1

Approved in 2020. Approval ran out in 2025.

  1. 28 Nov 2019Received
  2. 30 Jan 2020Approved
  3. 20 Mar 2020Final approval
  4. 20 Mar 2025Approval ran out
Status
Approved
Decision
Approved · 30 Jan 2020
Council
Dublin City Council
Type
Permission
Site
1,997 m²

Live near Calor?

Everything else planned on your street, in one report.

Check my street

What’s proposed

The development will consist of: The construction of a 3 bay maintenance facility comprising of 2 no. single storey drive-in garages with pitched roofs and 1 no. single storey canteen / toilet / stores / workshop area with mono pitch roof (approx.. 436m2/6.8m high), building signage, associated site works, 9 no. lighting columns (approx.. 6m); removal of existing fencing and replacement with a 2m high boundary fence along the west, north and east boundaries; modifications to the existing boundary wall/fence along Tolka Quay Road to close one access and add one pedestrian gate and; car parking for 36 cars. The development also includes reconfiguration and widening of existing entrances / exits and connection to existing services on Tolka Quay Road, Dublin Port, Dublin 1. All development to take place on a site of aprrox. 0.2 hectares. The proposed development replaces the permission previously granted to Dublin Port Company for the construction of replacement offices and maintenance shed (Reg. Ref: 3143/18) on the same site. The site of the proposed development is a SEVESO site

Planning details

Reference
4574/19
Local authority
Dublin City Council
Status
Granted · register status “Decision Notice Issued”
Received
28 Nov 2019
Observations close
13 Jan 2020 (closed 2457 days ago)
Decision due
31 Jan 2020 · decided 30 Jan 2020
Decision
Grant permission on 30 Jan 2020
Proposed development
The development will consist of: The construction of a 3 bay maintenance facility comprising of 2 no. single storey drive-in garages with pitched roofs and 1 no. single storey canteen / toilet / stores / workshop area with mono pitch roof (approx.. 436m2/6.8m high), building signage, associated site works, 9 no. lighting columns (approx.. 6m); removal of existing fencing and replacement with a 2m high boundary fence along the west, north and east boundaries; modifications to the existing boundary wall/fence along Tolka Quay Road to close one access and add one pedestrian gate and; car parking for 36 cars. The development also includes reconfiguration and widening of existing entrances / exits and connection to existing services on Tolka Quay Road, Dublin Port, Dublin 1. All development to take place on a site of aprrox. 0.2 hectares. The proposed development replaces the permission previously granted to Dublin Port Company for the construction of replacement offices and maintenance shed (Reg. Ref: 3143/18) on the same site. The site of the proposed development is a SEVESO site
As published by the register.
Site area
1,997 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Nearby 5 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Zoning

Zone Z7 - DEV PLAN 2022-2028

C2.2 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 1
    Indaver Ireland Limited (Tolka Quay Road)
  • Natural Heritage Area (incl. proposed) · 1
    North Dublin Bay
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels
  • Special Protection Area · 1
    South Dublin Bay and River Tolka Estuary SPA

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

4574/19 is a planning application to Dublin City Council for the development will consist of: The construction of a 3 bay maintenance facility, received on 28 Nov 2019; permission was granted on 30 Jan 2020.