PlanningRegister.ie
Dublin City Council · WEB6013/25

Stephen's Green Shopping Centre, St. Stephen's Green, Dublin 2, D02X309

  1. 17 Dec 2025Received
  2. 21 Apr 2026Grant permission
  3. 23 Apr 2026Appealed
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
Status
Under appeal
Decision
Grant permission · 21 Apr 2026
Council
Dublin City Council
Type
Permission
Site
1.36 ha
Appeal
ACP 501223 · pending

What’s proposed

DTDL Limited intend to apply for a 10 year planning permission for development at the Stephen’s Green Shopping Centre, St. Stephen’s Green, Dublin 2, D02 X309. The site is bound by St. Stephen’s Green West to the east, King Street South to the north, Glovers Alley to the south (in part) and Mercer Street Lower to the west, on a site area of c. 1.4 ha. The proposed development will consist of: • The rejuvenation of the Stephen’s Green Shopping Centre, involving the internal reconfiguration and partial redevelopment of the Centre, while maintaining a number of existing retail units and elements of the existing building structure; • The removal of the existing façade at Stephen’s Green Shopping Centre and replacement with new elevational treatments; • The proposal will result in a building of up to 8 no. storeys over basement (excluding mezzanines levels) with a total gross floor area of c. 87,158 sq.m (including multistorey car park); • There is a general increase in height across the development over the existing shopping centre and multistorey car park, which varies across the site. The maximum height increase over the existing multistorey car park (which includes plant screen parapets and when measured from the low point on King Street South), is 11.18 metres (existing 30.59m to a proposed 41.77m). The maximum height increase over the existing shopping centre (excluding the multistorey car park) (which includes plant screen parapets/glazed atrium roof and when measured from the low point on King Street South), is 13.27 metres (existing 25.5m to a proposed 38.77m); • The resulting retail floor area at basement, ground and first floor levels is 19,001 sq.m.; • The resulting café/restaurant/bar uses floor area at basement, ground, first and fourth floor levels is 4,768 sq.m.. The restaurant/bar at fourth floor level will be served by an outdoor terrace (374 sq.m); • Provision of c. 29,251 sq.m. office and ancillary spaces (including existing floor area where retained) at ground, first, second, third, fourth, fifth, sixth and seventh floor levels and associated roof terraces; • Provision of a new townhall (511 sqm) at first floor level; • Provision of a 2-no. screen cinema (714 sqm) at ground and basement level; • Provision of an art exhibition space (447 sqm) at first floor level with associated additional arts display space within the shopping mall and artium; • The overall net increase in GFA over the existing development is c. 20,645 sq.m; • The proposal will include a reconfigured internal mall opening onto St. Stephen’s Green providing access to new and existing retail and café/restaurant units at ground and first floor; • Retail, café/restaurant and bar (public house) units are provided on the King Street South frontage, and on the St. Stephen’s Green West frontage; • The proposed development will include 441 no. bicycle parking spaces and 551 no. car parking spaces (503 spaces to Stephen’s Green Shopping Centre and 48 spaces for RCSI Link). This represents a reduction in 138 no. car parking spaces from the number of spaces at present and; • The proposed development includes all associated works including partial demolition of existing structures, utilities connections, roof level plant and telecommunications infrastructure, PV panels, temporary construction works and site hoarding

WEB6013/25 is a planning application to Dublin City Council for dTDL Limited intend to apply for a 10 year planning permission for development at the, received on 17 Dec 2025; permission was granted on 21 Apr 2026.

Planning details

Reference
WEB6013/25
Local authority
Dublin City Council
Status
Under appeal · register status “Decision Appealed
Received
17 Dec 2025
Observations close
30 Jan 2026 (closed 227 days ago)
Decision due
21 Apr 2026 · decided 21 Apr 2026
Decision
Grant permission on 21 Apr 2026
Proposed development
DTDL Limited intend to apply for a 10 year planning permission for development at the Stephen’s Green Shopping Centre, St. Stephen’s Green, Dublin 2, D02 X309. The site is bound by St. Stephen’s Green West to the east, King Street South to the north, Glovers Alley to the south (in part) and Mercer Street Lower to the west, on a site area of c. 1.4 ha. The proposed development will consist of: • The rejuvenation of the Stephen’s Green Shopping Centre, involving the internal reconfiguration and partial redevelopment of the Centre, while maintaining a number of existing retail units and elements of the existing building structure; • The removal of the existing façade at Stephen’s Green Shopping Centre and replacement with new elevational treatments; • The proposal will result in a building of up to 8 no. storeys over basement (excluding mezzanines levels) with a total gross floor area of c. 87,158 sq.m (including multistorey car park); • There is a general increase in height across the development over the existing shopping centre and multistorey car park, which varies across the site. The maximum height increase over the existing multistorey car park (which includes plant screen parapets and when measured from the low point on King Street South), is 11.18 metres (existing 30.59m to a proposed 41.77m). The maximum height increase over the existing shopping centre (excluding the multistorey car park) (which includes plant screen parapets/glazed atrium roof and when measured from the low point on King Street South), is 13.27 metres (existing 25.5m to a proposed 38.77m); • The resulting retail floor area at basement, ground and first floor levels is 19,001 sq.m.; • The resulting café/restaurant/bar uses floor area at basement, ground, first and fourth floor levels is 4,768 sq.m.. The restaurant/bar at fourth floor level will be served by an outdoor terrace (374 sq.m); • Provision of c. 29,251 sq.m. office and ancillary spaces (including existing floor area where retained) at ground, first, second, third, fourth, fifth, sixth and seventh floor levels and associated roof terraces; • Provision of a new townhall (511 sqm) at first floor level; • Provision of a 2-no. screen cinema (714 sqm) at ground and basement level; • Provision of an art exhibition space (447 sqm) at first floor level with associated additional arts display space within the shopping mall and artium; • The overall net increase in GFA over the existing development is c. 20,645 sq.m; • The proposal will include a reconfigured internal mall opening onto St. Stephen’s Green providing access to new and existing retail and café/restaurant units at ground and first floor; • Retail, café/restaurant and bar (public house) units are provided on the King Street South frontage, and on the St. Stephen’s Green West frontage; • The proposed development will include 441 no. bicycle parking spaces and 551 no. car parking spaces (503 spaces to Stephen’s Green Shopping Centre and 48 spaces for RCSI Link). This represents a reduction in 138 no. car parking spaces from the number of spaces at present and; • The proposed development includes all associated works including partial demolition of existing structures, utilities connections, roof level plant and telecommunications infrastructure, PV panels, temporary construction works and site hoarding
As published by the register.
Site area
1.36 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name

Around this site this application first, then everything within 500 m

Explore from hereFree report
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.33991, -6.26246

Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

ACP 501223 · Planning Appeal · pending
received by the Commission 23 Apr 2026

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    Zone Z5 - DEV PLAN 2022-2028

    M2 — Major town centre

    Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.

    The main town centre — retail, offices, civic uses, apartments.

    Designations within 250 m

    No OPW flood extent nearby.

    • NIAH-recorded building · 256
      shop/retail outlet; house; Davy Byrne's
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 53
      Gatehouse; Religious house - Carmelite friars; House - 17th century

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 86973). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open