4718/22 is a planning application for permission at Dominican Convent Campus, immediately south of St. Catherines Girls Senior School (D07 V045) and to the north of Convent View Crescent and bounded to the east by Ratoath Road, Cabra West, Dublin 7, received by Dublin City Council on 24 Aug 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: Permission for a Social Housing development on a site of 2.05 Hectares on the Dominican Convent Campus, immediately south of St Catherine's Girls Senior School( D07 V045) and to the north of Convent View Crescent and bounded to the east by Ratoath Road, Cabra West, Dublin 7. The proposed development will consist of: • The construction of 95 no. residential dwellings, of which there are 14 no. 1 Bedroom Dwellings, 67 no. 2 Bedroom Dwellings, 13 no. 3 Bedroom Dwellings and 1 no. 4 Bedroom Dwelling, of which 35 no. are Ground Floor and 60 no. are on the First/Second Floor, all to be provided in 5 no. Three-Storey Blocks all with associated private amenity space, with a gross floor area of 7,759.4m² and the construction of 2 no. Community Rooms of 77.8m² and 75.6 m², respectively. • The provision of a total of 7,358m² of public open space which includes an 890m² public plaza and a 2,928m2 public park and children's play area. 60 no. surface car parking spaces and 52 no. visitor bicycle spaces within the public open space, • The provision of 2,656.7m² communal open space to the rear of the residential units with 193 no. residents bicycle spaces within 7 no. covered areas within the communal open space. • The construction of a new vehicular, cycle and pedestrian entrance to Ratoath Road, • The removal of the existing vehicular entrance and the demolition of the existing boundary wall and fence, and removal of entrance gates at Ratoath Road, • The construction of new boundary treatments to the northern boundary consisting of blockwork walls, fencing and hedge planting, to the eastern boundary consisting of brickwork walls, fencing and hedge planting, and to the southern boundary consisting of fencing and hedge planting to accompany the existing hedgerow and existing blockwork boundary. • All landscaping works, covered bin storage to the front of each dwelling, infrastructure works, external lighting, 1 no. ESB substation, and all enabling and site development works and services. The council granted permission on 18 Oct 2022. The five-week observation window closed on 28 Sept 2022. A commencement notice (CN0128309DC) was lodged on 6 May 2025, so works have started on site. The site is zoned null under the Dublin City Council development plan. The scheme is for 95 units. Within 500 m there are 61 other decided applications in the last five years and 3 appeals.
Proposal
Permission for a Social Housing development on a site of 2.05 Hectares on the Dominican Convent Campus, immediately south of St Catherine's Girls Senior School( D07 V045) and to the north of Convent View Crescent and bounded to the east by Ratoath Road, Cabra West, Dublin 7. The proposed development will consist of: • The construction of 95 no. residential dwellings, of which there are 14 no. 1 Bedroom Dwellings, 67 no. 2 Bedroom Dwellings, 13 no. 3 Bedroom Dwellings and 1 no. 4 Bedroom Dwelling, of which 35 no. are Ground Floor and 60 no. are on the First/Second Floor, all to be provided in 5 no. Three-Storey Blocks all with associated private amenity space, with a gross floor area of 7,759.4m² and the construction of 2 no. Community Rooms of 77.8m² and 75.6 m², respectively. • The provision of a total of 7,358m² of public open space which includes an 890m² public plaza and a 2,928m2 public park and children's play area. 60 no. surface car parking spaces and 52 no. visitor bicycle spaces within the public open space, • The provision of 2,656.7m² communal open space to the rear of the residential units with 193 no. residents bicycle spaces within 7 no. covered areas within the communal open space. • The construction of a new vehicular, cycle and pedestrian entrance to Ratoath Road, • The removal of the existing vehicular entrance and the demolition of the existing boundary wall and fence, and removal of entrance gates at Ratoath Road, • The construction of new boundary treatments to the northern boundary consisting of blockwork walls, fencing and hedge planting, to the eastern boundary consisting of brickwork walls, fencing and hedge planting, and to the southern boundary consisting of fencing and hedge planting to accompany the existing hedgerow and existing blockwork boundary. • All landscaping works, covered bin storage to the front of each dwelling, infrastructure works, external lighting, 1 no. ESB substation, and all enabling and site development works and services.
- Status
- Decision Notice Issued
- Decision
- Grant permission on 18 Oct 2022
- Final grant
- 28 Nov 2022
- Units
- 95
- Site (from polygon)
- 1.98 ha
- Location precision
- site (coords_polygon)
Timeline
- 24 Aug 2022New applicationObservation window closed 28 Sept 2022
- 18 Oct 2022DecisionAppeal window closed 15 Nov 2022

Full planning report for 53.36916, -6.30787
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
- Commencement notice CN0128309DC
Zoning at the site
Zone Z9 - DEV PLAN 2022-2028
Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.
Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.
Reserved for the schools, creches, community and health facilities a neighbourhood needs.
Designations within 250 m
No OPW flood extent nearby.
- NIAH-recorded building · 3
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88893). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |