Approved in Apr 2025. Building started in 2026.

  1. 23 Jan 2025Received
  2. 13 Mar 2025Approved
  3. 16 Apr 2025Final approval
  4. 2 Mar 2026Building started
Status
Building startedi
Decision
Approved · 13 Mar 2025
Council
Dún Laoghaire-Rathdown County Council
Type
Permission
Site
393 m²

What’s proposed

In plain English

Extensions and alterations to a house on Eden Road Upper

The applicant wants to build ground and two-storey extensions to the side and rear of the house. This includes demolishing parts of the existing garage and house walls.

  • Demolishes part of the existing garage
  • Removes sections of the side and back walls on the first floor
  • Redesigns the main roof over the new first floor extension
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

Demolition of the rear of the garage and part of the side and back walls on the…

Cut short by the council feed. Full text ↗

Planning details

Reference
D25B/0032
Local authority
Dún Laoghaire-Rathdown County Council
Status
Commenced · register status “Final Grant”
Received
23 Jan 2025
Decision due
19 Mar 2025 · decided 13 Mar 2025
Decision
Grant permission on 13 Mar 2025
Site area
393 m² from the mapped boundary, not the council's figure

Live near 20 Eden Road Upper?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What could you build here?Opens pre-filled with “two-storey rear and side extension” — how the same work went for the houses around here.

Nearby 66 · 500 m · 12 months

Distance
Time
Show all 66

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 2 Mar 2026 · Builder told the council work was starting (opted out of the finish sign-off) CN0138406DR

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

R2.6 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • Architectural Conservation Area · 4
    Clarinda Park; Croswaite Park
  • Record of Protected Structures · 62
    House Terrace

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 15:18.

Source: National Planning Application Database · fetched 11 Sept 2026, 15:18
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 15:18open
Summary

D25B/0032 is a planning application to Dún Laoghaire-Rathdown County Council for demolition of the rear of the garage and part of the side and back walls on the, received on 23 Jan 2025; permission was granted on 13 Mar 2025.