Nos 23, 24 & 29 Parkgate Street, Dublin 8
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
WEB1732/25 is a planning application for permission at Nos 23, 24 & 29 Parkgate Street, Dublin 8, received by Dublin City Council on 4 Apr 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: Permission for development at this site of number 23 to 24 Parkgate Street (former Westbrook Motors property) D08 WF6W, Dublin 8 and No. 29 Parkgate Street D08 PN77, Dublin 8. The site is located adjacent/proximate to protected structures 17-22 Parkgate Street (RPS Ref. 6314) and 28 Parkgate Street, Ryan’s of Parkgate Street (RPS Ref. 6315). The proposed development will consist of the demolition of all existing buildings on site including the former motor sales buildings, forecourt, car parking building and no.29 Parkgate Street (with the exception of the facade either side of the existing gate). Construction of a mixed-use hotel and residential development as follows: • A hotel building (4 to 6 storeys over basement) which will comprise 155-no. bedrooms (all en-suite), with a licensed restaurant, public bar and all ancillary facilities/ services/plant associated with the hotel. • The development will also include a separate apartment block (2 to 5 storeys) comprising 22 no. units (11 no.1-beds and 11 no.2-beds) all with private open space. • The construction of a single residential dwelling (3 bed townhouse, 3 storeys in height) to replace existing No. 29 Parkgate Street. Access to the apartment development will be via the existing access from Parkgate Street. The development will also include the provision of a new loading bay outside no. 29 Parkgate Street and the expansion of the existing loading bay outside 23/24 Parkgate Street. All associated site development works, plant areas, landscaping, open spaces, bike stores, waste management areas, and services provision. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. The council granted permission on 29 Sept 2025. The five-week observation window closed on 9 May 2025. An Coimisiún Pleanála decided appeal 500157 on 24 Oct 2025 (invalid). A commencement notice (CN0147418DC) was lodged on 14 Sept 2026, so works have started on site. The site is zoned null under the Dublin City Council development plan. The scheme is for 22 units. Within 500 m there are 57 other decided applications in the last five years and 6 appeals.
Proposal
Permission for development at this site of number 23 to 24 Parkgate Street (former Westbrook Motors property) D08 WF6W, Dublin 8 and No. 29 Parkgate Street D08 PN77, Dublin 8. The site is located adjacent/proximate to protected structures 17-22 Parkgate Street (RPS Ref. 6314) and 28 Parkgate Street, Ryan’s of Parkgate Street (RPS Ref. 6315). The proposed development will consist of the demolition of all existing buildings on site including the former motor sales buildings, forecourt, car parking building and no.29 Parkgate Street (with the exception of the facade either side of the existing gate). Construction of a mixed-use hotel and residential development as follows: • A hotel building (4 to 6 storeys over basement) which will comprise 155-no. bedrooms (all en-suite), with a licensed restaurant, public bar and all ancillary facilities/ services/plant associated with the hotel. • The development will also include a separate apartment block (2 to 5 storeys) comprising 22 no. units (11 no.1-beds and 11 no.2-beds) all with private open space. • The construction of a single residential dwelling (3 bed townhouse, 3 storeys in height) to replace existing No. 29 Parkgate Street. Access to the apartment development will be via the existing access from Parkgate Street. The development will also include the provision of a new loading bay outside no. 29 Parkgate Street and the expansion of the existing loading bay outside 23/24 Parkgate Street. All associated site development works, plant areas, landscaping, open spaces, bike stores, waste management areas, and services provision. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.
- Status
- Appeal Decided
- Decision
- Grant permission on 29 Sept 2025
- Final grant
- 3 Mar 2026
- Units
- 22
- Site (from polygon)
- 3,428 m²
- Location precision
- site (coords_polygon)
Timeline
- 4 Apr 2025New applicationObservation window closed 9 May 2025
- 29 May 2025Further information requested
- 2 Sept 2025Further information received
- 29 Sept 2025DecisionAppeal window closed 28 Oct 2025
- 24 Oct 2025Appeal lodged

Full planning report for 53.34833, -6.29329
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Commencement
- Commencement notice CN0147418DC
Zoning at the site
Zone Z5 - DEV PLAN 2022-2028
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
The main town centre — retail, offices, civic uses, apartments.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- EPA-licensed facility · 4
- NIAH-recorded building · 57
- Radon risk area · 1
- Recorded monument · 7
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 87373). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |