BEHY, CASHELARD, TULLYHORKY AND DOOBALLY
Decided on appeal.
- 15 Nov 2018Received
- 18 Jul 2019Refused
- Status
- Appeal decided — refused
- Decision
- Refused · 18 Jul 2019
- Council
- Donegal County Council
- Type
- PERMISSION
- Site
- 112.39 ha
What’s proposed
A TEN-YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30-YEAR OPERATIONAL LIFE (FROM THE DATE OF COMMISSIONING) CONSISTING OF (A) UP TO 7 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 150 METRES AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS, (B) 1 NO. ON-SITE ELECTRICAL SUB-STATION, (C) 1 NO. TEMPORARY CONSTRUCTION COMPOUND, (D) 1 NO. ANEMOMETRY MAST WITH A HEIGHT OF UP TO 100 METRES, (E) RECREATIONAL AMENITY TRAIL AND ASSOCIATED SIGNAGE, PARKING AND RECREATIONAL FACILITIES, (F) ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE SUBSTATION, (G) UPGRADING OF EXISTING ACCESS TRACKS AND PROVISION OF ANY NEW SITE ACCESS ROADS REQUIRED INCLUDING NEW SITE ACCESS ONTO THE LOCAL ROAD NETWORK IN THE TOWNLAND OF TULLYHORKY AND ASSOCIATED DRAINAGE, (H) EXCAVATION OF 1 NO. BORROW PIT AND (I) ALL ASSOCIATED SITE DEVELOPMENT WORKS (INCLUDING TREE FEELING). AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTED
Planning details
- Reference
- 1851741
- Local authority
- Donegal County Council
- Status
- Appeal decided — refused · register status “APPLICATION FINALISED”
- Received
- 15 Nov 2018
- Observations close
- 20 Dec 2018 (closed 2849 days ago)
- Decision due
- 2 Jul 2019 · decided 18 Jul 2019
- Decision
- Refused on 18 Jul 2019
- Proposed development
- A TEN-YEAR PLANNING PERMISSION FOR A WIND FARM WITH A 30-YEAR OPERATIONAL LIFE (FROM THE DATE OF COMMISSIONING) CONSISTING OF (A) UP TO 7 NO. WIND TURBINES WITH A TIP HEIGHT OF UP TO 150 METRES AND ALL ASSOCIATED FOUNDATIONS AND HARDSTANDING AREAS, (B) 1 NO. ON-SITE ELECTRICAL SUB-STATION, (C) 1 NO. TEMPORARY CONSTRUCTION COMPOUND, (D) 1 NO. ANEMOMETRY MAST WITH A HEIGHT OF UP TO 100 METRES, (E) RECREATIONAL AMENITY TRAIL AND ASSOCIATED SIGNAGE, PARKING AND RECREATIONAL FACILITIES, (F) ALL ASSOCIATED UNDERGROUND ELECTRICAL AND COMMUNICATIONS CABLING CONNECTING THE TURBINES TO THE PROPOSED ON-SITE SUBSTATION, (G) UPGRADING OF EXISTING ACCESS TRACKS AND PROVISION OF ANY NEW SITE ACCESS ROADS REQUIRED INCLUDING NEW SITE ACCESS ONTO THE LOCAL ROAD NETWORK IN THE TOWNLAND OF TULLYHORKY AND ASSOCIATED DRAINAGE, (H) EXCAVATION OF 1 NO. BORROW PIT AND (I) ALL ASSOCIATED SITE DEVELOPMENT WORKS (INCLUDING TREE FEELING). AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTEDAs published by the register.
- Site area
- 112.39 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby none · 500 m · 5 years
No other application within 500 m in the last 5 years.
Appeal
Appeal ABP-305163-19 (status unknown), not yet matched.
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
- NIAH-recorded building · 1
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
1851741 is a planning application to Donegal County Council for a ten-year planning permission for a wind farm with a 30-year operational life (from the, received on 15 Nov 2018; permission was refused on 18 Jul 2019.