15, Palmerston Road (a protected structure), Rathmines, Dublin 6, D06H2C0
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
WEB6087/25 is a planning application for permission at 15, Palmerston Road (a protected structure), Rathmines, Dublin 6, D06H2C0, received by Dublin City Council on 22 Dec 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: PROTECTED STRUCTURE The development will consist of alterations to previously approved Grant of Permission (Reg. Ref. 4173/21) as follows: LOWER GROUND FLOOR: • Relocation of approved kitchen location from rear to front with associated services installations; • New opening in non-original blockwork partition to facilitate kitchen units and infill / relocation of existing door opening within adjacent pantry room; • Alterations to approved partitions / layout within utility / bathroom areas; • Alteration to approved position of External Storage (west) wall and rebuilding of the non-original walls and roof enclosing the entrance lobby all to the front / side; PIANO NOBILE (MAIN ENTRANCE) FLOOR: • Omission of approved w.c. / study and partitions within side extension; • Reinstatement of hall toilet and removal of modern stepped access into side extension and relocation to rear office space gallery; FIRST FLOOR: • Omission of approved family bathroom within side extension; • Omission of approved layout alterations to existing bathroom and omission of approved bedroom / lobby layout; • Omission of approved upper landing alterations to retain existing landing w.c.; • Removal of floor structure, steps and ceiling in bedroom within non-original side extension and reinstatement at higher level to eliminate stepped access; Related alterations to non-original window openings at first floor (front and rear) and joinery to suit new levels; To include all associated conservation works to joinery / plasterwork features throughout, service upgrades to affected works areas, site, landscaping and drainage works. The council granted permission on 24 Feb 2026. The five-week observation window closed on 4 Feb 2026. A commencement notice (CN0147234DC) was lodged on 14 Sept 2026, so works have started on site. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 151 other decided applications in the last five years and 31 appeals.
Proposal
PROTECTED STRUCTURE The development will consist of alterations to previously approved Grant of Permission (Reg. Ref. 4173/21) as follows: LOWER GROUND FLOOR: • Relocation of approved kitchen location from rear to front with associated services installations; • New opening in non-original blockwork partition to facilitate kitchen units and infill / relocation of existing door opening within adjacent pantry room; • Alterations to approved partitions / layout within utility / bathroom areas; • Alteration to approved position of External Storage (west) wall and rebuilding of the non-original walls and roof enclosing the entrance lobby all to the front / side; PIANO NOBILE (MAIN ENTRANCE) FLOOR: • Omission of approved w.c. / study and partitions within side extension; • Reinstatement of hall toilet and removal of modern stepped access into side extension and relocation to rear office space gallery; FIRST FLOOR: • Omission of approved family bathroom within side extension; • Omission of approved layout alterations to existing bathroom and omission of approved bedroom / lobby layout; • Omission of approved upper landing alterations to retain existing landing w.c.; • Removal of floor structure, steps and ceiling in bedroom within non-original side extension and reinstatement at higher level to eliminate stepped access; Related alterations to non-original window openings at first floor (front and rear) and joinery to suit new levels; To include all associated conservation works to joinery / plasterwork features throughout, service upgrades to affected works areas, site, landscaping and drainage works.
- Status
- Decision Notice Issued
- Decision
- Grant permission on 24 Feb 2026
- Final grant
- 31 Mar 2026
- Site (from polygon)
- 958 m²
- Location precision
- site (coords_polygon)
Timeline
- 22 Dec 2025New applicationObservation window closed 4 Feb 2026
- 24 Feb 2026DecisionAppeal window closed 24 Mar 2026

Full planning report for 53.31871, -6.26007
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
- Short commencement notice CN0147234DC
Zoning at the site
Zone Z2 - DEV PLAN 2022-2028
Z2: Residential Neighbourhoods (Conservation Areas): To protect and/or improve the amenities of residential conservation areas.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Z15: Community and Social Infrastructure: To protect and provide for community uses and social infrastructure.
Reserved for the schools, creches, community and health facilities a neighbourhood needs.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 85390). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |