17 Shrewsbury Road, Ballsbridge, Dublin 4

Approved in Aug 2025. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 23 May 2025Received
  2. 16 Jul 2025Approved
  3. 20 Aug 2025Final approval
  4. 20 Aug 2030Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Approved · 16 Jul 2025
Reference
WEB2136/25
Received
23 May 2025
Site
2,600 m²

What’s proposed

The development will consist of the following: (ii) Modification to existing brick piers including the addition of natural granite to the existing brick piers to either side of the vehicular access opening and a new brick pier with granite detailing to the south side of the pedestrian access opening.

Show all

(ii) The removal of the existing painted steel gates to the vehicular and pedestrian access and replacement with new taller steel gates to both openings. (iii) The addition of a decorative painted steel railing to the top of the existing boundary wall to the road, so providing a height of c.2.05 metres from the footpath level to the top of proposed railing

17 other applications within 500 m in the last year

Get the full report

Nearby 17 · 500 m · 12 months

Distance
Time
Show all 17

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z2 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

WEB2136/25 is a planning application to Dublin City Council for the development will consist of the following: (ii) Modification to existing brick piers, received on 23 May 2025; permission was granted on 16 Jul 2025.