Planning Register
Dublin City Council · WEB5476/25 · Permission

Greenhall Building (The Law Society Diploma Centre D07R81C) and the adjoining shed building to the south, off Benburb Street (D07 AEC5), Dublin 7, Blackhall Place, Dublin 7, D07 R81C

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 22 Oct 2025We first saw it 11 Sept 2026, 18:51 (325 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

WEB5476/25 is a planning application for permission at Greenhall Building (The Law Society Diploma Centre D07R81C) and the adjoining shed building to the south, off Benburb Street (D07 AEC5), Dublin 7, Blackhall Place, Dublin 7, D07 R81C, received by Dublin City Council on 22 Oct 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: PROTECTED STRUCTURE: The Law Society of Ireland intends to apply for permission for development at its site comprising 0.46 Hectares being the Greenhall Building (The Law Society Diploma Centre Eircode D07 R81C), within the curtilage of the former Blue Coat School (protected structure RPS no.765) at Blackhall Place, Dublin 7 D07 VY24 and the adjoining shed building, to the south, off Benburb Street (Eircode D07 AEC5), Dublin 7. The proposed development will comprise: 1. Demolition of the existing single storey print facility building and adjacent lean-to-shed (c.93sqm ) and the removal of the temporary poly tunnel (c.35sqm) located to the west of the Greenhall building. 2. Demolition of the shed building (c.538sqm) off Benburb Street to the south of the Greenhall building. 3. Alteration works to the existing Greenhall building to provide an enlarged flexible teaching space, additional toilets, lecture room, counselling room and connections to the proposed extension. 4. The construction of a single-storey extension to the west end of the Greenhall building to provide a new secondary entrance and a moot court with judge’s chambers (c.93sqm) with SUDS compliant green roof. 5. The construction of an upper floor extension to the west end of the Greenhall building to provide a lecture room, counselling room and accessible WC (c.126 sqm) with SUDS compliant green roof. 6. The construction of a glazed link (c.12sqm) connecting the three-storey extension to the east end of Greenhall building at first-floor level. 7. The construction of a three-storey extension (with local lowering of the ground level by approximately 2.3m) to the south of the Greenhall building to provide 12 tutorial rooms, 2 meeting rooms, a changing-places sanitary facility, with rooftop plant enclosure and roof mounted plant over and roof mounted photovoltaic panels (c.1,134sqm) with SUDS compliant blue roof. 8. The creation of a new entrance plaza to the east of the proposed three storey extension, which involves the removal of a c.11.3m long portion of a boundary wall to create an opening onto the Academic Street to the south of the former Blue Coat School building. The stone removed will be used to build low stone walls around the plaza, topped with metal railings. 9. The replacement of the existing vehicular ramp with a new ramp to provide improved fire tender and delivery access to the rear of Blackhall Place via existing vehicular access from Benburb Street. 10. New gardens and landscaping to the south and west of the building and along the edges of the new vehicular ramp. 11. The construction of cycle parking facilities to the west of the proposed single-storey extension. 12. Upgrading works to the existing tennis court, removal of outdoor gym equipment, hard landscaping and all other repair and refurbishment site development and associated site development works. The council granted permission on 9 Feb 2026. The five-week observation window closed on 26 Nov 2025. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 146 other decided applications in the last five years and 12 appeals.

Appeal window closes 9 Mar 2026 closed 187 days ago
4 weeks from the council's decision (9 Feb 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

PROTECTED STRUCTURE: The Law Society of Ireland intends to apply for permission for development at its site comprising 0.46 Hectares being the Greenhall Building (The Law Society Diploma Centre Eircode D07 R81C), within the curtilage of the former Blue Coat School (protected structure RPS no.765) at Blackhall Place, Dublin 7 D07 VY24 and the adjoining shed building, to the south, off Benburb Street (Eircode D07 AEC5), Dublin 7. The proposed development will comprise: 1. Demolition of the existing single storey print facility building and adjacent lean-to-shed (c.93sqm ) and the removal of the temporary poly tunnel (c.35sqm) located to the west of the Greenhall building. 2. Demolition of the shed building (c.538sqm) off Benburb Street to the south of the Greenhall building. 3. Alteration works to the existing Greenhall building to provide an enlarged flexible teaching space, additional toilets, lecture room, counselling room and connections to the proposed extension. 4. The construction of a single-storey extension to the west end of the Greenhall building to provide a new secondary entrance and a moot court with judge’s chambers (c.93sqm) with SUDS compliant green roof. 5. The construction of an upper floor extension to the west end of the Greenhall building to provide a lecture room, counselling room and accessible WC (c.126 sqm) with SUDS compliant green roof. 6. The construction of a glazed link (c.12sqm) connecting the three-storey extension to the east end of Greenhall building at first-floor level. 7. The construction of a three-storey extension (with local lowering of the ground level by approximately 2.3m) to the south of the Greenhall building to provide 12 tutorial rooms, 2 meeting rooms, a changing-places sanitary facility, with rooftop plant enclosure and roof mounted plant over and roof mounted photovoltaic panels (c.1,134sqm) with SUDS compliant blue roof. 8. The creation of a new entrance plaza to the east of the proposed three storey extension, which involves the removal of a c.11.3m long portion of a boundary wall to create an opening onto the Academic Street to the south of the former Blue Coat School building. The stone removed will be used to build low stone walls around the plaza, topped with metal railings. 9. The replacement of the existing vehicular ramp with a new ramp to provide improved fire tender and delivery access to the rear of Blackhall Place via existing vehicular access from Benburb Street. 10. New gardens and landscaping to the south and west of the building and along the edges of the new vehicular ramp. 11. The construction of cycle parking facilities to the west of the proposed single-storey extension. 12. Upgrading works to the existing tennis court, removal of outdoor gym equipment, hard landscaping and all other repair and refurbishment site development and associated site development works.

Status
Decision Notice Issued
Decision
Grant permission on 9 Feb 2026
Final grant
19 Mar 2026
Site (from polygon)
4,544 m²
Location precision
site (coords_polygon)

Timeline

  • 22 Oct 2025
    New application
    Observation window closed 26 Nov 2025
  • 16 Dec 2025
    Further information requested
  • 14 Jan 2026
    Further information received
  • 9 Feb 2026
    Decision
    Appeal window closed 9 Mar 2026

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.34820, -6.28404

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z9 - DEV PLAN 2022-2028

    G5 — Open space and amenity

    Z9: Amenity/Open Space Lands/Green Network: To preserve, provide and improve recreational amenity, open space and ecosystem services.

    Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

    M2 — Major town centre

    Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

    The main town centre — retail, offices, civic uses, apartments.

    S5 — Sustainable neighbourhood infrastructure

    Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.

    Reserved for the schools, creches, community and health facilities a neighbourhood needs.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • EPA-licensed facility · 4
      Diageo Ireland; Diageo Ireland; Diageo Ireland
    • NIAH-recorded building · 79
      quay/wharf; quay/wharf; Rory O'More Bridge
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 30
      School; Building; Water mill - unclassified

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 87853). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open