PlanningRegister.ie
Dublin City Council · WEB2283/25

285 Clontarf Road, Clontarf, Dublin 3, D03 N7E5

Declared invalid.

  1. 5 Jun 2025Received
  2. 11 Jun 2025Application declared invalid

Planning details

Status
Withdrawn or invalid
Decision
Application declared invalid · 11 Jun 2025
Reference
WEB2283/25
Received
5 Jun 2025
Site
403 m²

What’s proposed

The development will consist of: Demolition of the existing garage structure (38 m2 ) and replacement with a ground plus mezzanine level studio/live/work structure, ancillary to the main house, extending to a total of 79m2. .

Show all

The accommodation will include ground level open plan studio/live/work space, ground level kitchen and toilet, mezzanine level open plan studio/live/work space, mezzanine level bathroom and storage. The structure will have a gate access onto Seafield Close, rooflights, photovoltaic panels, heat pump and will include all associated site works, as well as hard and soft landscaping

22 other applications within 500 m in the last year

Open the report

Nearby 22 · 500 m · 12 months

Distance
Time
Show all 22

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

Zone Z1 - DEV PLAN 2022-2028

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • Natural Heritage Area (incl. proposed) · 1
    North Dublin Bay
  • Special Protection Area · 2
    North Bull Island SPA; South Dublin Bay and River Tolka Estuary SPA
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

WEB2283/25 is a planning application to Dublin City Council for the development will consist of: Demolition of the existing garage structure (38 m2 ), received on 5 Jun 2025; the council declared it invalid on 11 Jun 2025.