MEENDERRYGAMPH , GWEEDORE , CO. DONEGAL
- 11 May 2022Received
- 14 Apr 2023Conditional
- 17 May 2023Final grant
- Status
- Granted with conditions
- Decision
- Conditional · 14 Apr 2023
- Council
- Donegal County Council
- Type
- PERMISSION
- Site
- 30.70 ha
What’s proposed
(1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT WITH 3 NO. 4.5 MEGAWATT TURBINES HAVING AN OVERALL MAXIMUM HEIGHT OF 150M CONSISTING OF A BLADE DIAMETER OF 136M AND A HUB HEIGHT OF 82M. THE DEVELOPMENT WILL ALSO CONSIST OF THE ASSOCIATED TURBINE HARDSTANDS AND FOUNDATIONS, UPGRADING OF C.910M OF EXISTING SITE ACCESS TRACK, PROVISION OF C.799M OF NEW SITE ACCESS TRACK, CONSTRUCTION OF A NEW 38KV SUBSTATION AND 2 NO. JOINT BAYS, DEVELOPMENT OF A NEW BORROW PIT, TEMPORARY CONSTRUCTION COMPOUND, SITE DRAINAGE NETWORK, THE REMOVAL AND RESTORATION OF C.600M OF EXISTING SITE TRACK, INTERNAL WIND FARM UNDERGROUND POWER AND COMMUNICATIONS CABLING, CONNECTION TO THE NATIONAL ELECTRICITY NETWORK BY JOINING TO EXISTING GRID CONNECTIONS PRIOR TO LEAVING THE SITE AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THIS APPLICATION IS SEEKING A TEN YEAR PERMISSION AND A 40 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING OF THE WIND FARM. THIS APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ACCESSMENT REPORT (EIAR) & A NATURA IMPACT STATEMENT (NIS)
2250813 is a planning application to Donegal County Council for (1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT, received on 11 May 2022; permission was granted with conditions on 14 Apr 2023.
Planning details
- Reference
- 2250813
- Local authority
- Donegal County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 11 May 2022
- Observations close
- 15 Jun 2022 (closed 1557 days ago)
- Decision due
- 18 Apr 2023 · decided 14 Apr 2023
- Decision
- Conditional on 14 Apr 2023
- Proposed development
- (1) REMOVAL OF THE EXISTING 8 NO. 600 AND 660 KILOWATT (KW) TURBINES AND REPLACEMENT WITH 3 NO. 4.5 MEGAWATT TURBINES HAVING AN OVERALL MAXIMUM HEIGHT OF 150M CONSISTING OF A BLADE DIAMETER OF 136M AND A HUB HEIGHT OF 82M. THE DEVELOPMENT WILL ALSO CONSIST OF THE ASSOCIATED TURBINE HARDSTANDS AND FOUNDATIONS, UPGRADING OF C.910M OF EXISTING SITE ACCESS TRACK, PROVISION OF C.799M OF NEW SITE ACCESS TRACK, CONSTRUCTION OF A NEW 38KV SUBSTATION AND 2 NO. JOINT BAYS, DEVELOPMENT OF A NEW BORROW PIT, TEMPORARY CONSTRUCTION COMPOUND, SITE DRAINAGE NETWORK, THE REMOVAL AND RESTORATION OF C.600M OF EXISTING SITE TRACK, INTERNAL WIND FARM UNDERGROUND POWER AND COMMUNICATIONS CABLING, CONNECTION TO THE NATIONAL ELECTRICITY NETWORK BY JOINING TO EXISTING GRID CONNECTIONS PRIOR TO LEAVING THE SITE AND ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. THIS APPLICATION IS SEEKING A TEN YEAR PERMISSION AND A 40 YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING OF THE WIND FARM. THIS APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ACCESSMENT REPORT (EIAR) & A NATURA IMPACT STATEMENT (NIS)As published by the register.
- Site area
- 30.70 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby nothing else within 500 m in the last 5 years
No other application within 500 m in the last 5 years.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 335425). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2250813/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |