Site at MTL Terminal, Dublin Port, Sean Moore Road and Pigeon House Road, Ringsend, Dublin 4
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
WEBPWSDZ1792/25 is a planning application for permission at Site at MTL Terminal, Dublin Port, Sean Moore Road and Pigeon House Road, Ringsend, Dublin 4, received by Dublin City Council on 10 Apr 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: Marine Terminals Ltd intends to apply for permission for development at MTL Terminal, Dublin Port, Sean Moore Road and Pigeon House Road, Ringsend, Dublin 4. This site is located within the Poolbeg West Strategic Development Zone (SDZ). The development will consist of: (i) construction of a low-voltage information technology (IT) switchboard kiosk (c. 7.8sq.m; c. 2.4m in height) over a reinforced concrete slab (c. 4.2m x c. 3.5m; c. 0.2m in height); (ii) construction of a steel lattice frame telemetry tower (c. 6m in height) over a reinforced concrete slab (c. 2m x 2m; c. 0.2m in height above ground); (iii) demolition and removal of existing temporary ancillary office building (c. 480sq.m; c. 7.2m in height) and area resurfaced; and; (iv) all ancillary site development works, including duct connections. The council granted permission on 4 Jun 2025. The five-week observation window closed on 15 May 2025. The site is zoned null under the Dublin City Council development plan. Within 500 m there are 52 other decided applications in the last five years and 5 appeals.
Proposal
Marine Terminals Ltd intends to apply for permission for development at MTL Terminal, Dublin Port, Sean Moore Road and Pigeon House Road, Ringsend, Dublin 4. This site is located within the Poolbeg West Strategic Development Zone (SDZ). The development will consist of: (i) construction of a low-voltage information technology (IT) switchboard kiosk (c. 7.8sq.m; c. 2.4m in height) over a reinforced concrete slab (c. 4.2m x c. 3.5m; c. 0.2m in height); (ii) construction of a steel lattice frame telemetry tower (c. 6m in height) over a reinforced concrete slab (c. 2m x 2m; c. 0.2m in height above ground); (iii) demolition and removal of existing temporary ancillary office building (c. 480sq.m; c. 7.2m in height) and area resurfaced; and; (iv) all ancillary site development works, including duct connections.
- Status
- Decision Notice Issued
- Decision
- Grant permission on 4 Jun 2025
- Final grant
- 4 Jun 2025
- Site (from polygon)
- 673 m²
- Location precision
- site (coords_polygon)
Timeline
- 10 Apr 2025New applicationObservation window closed 15 May 2025
- 4 Jun 2025DecisionAppeal window closed 2 Jul 2025

Full planning report for 53.34190, -6.21122
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
Poolbeg SDZ (ZD03)
Z14: Strategic Development and Regeneration Areas (SDRAs): To seek the social, economic and physical development and/or regeneration of an area with mixed-use, of which residential would be the predominant use.
A small rural settlement where only modest infill serving local need is envisaged.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 83292). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |