PlanningRegister.ie
Dublin City Council · 4659/22

43 Shanowen Drive, Santry, Dublin 9

Approved in Nov 2022. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 11 Aug 2022Received
  2. 5 Oct 2022Approved
  3. 15 Nov 2022Final approval
  4. 15 Nov 2027Approval runs out

An email when the builder tells the council work is starting.

Development site This site is on the council's derelict sites register. Derelict site: this site on the map

Planning details

Status
Approved
Decision
Approved · 5 Oct 2022
Reference
4659/22
Received
11 Aug 2022
Site
430 m²

What’s proposed

The development will consist of (1) the demolition of the existing garage roof to the side of the house and conversion of the garage space to a habitable bedroom, (2) a ground floor extension to the front and side of the existing dwelling, (3) a first floor extension to the side of the existing dwelling, (4) extension of the existing hip roof across the proposed first floor extension and a part conversion to a gable…

Show all

end roof, (5) the conversion of the existing attic space to a habitable bedroom including a dormer roof extension to the rear, (6) a low height storage locker to the front, (7) a low height retaining wall to a raised garden area and the construction of a new shed to the rear, (8) an increase in width to the existing vehicular access with a new dished footpath exiting onto Shanowen Drive, Santry, Dublin 9, complete with new gates and increased hard surface driveway and all associated site works

17 other applications within 500 m in the last year

Get the full report

Nearby 17 · 500 m · 12 months

Distance
Time
Show all 17

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z1 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • NIAH-recorded building · 1
    post box
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

4659/22 is a planning application to Dublin City Council for the development will consist of (1) the demolition of the existing garage roof to the, received on 11 Aug 2022; permission was granted on 5 Oct 2022.