Donegal County Council · 2050291

Shannagh, Kilcar, Donegal PO

Refused in Jun 2020.

  1. 10 Mar 2020Received
  2. 25 Jun 2020Refused
Status
Refused
Decision
Refused · 25 Jun 2020
Council
Donegal County Council
Type
PERMISSION
Site
5.67 ha

Live near Shannagh?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

FOR A PERIOD OF TEN YEARS FOR THE ADDITION OF TWO WIND TURBINES TO THE EXISTING THREE TURBINE WINDFARM. THE DEVELOPMENT WILL CONSIST OF THE FOLLOWING: CONSTRUCTION OF (1) TWO WIND TURBINES WITH HUB HEIGHTS OF UP TO 55 METRES AND AN OVERALL HEIGHT OF UP TO 77 METRES TO BLADE TIP; (2) TWO CRANE HARDSTAND AREAS LOCATED BESIDE EACH TURBINE; (3) ONE 20 KV SUBSTATION BUILDING WITH ASSOCIATED ELECTRICAL PLANT AND EQUIPMENT (4) INTERNAL WINDFARM UNDERGROUND CABLING AND NEW SITE ACCESS TRACK AND INSTALLATION OF (1) A DRAINAGE SYSTEM FOR THE PROPOSED HARDSTANDS AND ROAD ACCESS (2) UNDERGROUND GRID CONNECTION OF APPROXIMATELY 910M IN LENGTH, PREDOMINANTELY ALONG THE EXISTING WINDFARM ACCESS ROAD NETWORK AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS

Planning details

Reference
2050291
Local authority
Donegal County Council
Status
Refused · register status “APPLICATION FINALISED”
Received
10 Mar 2020
Observations close
14 Apr 2020 (closed 2379 days ago)
Decision due
4 May 2020 · decided 25 Jun 2020
Decision
Refused on 25 Jun 2020
Site area
5.67 ha from the mapped boundary, not the council's figure

Nearby none · 500 m · 5 years

No other application within 500 m in the last 5 years.

Explore this area on the map →

Not held yet for Donegal County Council: zoning.

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2050291 is a planning application to Donegal County Council for for a period of ten years for the addition of two wind turbines to the existing three, received on 10 Mar 2020; permission was refused on 25 Jun 2020.