Planning Register
Dublin City Council · WEB1842/25 · Permission

110 & 114 Howth Road, Dublin 3, D03 KV60 & D03 DE48

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 15 Apr 2025We first saw it 11 Sept 2026, 18:51 (515 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

WEB1842/25 is a planning application for permission at 110 & 114 Howth Road, Dublin 3, D03 KV60 & D03 DE48, received by Dublin City Council on 15 Apr 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: We, Matriciana Ltd., intend to apply for Planning Permission for development at this site: 110 & 114, Howth Road, Clontarf, Dublin 3. The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m2 GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m2 GFA) plus ancillary outbuildings (47 m2 GFA overall). 2. The construction of a residential development (9,953.66 m2 GFA) consisting of 86 no. apartment units (3 no. studios, 35 no. 1 - bed units, 41 no. 2 - bed units, and 7 no. 3 - bed units) ranging between 4 to 7 storeys in height over basement level. 3. Provision of resident's communal area (38 m2 GFA) at ground floor level. 4. Provision of 1 no. Crèche Facility at ground floor level (75 m2 GFA) with capacity for 20 no. children and associated, secure, open play area (120.8 m2). 5. Provision of 1 no. Café Unit (50 m2 GFA) at ground floor level with associated outdoor seating area. 6. Removal of 2 no. existing vehicular site entrances off Howth Road (R105) and provision of new site access off Howth Road (R105) to serve the development with vehicular, cycling and pedestrian access. 7. The construction of a basement to be accessed off Howth Road (R105) with provision for 46 no. car parking spaces, including accessible and electric vehicle spaces, 2 no. motorcycle parking spaces and 142 no. 'long stay' residential secured bicycle parking spaces. 8. 4 no. surface level car parking spaces (consisting of 2 no. employment parking spaces in connection with the crèche and café and 2 no. additional parking spaces as shared GoCar/ Visitor parking spaces), 1 no. set down area and 1 no. parking space for delivery/ services vehicles. 9. Provision of 142 no. 'long stay' residential secured bicycle parking spaces at basement level together with additional 50 no. visitor bicycle parking spaces in secure locations at surface level throughout the site. 10. All apartments are provided with private terraces / balconies. 11. The scheme provides a total of 3,059.51 m2 of open space, consisting of 2,075.55 m2 of Communal Open Space (44% of overall site area), 467.86 m2 of Public Open Space for community use (10% of overall site area), and 516.1 m2 of communal roof terrace gardens at 4th, 5th and 6th floor level for residents (11% of overall site area). 12. Total non-residential use is 163 m2 (1.6 % of overall development). 13. Provision of 63.6 m2 of Bin Storage, 30 m2 of Storage, 34.2 m2 of CHP Room and 40 m2 of Communications Room (all at basement level). 14. The development will also provide for all associated ancillary site development infrastructure including: public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments and all associated site development and excavation works above and below ground necessary to facilitate the development. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council, Planning Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8 during its public opening hours (9.00a.m.- 4.30p.m.). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission. The council granted permission on 17 Sept 2025. The five-week observation window closed on 20 May 2025. An Coimisiún Pleanála decided appeal 500043 on 16 Feb 2026 (grant conditions). The site is zoned null under the Dublin City Council development plan. The scheme is for 86 units. Within 500 m there are 112 other decided applications in the last five years and 18 appeals.

Appeal window closes 15 Oct 2025 closed 332 days ago
4 weeks from the council's decision (17 Sept 2025) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

We, Matriciana Ltd., intend to apply for Planning Permission for development at this site: 110 & 114, Howth Road, Clontarf, Dublin 3. The development will consist of: 1. The demolition of 2 no. existing, detached residential dwellings on the subject site, 110, Howth Road, Dublin 3, D03 KV60 (single storey dwelling, 168.7 m2 GFA) and 114, Howth Road, Dublin 3, D03 DE48 (dormer dwelling, 274.5 m2 GFA) plus ancillary outbuildings (47 m2 GFA overall). 2. The construction of a residential development (9,953.66 m2 GFA) consisting of 86 no. apartment units (3 no. studios, 35 no. 1 - bed units, 41 no. 2 - bed units, and 7 no. 3 - bed units) ranging between 4 to 7 storeys in height over basement level. 3. Provision of resident's communal area (38 m2 GFA) at ground floor level. 4. Provision of 1 no. Crèche Facility at ground floor level (75 m2 GFA) with capacity for 20 no. children and associated, secure, open play area (120.8 m2). 5. Provision of 1 no. Café Unit (50 m2 GFA) at ground floor level with associated outdoor seating area. 6. Removal of 2 no. existing vehicular site entrances off Howth Road (R105) and provision of new site access off Howth Road (R105) to serve the development with vehicular, cycling and pedestrian access. 7. The construction of a basement to be accessed off Howth Road (R105) with provision for 46 no. car parking spaces, including accessible and electric vehicle spaces, 2 no. motorcycle parking spaces and 142 no. 'long stay' residential secured bicycle parking spaces. 8. 4 no. surface level car parking spaces (consisting of 2 no. employment parking spaces in connection with the crèche and café and 2 no. additional parking spaces as shared GoCar/ Visitor parking spaces), 1 no. set down area and 1 no. parking space for delivery/ services vehicles. 9. Provision of 142 no. 'long stay' residential secured bicycle parking spaces at basement level together with additional 50 no. visitor bicycle parking spaces in secure locations at surface level throughout the site. 10. All apartments are provided with private terraces / balconies. 11. The scheme provides a total of 3,059.51 m2 of open space, consisting of 2,075.55 m2 of Communal Open Space (44% of overall site area), 467.86 m2 of Public Open Space for community use (10% of overall site area), and 516.1 m2 of communal roof terrace gardens at 4th, 5th and 6th floor level for residents (11% of overall site area). 12. Total non-residential use is 163 m2 (1.6 % of overall development). 13. Provision of 63.6 m2 of Bin Storage, 30 m2 of Storage, 34.2 m2 of CHP Room and 40 m2 of Communications Room (all at basement level). 14. The development will also provide for all associated ancillary site development infrastructure including: public lighting, new watermain connection and foul and surface water drainage; internal roads & footpaths; site landscaping, including boundary treatments and all associated site development and excavation works above and below ground necessary to facilitate the development. The planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of Dublin City Council, Planning Department, Block 4, Ground Floor, Civic Offices, Wood Quay, Dublin 8 during its public opening hours (9.00a.m.- 4.30p.m.). A submission or observation in relation to the application may be made in writing to the planning authority on payment of the prescribed fee (€20.00) within the period of 5 weeks beginning on the date of receipt by the authority of the application, and such submissions or observations will be considered by the planning authority in making a decision on the application. The planning authority may grant permission subject to or without conditions, or may refuse to grant permission.

Status
Appeal Decided
Decision
Grant permission on 17 Sept 2025
Final grant
16 Feb 2026
Units
86
Site (from polygon)
4,661 m²
Location precision
site (coords_polygon)

Timeline

  • 15 Apr 2025
    New application
    Observation window closed 20 May 2025
  • 9 Jun 2025
    Further information requested
  • 21 Aug 2025
    Further information received
  • 17 Sept 2025
    Decision
    Appeal window closed 15 Oct 2025
  • 13 Oct 2025
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.36775, -6.21513

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

ACP 500043 · Planning Appeal · decided · Granted with conditions 16 Feb 2026
received by the Commission 10 Oct 2025 · inspector's report · board order

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z1 - DEV PLAN 2022-2028

    R2 — Existing residential

    Z1: Sustainable Residential Neighbourhoods: To protect, provide and improve residential amenities.

    An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

    Designations within 250 m

    No OPW flood extent nearby.

    • NIAH-recorded building · 15
      De La Salle Provincialate; house; Hollybrook Park
    • Radon risk area · 3
      About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 87836). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open