PlanningRegister.ie
Dublin City Council · 5524/22

77 Kenilworth Square East, Dublin 6

Approved in Apr 2023. Building started in 2023.

  1. 22 Dec 2022Received
  2. 24 Feb 2023Approved
  3. 13 Apr 2023Final approval
  4. 5 May 2023Building started
Status
Building startedi
Decision
Approved · 24 Feb 2023
Council
Dublin City Council
Type
Permission

Live near 77 Kenilworth Square East?

Everything else planned on your street, in one report.

Check my street

What’s proposed

PROTECTED STRUCTURE: Conservation based repair works comprising: a) Replacement of existing non-original uPVC windows to front and rear elevations with traditional hardwood sliding sashes with slimline double glazing. b) Repointing of brickwork to front elevation with traditional lime based mortar. c) Treatment of internal damp and repair of existing cornice to front Reception Room at Entrance Level. d) Removal of existing boast pebbledash to rear return and replastering with traditional lime based render with ruled and lined finish. e) Blocking up of non-original opening to gable wall to front Reception Room at Entrance Level with conservation based repairs to existing plaster and reinstatement of skirting board to match original. f) Addition of new en suite bathroom to master bedroom at first floor level with new connections to existing soil vent stack to rear elevation. g) Opening up of existing structure to rear return to enable construction of new single storey flat roofed extension as open plan family area comprising kitchen/ living/ dining room at garden level. h) Removal of non-original metal balustrade at front and construction of new external access steps in granite as new secondary entrance to existing extension to north of existing house; j) New hard and soft landscaping to rear at garden level only and k) all associated site works including compliance with SuDS requirements for surface water attenuation and disposal at 77 Kenilworth Square East, Dublin 6, D06 C983, a Protected Structure within an Architectural Conservation Area

Planning details

Reference
5524/22
Local authority
Dublin City Council
Status
Commenced · register status “Decision Notice Issued”
Received
22 Dec 2022
Observations close
7 Feb 2023 (closed 1341 days ago)
Decision due
24 Feb 2023 · decided 24 Feb 2023
Decision
Grant permission on 24 Feb 2023
Proposed development
PROTECTED STRUCTURE: Conservation based repair works comprising: a) Replacement of existing non-original uPVC windows to front and rear elevations with traditional hardwood sliding sashes with slimline double glazing. b) Repointing of brickwork to front elevation with traditional lime based mortar. c) Treatment of internal damp and repair of existing cornice to front Reception Room at Entrance Level. d) Removal of existing boast pebbledash to rear return and replastering with traditional lime based render with ruled and lined finish. e) Blocking up of non-original opening to gable wall to front Reception Room at Entrance Level with conservation based repairs to existing plaster and reinstatement of skirting board to match original. f) Addition of new en suite bathroom to master bedroom at first floor level with new connections to existing soil vent stack to rear elevation. g) Opening up of existing structure to rear return to enable construction of new single storey flat roofed extension as open plan family area comprising kitchen/ living/ dining room at garden level. h) Removal of non-original metal balustrade at front and construction of new external access steps in granite as new secondary entrance to existing extension to north of existing house; j) New hard and soft landscaping to rear at garden level only and k) all associated site works including compliance with SuDS requirements for surface water attenuation and disposal at 77 Kenilworth Square East, Dublin 6, D06 C983, a Protected Structure within an Architectural Conservation Area
As published by the register.
Site area
No site boundary mapped
Applicant
Not published — the national feed carries no applicant name

Nearby 221 · 500 m · 5 years

Show all 221

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Building started

  • 28 Sept 2026 · Builder told the council work was starting (opted out of the finish sign-off) CN0147766DC
  • 5 May 2023 · Builder told the council small works were starting CN0100291DC

Zoning

Zone Z2 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

No mapped flood area nearby.

  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

5524/22 is a planning application to Dublin City Council for PROTECTED STRUCTURE: Conservation based repair works comprising: a) Replacement of, received on 22 Dec 2022; permission was granted on 24 Feb 2023.