CitiGroup Building, 1 North Wall Quay, Dublin 1, D01T8Y1
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
WEB6103/25 is a planning application for permission at CitiGroup Building, 1 North Wall Quay, Dublin 1, D01T8Y1, received by Dublin City Council on 23 Dec 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: We, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: - Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; - The resulting proposed extended office development ranges in height from 7 no. to 12 no. storeys in height over existing basement comprising office accommodation and a community space; - The development comprises 4 no. blocks ranging in heights of 7-11 no. storeys (Block A), 12 no. storeys (Block B), 10 no. storeys (Block C) and 7 storeys (Block D) which represents a maximum height increase of 6 storeys above the existing building; - The overall gross floor area of the development comprises 61,882 sq.m. (including basement level) including 53,774 sq.m. of office space (39,151 sq.m. of office net internal floor area)and 660 sq.m. of community space; - Office accommodation is proposed at ground floor to 11th floor level; - 1 no. internal community space is provided at ground floor level; - Outdoor terraces are provided at 4th, 5th, 6th 8th, 9th, and 11th floor levels; - Provision of a shared atrium between Block B and Block C; - Green roofs and blue roofs are provided across the scheme; - 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; - 718 no. bicycle spaces and 4 no. motorcycle spaces are proposed at basement level; - 26 no. short-stay bicycle spaces (13 no. Sheffield stands) are proposed at surface level; - The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sqm) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay. - Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; - All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application. The council granted permission on 5 Jun 2026. The five-week observation window closed on 5 Feb 2026. Appeal 501651 is before An Coimisiún Pleanála (lodged 2 Jul 2026). The site is zoned null under the Dublin City Council development plan. Within 500 m there are 134 other decided applications in the last five years and 10 appeals.
Proposal
We, NWQ Devco Limited, intend to apply for a 10 year planning permission for development at a site consisting of the CitiGroup Building, 1 North Wall Quay, Dublin 1, D01 T8Y1. The site is bound by North Wall Quay to the south, Commons Street to the west, Clarion Quay/Alderman Way to the north and an access ramp to the existing basement to the east. The site area is c. 0.88 ha. The proposed development will consist of: - Partial demolition, removal of existing facades and extension of existing 5-6 storeys office building; - The resulting proposed extended office development ranges in height from 7 no. to 12 no. storeys in height over existing basement comprising office accommodation and a community space; - The development comprises 4 no. blocks ranging in heights of 7-11 no. storeys (Block A), 12 no. storeys (Block B), 10 no. storeys (Block C) and 7 storeys (Block D) which represents a maximum height increase of 6 storeys above the existing building; - The overall gross floor area of the development comprises 61,882 sq.m. (including basement level) including 53,774 sq.m. of office space (39,151 sq.m. of office net internal floor area)and 660 sq.m. of community space; - Office accommodation is proposed at ground floor to 11th floor level; - 1 no. internal community space is provided at ground floor level; - Outdoor terraces are provided at 4th, 5th, 6th 8th, 9th, and 11th floor levels; - Provision of a shared atrium between Block B and Block C; - Green roofs and blue roofs are provided across the scheme; - 32 no. car parking spaces will be provided at basement level to serve the development. This represents a reduction of 132 no. car parking spaces in comparison to the existing office building on the site; - 718 no. bicycle spaces and 4 no. motorcycle spaces are proposed at basement level; - 26 no. short-stay bicycle spaces (13 no. Sheffield stands) are proposed at surface level; - The development includes the fill and cover of existing access ramp to existing basement to provide a landscaped community pocket park (244 sqm) to the east of the building. The park will include a pedestrian link from North Wall Quay to Clarion Quay. - Provision of upgrades to existing public realm within application site including public footpaths along North Wall Quay, Commons Street and Clarion Quay; - All ancillary and associated works to facilitate the development including plant, pv panels, switch rooms, generators, water tanks, sprinkler plant, ESB substations, landscaping, telecommunications infrastructure and utilities connections and infrastructure. An Environmental Impact Assessment Report and Natura Impact Statement have been prepared in respect of the proposed development and have been submitted with the planning application.
- Status
- Decision Appealed
- Decision
- Grant permission on 5 Jun 2026
- Site (from polygon)
- 8,873 m²
- Location precision
- site (coords_polygon)
Timeline
- 23 Dec 2025New applicationObservation window closed 5 Feb 2026
- 25 Feb 2026Further information requested
- 13 May 2026Further information received
- 5 Jun 2026DecisionAppeal window closed 3 Jul 2026
- 3 Jul 2026Appeal lodged

Full planning report for 53.34829, -6.24508
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Commencement
No commencement notice matched to this reference.
Zoning at the site
Zone Z5 - DEV PLAN 2022-2028
Z5: City Centre: To consolidate and facilitate the development of the central area, and to identify, reinforce, strengthen and protect its civic design character and dignity.
The main town centre — retail, offices, civic uses, apartments.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- Natural Heritage Area (incl. proposed) · 1
- NIAH-recorded building · 22
- Radon risk area · 1
- Recorded monument · 3
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 88260). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |