a c. 1.7 ha site located within the ESB Inchicore substation site, specifically lands south of Kylemore Way and northwest of the existing ESB Substation, Kylemore Way, Dublin 8, D08 E398 and to the immediate west of the Kylemore BESS, Kylemore Road, Dubli
- 30 May 2025Received
- 28 Aug 2025Grant permission
- 2 Oct 2025Final grant
- Status
- Granted
- Decision
- Grant permission · 28 Aug 2025
- Council
- Dublin City Council
- Type
- Permission
- Site
- 2.03 ha
What’s proposed
The proposed development will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of 1. Up to 60 no. battery energy storage enclosures, split across 6 no. bays, each bay contains 2 no. rows of 5 no. enclosures. Each bay is on a concrete plinth of width c. 6.5 m and a maximum length of c. 47 m. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. 2. 6 No. Medium Voltage (MV) Skids , twin Inverter Skids (c. 12.8m x 6m x 2.4m) and associated bunds and fire walls. 3. Control building (c. 222 sq.m). 4. Ancillary plant and equipment comprising of a) A firefighting water tank (c. 9.75m high) and pumphouse (c. 17 sq.m) b) 2 no. Auxiliary Transformers (c. 2m x 2m x 2m) and associated bunds and fire walls c) 3 no. spare parts stores (20ft containers) (c. 15 sq.m each) d) 2 no. backup diesel generator plinths (c. 28.7 sq.m each) e) HV compound including 2 no. Grid step-up transformers (c. 5.7m x 3.3m x 2.8m and c. 6.6m x 5.5m x 5.1m), associated bunds and fire walls, and all other associated equipment including prefabricated electrical control room (c. 51 sq.m), linking with an underground cable and f) An underground fire water retention tank and underground attenuation tank. 5. Operation and Maintenance site offices including welfare facilities (c. 27.9 sq.m) 6. All service connections including electrical, potable water and connections to surface water drains 7. 1 no. lightning monopole (c. 18m high) and 8. All other ancillary site clearance and development works including provision of areas of hardstanding, internal access roads lighting and CCTV, laydown area, fencing and access gates (c. 3.5m in height), car parking; and connections to site services and networks. Planning permission is being sought for a duration of 10-years
WEB2226/25 is a planning application to Dublin City Council for the proposed development will consist of a battery energy storage system (BESS) located, received on 30 May 2025; permission was granted on 28 Aug 2025.
Planning details
- Reference
- WEB2226/25
- Local authority
- Dublin City Council
- Status
- Granted · register status “Decision Notice Issued”
- Received
- 30 May 2025
- Observations close
- 4 Jul 2025 (closed 438 days ago)
- Decision due
- 28 Aug 2025 · decided 28 Aug 2025
- Decision
- Grant permission on 28 Aug 2025
- Proposed development
- The proposed development will consist of a battery energy storage system (BESS) located within a fenced compound and will (subject to detailed design, commercial and technical considerations) comprise of 1. Up to 60 no. battery energy storage enclosures, split across 6 no. bays, each bay contains 2 no. rows of 5 no. enclosures. Each bay is on a concrete plinth of width c. 6.5 m and a maximum length of c. 47 m. Each battery enclosure will incorporate battery packs as well as power electronics, battery management systems, cooling units and fire suppression systems. 2. 6 No. Medium Voltage (MV) Skids , twin Inverter Skids (c. 12.8m x 6m x 2.4m) and associated bunds and fire walls. 3. Control building (c. 222 sq.m). 4. Ancillary plant and equipment comprising of a) A firefighting water tank (c. 9.75m high) and pumphouse (c. 17 sq.m) b) 2 no. Auxiliary Transformers (c. 2m x 2m x 2m) and associated bunds and fire walls c) 3 no. spare parts stores (20ft containers) (c. 15 sq.m each) d) 2 no. backup diesel generator plinths (c. 28.7 sq.m each) e) HV compound including 2 no. Grid step-up transformers (c. 5.7m x 3.3m x 2.8m and c. 6.6m x 5.5m x 5.1m), associated bunds and fire walls, and all other associated equipment including prefabricated electrical control room (c. 51 sq.m), linking with an underground cable and f) An underground fire water retention tank and underground attenuation tank. 5. Operation and Maintenance site offices including welfare facilities (c. 27.9 sq.m) 6. All service connections including electrical, potable water and connections to surface water drains 7. 1 no. lightning monopole (c. 18m high) and 8. All other ancillary site clearance and development works including provision of areas of hardstanding, internal access roads lighting and CCTV, laydown area, fencing and access gates (c. 3.5m in height), car parking; and connections to site services and networks. Planning permission is being sought for a duration of 10-yearsAs published by the register.
- Site area
- 2.03 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name
Full planning report for 53.33424, -6.34180
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
Zone Z6 - DEV PLAN 2022-2028
Z6: Employment/Enterprise: To provide for the creation and protection of enterprise and facilitate opportunities for employment creation.
Zoned for employment uses. Housing is not the intended use here.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- EPA-licensed facility · 5
- Natural Heritage Area (incl. proposed) · 1
- NIAH-recorded building · 1
- Radon risk area · 2
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88948). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |