Planning Register
Dublin City Council · WEB5203/25 · Permission

59 Pembroke Road, Ballsbridge, Dublin 4

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 23 Sept 2025We first saw it 11 Sept 2026, 18:51 (354 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

WEB5203/25 is a planning application for permission at 59 Pembroke Road, Ballsbridge, Dublin 4, received by Dublin City Council on 23 Sept 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: PROTECTED STURCTURE - (10 year permission) The development will consist of: (a) Fabric repair works: (i) Roofs: Main Roof - Complete necessary maintenance repairs to the existing slates and flashings. Complete repairs to gutters and valleys to eliminate pooling and sediment buildup. Undertake any necessary repairs to the roof structure. Felt roof to roof garden: Undertaken any necessary repairs. Roof of balcony at first floor level: undertake necessary repairs. Rear extension: replace the felt roof finish. Roof Insulation: Remove and replace and / or upgrade existing insulation generally where possible. (ii) External Walls: Brickwork to Front Elevation: Gently clean to remove surface dirt etc. to ensure brick repairs/ replacements match originals. Repair or replace damaged bricks as required. Rake out and re-point brickwork with lime mortar – wigged pointing to match original. Brickwork to Rear Elevation: Complete minor repairs to brickwork and pointing. Rendered Finishes: Undertake structural repairs to cracks as directed by the Structural Engineer. Hack of all loose or damaged or hollow areas of render and re-render to match original. Clean and re-decorate. Masonry elements: Gently clean to remove surface dirt etc. as brickwork. Complete necessary minor repairs to Granite Ashlar and channeled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. (iii) Parapet Walls: Complete further investigations and undertake all necessary remedial and structural repairs. Repair metalwork as necessary. Re-decorate. (iv) Chimney Stacks: Complete all necessary re-building / repair works including re-pointing – wigged finish to match original. Repair or replace damaged chimney pots to match originals. Repair or replace all flashings as necessary. (v) Windows and External Doors: Windows: Complete all necessary repairs to timber frames and sashes. Clean down and re-decorate. Sills / Surrounds: Repair cracks in granite sills and fill all holes. Provide new sills were missing. Repair or replace reveals render, new mastic joint with window frames. External Doors: Repair decayed or damaged timbers. Re-align doors as necessary. Re-decorate. (vi) Steps / Balconies: Main Front Entrance – undertake necessary repairs to the steps and the decorative metalwork balustrade. Decorate balustrade. Steps, both side of Main Entrance: repair defective steps and make safe. Metal Staircases at the LHS and fire escape at the rear: undertake essential repairs and corrosion, replace missing elements, clean down and re-decorate. (vii) Railings / Security Frames: Check all fixings / supports and repair as required. Check for expansion where built into the walls and repair as necessary including any cracks in the masonry / sills etc. Re-decorate. (viii) External Grounds: Boundaries: Repair front railings and granite plinth as necessary. Repair front boundary railings where the neighbour agrees to cut back the trees and shrubs contributing to the damage. Repair / rebuild rear brick / stone walls where neighbour agrees to cut back trees and shrubs contributing to the damage. Rainwater Disposal: Rainwater Disposal: Repair or replace defective rainwater goods as necessary. Clean out all gutters, hopper heads, rainwater pipes etc. and leave water tight and in good working order. Decorate. Remove redundant wires and tidy up retained wires on external surfaces. (b) Provide EV Charge point in front car-parking area. The council granted permission on 17 Nov 2025. The five-week observation window closed on 28 Oct 2025. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 146 other decided applications in the last five years and 38 appeals.

Appeal window closes 15 Dec 2025 closed 271 days ago
4 weeks from the council's decision (17 Nov 2025) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

PROTECTED STURCTURE - (10 year permission) The development will consist of: (a) Fabric repair works: (i) Roofs: Main Roof - Complete necessary maintenance repairs to the existing slates and flashings. Complete repairs to gutters and valleys to eliminate pooling and sediment buildup. Undertake any necessary repairs to the roof structure. Felt roof to roof garden: Undertaken any necessary repairs. Roof of balcony at first floor level: undertake necessary repairs. Rear extension: replace the felt roof finish. Roof Insulation: Remove and replace and / or upgrade existing insulation generally where possible. (ii) External Walls: Brickwork to Front Elevation: Gently clean to remove surface dirt etc. to ensure brick repairs/ replacements match originals. Repair or replace damaged bricks as required. Rake out and re-point brickwork with lime mortar – wigged pointing to match original. Brickwork to Rear Elevation: Complete minor repairs to brickwork and pointing. Rendered Finishes: Undertake structural repairs to cracks as directed by the Structural Engineer. Hack of all loose or damaged or hollow areas of render and re-render to match original. Clean and re-decorate. Masonry elements: Gently clean to remove surface dirt etc. as brickwork. Complete necessary minor repairs to Granite Ashlar and channeled Granite Ashlar walling and pointing. Provide all necessary lead flashings and cover flashings. (iii) Parapet Walls: Complete further investigations and undertake all necessary remedial and structural repairs. Repair metalwork as necessary. Re-decorate. (iv) Chimney Stacks: Complete all necessary re-building / repair works including re-pointing – wigged finish to match original. Repair or replace damaged chimney pots to match originals. Repair or replace all flashings as necessary. (v) Windows and External Doors: Windows: Complete all necessary repairs to timber frames and sashes. Clean down and re-decorate. Sills / Surrounds: Repair cracks in granite sills and fill all holes. Provide new sills were missing. Repair or replace reveals render, new mastic joint with window frames. External Doors: Repair decayed or damaged timbers. Re-align doors as necessary. Re-decorate. (vi) Steps / Balconies: Main Front Entrance – undertake necessary repairs to the steps and the decorative metalwork balustrade. Decorate balustrade. Steps, both side of Main Entrance: repair defective steps and make safe. Metal Staircases at the LHS and fire escape at the rear: undertake essential repairs and corrosion, replace missing elements, clean down and re-decorate. (vii) Railings / Security Frames: Check all fixings / supports and repair as required. Check for expansion where built into the walls and repair as necessary including any cracks in the masonry / sills etc. Re-decorate. (viii) External Grounds: Boundaries: Repair front railings and granite plinth as necessary. Repair front boundary railings where the neighbour agrees to cut back the trees and shrubs contributing to the damage. Repair / rebuild rear brick / stone walls where neighbour agrees to cut back trees and shrubs contributing to the damage. Rainwater Disposal: Rainwater Disposal: Repair or replace defective rainwater goods as necessary. Clean out all gutters, hopper heads, rainwater pipes etc. and leave water tight and in good working order. Decorate. Remove redundant wires and tidy up retained wires on external surfaces. (b) Provide EV Charge point in front car-parking area.

Status
Decision Notice Issued
Decision
Grant permission on 17 Nov 2025
Final grant
23 Dec 2025
Site (from polygon)
985 m²
Location precision
site (coords_polygon)

Timeline

  • 23 Sept 2025
    New application
    Observation window closed 28 Oct 2025
  • 17 Nov 2025
    Decision
    Appeal window closed 15 Dec 2025

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.33194, -6.23834

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z2 - DEV PLAN 2022-2028

    R2 — Existing residential

    Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.

    An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 1
      R149515

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 85397). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open