Planning Register
Dublin City Council · WEB1482/26 · Permission

Site of c. 4.4609 ha located within the school campus at Alexandra College, Richmond Avenue South, Milltown, Dublin 6, D06 KX50.

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 3 Mar 2026We first saw it 11 Sept 2026, 18:51 (193 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

WEB1482/26 is a planning application for permission at Site of c. 4.4609 ha located within the school campus at Alexandra College, Richmond Avenue South, Milltown, Dublin 6, D06 KX50., received by Dublin City Council on 3 Mar 2026 and first seen by Planning Register on 11 Sept 2026. The application describes: The proposed development will consist of the demolition of the existing single storey Music Building and associated glass link corridor connection to the Senior School (c. 295 sq.m) and the construction of a new 1–4 storey Science, Technology, Engineering, Arts and Maths (STEAM) building (c. 3048 sq.m) inclusive of the provision of the following elements throughout: Reception, 2 no. art rooms, atrium/ collaborative space, town hall space, 3 no. store rooms, plant room, toilets and changing space at ground floor level. Collaboration space, 2 no. science labs, computer lab, art room, town hall space, preparation room, 2 no. store rooms, recording studio, lobby and toilets at first floor level. 2 no. science labs, 5 no. maths rooms, preparation room and toilets at second floor level. Collaboration space, 2 no. science labs, preparation room and toilets at third floor level. The proposal includes the provision of stair cores, lifts and circulation spaces throughout the STEAM building. The proposed development will include the provision of all associated signage and lighting, provision of plant and PV panels at roof level and associated roof access point for servicing/ maintenance only, blue/ green roofs, hard and soft landscaping and boundary treatments, attenuation proposals, all associated infrastructural and site development works above and below ground and associated connections to services (foul and surface water drainage and water supply) and the provision of an ESB substation (c.28 sq.m) at one of the indicative locations shown, subject to agreement with ESB. The council granted permission on 24 Apr 2026. The five-week observation window closed on 7 Apr 2026. A commencement notice (CN0144420DC) was lodged on 6 Jul 2026, so works have started on site. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 90 other decided applications in the last five years and 16 appeals.

Appeal window closes 22 May 2026 closed 113 days ago
4 weeks from the council's decision (24 Apr 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

The proposed development will consist of the demolition of the existing single storey Music Building and associated glass link corridor connection to the Senior School (c. 295 sq.m) and the construction of a new 1–4 storey Science, Technology, Engineering, Arts and Maths (STEAM) building (c. 3048 sq.m) inclusive of the provision of the following elements throughout: Reception, 2 no. art rooms, atrium/ collaborative space, town hall space, 3 no. store rooms, plant room, toilets and changing space at ground floor level. Collaboration space, 2 no. science labs, computer lab, art room, town hall space, preparation room, 2 no. store rooms, recording studio, lobby and toilets at first floor level. 2 no. science labs, 5 no. maths rooms, preparation room and toilets at second floor level. Collaboration space, 2 no. science labs, preparation room and toilets at third floor level. The proposal includes the provision of stair cores, lifts and circulation spaces throughout the STEAM building. The proposed development will include the provision of all associated signage and lighting, provision of plant and PV panels at roof level and associated roof access point for servicing/ maintenance only, blue/ green roofs, hard and soft landscaping and boundary treatments, attenuation proposals, all associated infrastructural and site development works above and below ground and associated connections to services (foul and surface water drainage and water supply) and the provision of an ESB substation (c.28 sq.m) at one of the indicative locations shown, subject to agreement with ESB.

Status
Decision Notice Issued
Decision
Grant permission on 24 Apr 2026
Final grant
2 Jun 2026
Site (from polygon)
6.44 ha
Location precision
site (coords_polygon)

Timeline

  • 3 Mar 2026
    New application
    Observation window closed 7 Apr 2026
  • 24 Apr 2026
    Decision
    Appeal window closed 22 May 2026

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.31097, -6.25043

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

  • Commencement notice CN0144420DC
    6 Jul 2026Richmond Avenue South, Dublin, Dublin 6, D06 T2V0matched by spatial

Zoning at the site

Zone Z1 - DEV PLAN 2022-2028

R2 — Existing residential

Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

S5 — Sustainable neighbourhood infrastructure

Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.

Reserved for the schools, creches, community and health facilities a neighbourhood needs.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • Radon risk area · 2
    About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
  • Record of Protected Structures · 2
    Viaduct; Clonskeagh Castle
  • Recorded monument · 11
    Bridge; Water mill - unclassified; Water mill - unclassified

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88449). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open