PlanningRegister.ie
Donegal County Council · 2152595

Assaroe Road/West Port, Carrickboy, Ballyshannon

Approved in Jun 2022. Building started.

  1. 22 Dec 2021Received
  2. 10 Jun 2022Conditional
  3. 20 Jul 2022Final approval
  4. 2 Dec 2024Building started
  5. 19 Jul 2027Approval runs out

Earlier approval here ran out with no sign of building: 1951687 (2020)

Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Building started
Decision
Conditional · 10 Jun 2022
Council
Donegal County Council
Type
RETENTION
Site
2,432 m²

Live near Assaroe Road/West Port?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

(1) DEMOLITION OF OLD CINEMA BUILDING WITH A REPLACEMENT CAR PARK (2) CHANGE OF USE FROM OFFICE SPACE TO STORE AT FIRST FLOOR OF EXISTING BUILDING (3) MODIFICATIONS TO FENESTRATION INCLUDING ADDITIONAL, REPOSITIONING AND REMOVAL AND PERMISSION FOR (1) DEMOLITION OF EXISTING GLAZED STRUCTURE TO FRONT OF EXISTING BUILDING TO FACILITATE EXTENSIONS TO FRONT AND SIDE OF EXISTING GROUND FLOOR RETAIL UNIT TO ACCOMMODATE ADDITIONAL RETAIL FLOOR SPACE, NEW ENTRANCE LOBBY FROM ADJOINING CAR PARK, STAIRWELL, PASSENGER LIFT SHAFT, FIRE ESCAPE STAIRWELL AND GOODS LIFT SHAFT (2) CONSTRUCTION OF AN EXTENSION TO FRONT AND SIDE AT FIRST FLOOR LEVEL TO ACCOMMODATE RETAIL UNIT AND ADDITIONAL STORAGE SPACE (3) CHANGE OF USE FROM STORE TO OFFICE UNIT AT FIRST FLOOR LEVEL (4) CONSTRUCTION OF ATTACHED BUILDING TO ACCOMMODATE 4NO. STORAGE UNITS FOR ANCILLARY STORAGE RELATED TO RETAIL OPERATIONS AT GROUND FLOOR AND OFFICE UNIT AT FIRST FLOOR ACCESSED FROM WEST PORT ROAD (5) REMOVAL OF 2NO. FUEL PUMP FROM EXISTING FORECOURT AND CONSTRUCTION OF IN NEW LOCATION OF 1NO. REPLACEMENT FUEL PUMPs, DISPENSING PETROL & DIESEL ON BOTH SIDES (6) EXTENSION OF EXISTING CANOPY OVER FORECOURT TO COVER PROPOSED NEW REPLACEMENT FUEL PUMP (7) DECOMMISSIONING OF 2NO. EXISTING UNDERGROUND FUEL STORAGE TANKS AND CONSTRUCTION IN NEW LOCATION OF 1NO. REPLACEMENT UNDERGROUND FUEL STORAGE TANK AND ALL ASSOCIATED SITE WORKS

Planning details

Reference
2152595
Local authority
Donegal County Council
Status
Commenced · register status “APPLICATION FINALISED”
Received
22 Dec 2021
Observations close
4 Feb 2022 (closed 1713 days ago)
Decision due
13 Jun 2022 · decided 10 Jun 2022
Decision
Conditional on 10 Jun 2022
Site area
2,432 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 46 · 500 m · 5 years

Show all 46

Explore this area on the map →

Homes nearby

Building started

  • 2 Dec 2024 · Builder told the council work was starting (seven-day notice) SN0011609DL

Zoning

Not zoned in the current plan.

Protections nearby 250 m

No mapped flood area nearby.

  • NIAH-recorded building · 28
    house; The Market House
  • Recorded monument · 4
    Historic town; Castle - unclassified

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: npad · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
npadCC-BY-4.018 Sept 2026, 15:44open
Summary

2152595 is a planning application to Donegal County Council for (1) demolition of old cinema building with a replacement car park (2) change of use from, received on 22 Dec 2021; permission was granted with conditions on 10 Jun 2022.