36, Palmerston Road, Rathmines, Dublin 6, D06 A3V8
- 11 Mar 2026Received
- 5 May 2026Grant permission
- 9 Jun 2026Final grant
- Status
- Granted
- Decision
- Grant permission · 5 May 2026
- Council
- Dublin City Council
- Type
- Permission
- Site
- 653 m²
What’s proposed
PROTECTED STRUCTURE: The development will consist of the extension and refurbishment of the existing three storey end of terrace house, a protected structure. Works include: (i) Demolition of a single storey side extension and construction of new single storey ground floor extensions to the rear and side. (ii) Alterations on the ground and second floor including Internal breathable wall Insulation, (iii) Removal of existing concrete floor and provision of a new insulated concrete floor to the ground floor, (iv) Electrical rewiring of, installation of solar panels on the existing valley, upgrading the mechanical installation including new underfloor heating to the ground floor, (v) Replacement window and removal of ground floor external doors and demolition of part of existing rear wall, (vi) External pipework and new lime and /or render repairs on the rear elevation, (vii) Repointing of existing granite steps, (viii) New hard and soft landscaping, (ix) Storage structure and car charging point in the front garden, (x) Soakaway, ancillary drainage and site development works
WEB1573/26 is a planning application to Dublin City Council for pROTECTED STRUCTURE: The development will consist of the extension and refurbishment of, received on 11 Mar 2026; permission was granted on 5 May 2026.
Planning details
- Reference
- WEB1573/26
- Local authority
- Dublin City Council
- Status
- Granted · register status “Decision Notice Issued”
- Received
- 11 Mar 2026
- Observations close
- 15 Apr 2026 (closed 152 days ago)
- Decision due
- 5 May 2026 · decided 5 May 2026
- Decision
- Grant permission on 5 May 2026
- Proposed development
- PROTECTED STRUCTURE: The development will consist of the extension and refurbishment of the existing three storey end of terrace house, a protected structure. Works include: (i) Demolition of a single storey side extension and construction of new single storey ground floor extensions to the rear and side. (ii) Alterations on the ground and second floor including Internal breathable wall Insulation, (iii) Removal of existing concrete floor and provision of a new insulated concrete floor to the ground floor, (iv) Electrical rewiring of, installation of solar panels on the existing valley, upgrading the mechanical installation including new underfloor heating to the ground floor, (v) Replacement window and removal of ground floor external doors and demolition of part of existing rear wall, (vi) External pipework and new lime and /or render repairs on the rear elevation, (vii) Repointing of existing granite steps, (viii) New hard and soft landscaping, (ix) Storage structure and car charging point in the front garden, (x) Soakaway, ancillary drainage and site development worksAs published by the register.
- Site area
- 653 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name
Full planning report for 53.31668, -6.25915
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
Zone Z2 - DEV PLAN 2022-2028
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 83308). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |