Planning Register
Dublin City Council · WEB5426/25 · Permission

The Green Hotel, 1-5 Harcourt Street and Cuffe Street, Dublin 2, D02 WR80

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 16 Oct 2025We first saw it 11 Sept 2026, 18:51 (331 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

WEB5426/25 is a planning application for permission at The Green Hotel, 1-5 Harcourt Street and Cuffe Street, Dublin 2, D02 WR80, received by Dublin City Council on 16 Oct 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: PROTECTED STRUCTURE: We, O’Callaghan Collection, intend to apply for permission for development at this site, The Green Hotel at Nos. 1-5 Harcourt Street and Cuffe Street, Dublin 2, D02 WR80. The site includes two Protected Structures (RPS Ref. Nos 3515 & 3516). The proposed development involves internal and external modifications to the existing hotel, including alterations and refurbishment works to the Protected Structures (Nos. 3-4 Harcourt Street), and an extension to the main hotel building on Cuffe Street, to provide 22 additional hotel bedrooms, new and enhanced guest facilities, and ancillary areas, and will consist of: i) Demolition of the existing four-storey atrium block at the corner of Harcourt Street and Cuffe Street to accommodate a new entrance and extended reception area at ground floor level, and extension of the main hotel building at existing first to sixth floor levels to provide 13 additional bedrooms. ii) Construction of a new seventh floor level on the main hotel building at Cuffe Street to provide conference rooms, restaurant, kitchen, storage, welfare facilities, and a rooftop bar with external terrace. iii) Provision of a new setback plant enclosure and sedum roof at seventh floor roof level. iv) A new five-storey atrium at the rear of Nos. 3-4 Harcourt Street to facilitate multi-level circulation routes and enhanced links to No. 5 Harcourt Street and the main hotel building on Cuffe Street. v) Internal alterations to Nos. 3-4 Harcourt Street to provide a residents' lounge at ground floor level, and nine bedrooms at first to third floor levels, together with improvement and repair works to the external and internal building fabric. vi) Removal and reinstatement of Luas related fittings on the Cuffe Street façade of the main hotel building. vii) All associated elevational changes and ancillary site works necessary to facilitate the development. The proposed development will extend the gross floor area of the main hotel building by 1,072.9 sq.m, increasing the overall GFA of the hotel to 7,064.8 sq.m. The council granted permission on 10 Dec 2025. The five-week observation window closed on 20 Nov 2025. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 129 other decided applications in the last five years and 60 appeals.

Appeal window closes 16 Jan 2026 closed 239 days ago
4 weeks from the council's decision (10 Dec 2025) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

PROTECTED STRUCTURE: We, O’Callaghan Collection, intend to apply for permission for development at this site, The Green Hotel at Nos. 1-5 Harcourt Street and Cuffe Street, Dublin 2, D02 WR80. The site includes two Protected Structures (RPS Ref. Nos 3515 & 3516). The proposed development involves internal and external modifications to the existing hotel, including alterations and refurbishment works to the Protected Structures (Nos. 3-4 Harcourt Street), and an extension to the main hotel building on Cuffe Street, to provide 22 additional hotel bedrooms, new and enhanced guest facilities, and ancillary areas, and will consist of: i) Demolition of the existing four-storey atrium block at the corner of Harcourt Street and Cuffe Street to accommodate a new entrance and extended reception area at ground floor level, and extension of the main hotel building at existing first to sixth floor levels to provide 13 additional bedrooms. ii) Construction of a new seventh floor level on the main hotel building at Cuffe Street to provide conference rooms, restaurant, kitchen, storage, welfare facilities, and a rooftop bar with external terrace. iii) Provision of a new setback plant enclosure and sedum roof at seventh floor roof level. iv) A new five-storey atrium at the rear of Nos. 3-4 Harcourt Street to facilitate multi-level circulation routes and enhanced links to No. 5 Harcourt Street and the main hotel building on Cuffe Street. v) Internal alterations to Nos. 3-4 Harcourt Street to provide a residents' lounge at ground floor level, and nine bedrooms at first to third floor levels, together with improvement and repair works to the external and internal building fabric. vi) Removal and reinstatement of Luas related fittings on the Cuffe Street façade of the main hotel building. vii) All associated elevational changes and ancillary site works necessary to facilitate the development. The proposed development will extend the gross floor area of the main hotel building by 1,072.9 sq.m, increasing the overall GFA of the hotel to 7,064.8 sq.m.

Status
Decision Notice Issued
Decision
Grant permission on 10 Dec 2025
Final grant
14 Jan 2026
Site (from polygon)
1,191 m²
Location precision
site (coords_polygon)

Timeline

  • 16 Oct 2025
    New application
    Observation window closed 20 Nov 2025
  • 10 Dec 2025
    Decision
    Appeal window closed 16 Jan 2026

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.33735, -6.26329

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z5 - DEV PLAN 2022-2028

    M2 — Major town centre

    Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

    The main town centre — retail, offices, civic uses, apartments.

    O2 — Green belt

    Z8: Georgian Conservation Areas: To protect the existing architectural and civic design character, and to allow only for limited expansion consistent with the conservation objective.

    Zoned to protect the open land between urban areas. Development is strongly resisted.

    Designations within 250 m

    No OPW flood extent nearby.

    • NIAH-recorded building · 99
      Robert Emmet Memorial; Lord Ardilaun Memorial; fountain
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 27
      Gateway; Church; Cross - Market cross

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 85321). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open