MASSLOUGHDERRYDUFF LACKAGHATERMON, ARDARA, DONEGAL PO
Decided on appeal.
- 19 Aug 2022Received
- 13 Oct 2022Refused
- 17 Sept 2028Approval runs out
- Status
- Appeal decided — granted
- Decision
- Refused · 13 Oct 2022
- Council
- Donegal County Council
- Type
- PERMISSION
- Site
- 25.56 ha
Live near MASSLOUGHDERRYDUFF LACKAGHATERMON?
Everything else planned on your street, in one report.
Check my streetWhat’s proposed
A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT WILL CONSISTS OF (1) CONSTRUCTION OF 3 WIND TURBINE GENERATORS AND ASSOCIATED HARDSTANDS AREAS WITHIN THE FOLLOWING PARAMETERS (A) A TOTAL TIP HEIGHT IN THE RANGE OF 145 METRES MINIMUM TO 150 METRES MAXIMUM (B) HUB HEIGHT IN THE RANGE OF 82 METRES MINIMUM TO 87 METRES MAXIMUM (C) ROTOR DIAMETER IN THE RANGE OF 121 METRES MINIMUM TO 126 METRES MAXIMUM (2) UPGRADING OF EXISTING SITE ACCESS TRACKS AND ROADS AND PROVISION OF NEW SITE ACCESS TRACK AND ROADS (3) WIDENING OF 3 NO. EXISTING SITE ENTRANCES AND PROVISION OF A NEW SITE ENTRANCE (4) WIDENING OF 4 NO. BENDS AND 1 NO. JUNCTION ALONG THE PUBLIC ROAD L2563 (5) CONSTRUCTION OF (A) A CONTROL BUILDING / SUBSTATION WITH A FENCED COMPOUND PREVIOUSLY PERMITTED UNDER PLANNING REFERENCE 14/50553 AND EXTENDED UNDER PLANNING APPLICATION REFERENCE 19/51227 (B) A NEW TEMPORARY SITE COMPOUND FOR USE DURING CONSTRUCTION (6) SITE DRAINAGE NETWORK (7) INSTALLATION OF INTERNAL WIND FARM UNDERGROUND POWER AND COMMUNICATIONS CABLING (7) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. A ENVIRONMENTAL IMPACT ACCESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT ACCOMPANY THIS APPLICATION
Planning details
- Reference
- 2251393
- Local authority
- Donegal County Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 19 Aug 2022
- Observations close
- 23 Sept 2022 (closed 1471 days ago)
- Decision due
- 13 Oct 2022 · decided 13 Oct 2022
- Decision
- Refused on 13 Oct 2022
- Proposed development
- A TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR OPERATIONAL LIFE FROM THE DATE OF COMMISSIONING. THE DEVELOPMENT WILL CONSISTS OF (1) CONSTRUCTION OF 3 WIND TURBINE GENERATORS AND ASSOCIATED HARDSTANDS AREAS WITHIN THE FOLLOWING PARAMETERS (A) A TOTAL TIP HEIGHT IN THE RANGE OF 145 METRES MINIMUM TO 150 METRES MAXIMUM (B) HUB HEIGHT IN THE RANGE OF 82 METRES MINIMUM TO 87 METRES MAXIMUM (C) ROTOR DIAMETER IN THE RANGE OF 121 METRES MINIMUM TO 126 METRES MAXIMUM (2) UPGRADING OF EXISTING SITE ACCESS TRACKS AND ROADS AND PROVISION OF NEW SITE ACCESS TRACK AND ROADS (3) WIDENING OF 3 NO. EXISTING SITE ENTRANCES AND PROVISION OF A NEW SITE ENTRANCE (4) WIDENING OF 4 NO. BENDS AND 1 NO. JUNCTION ALONG THE PUBLIC ROAD L2563 (5) CONSTRUCTION OF (A) A CONTROL BUILDING / SUBSTATION WITH A FENCED COMPOUND PREVIOUSLY PERMITTED UNDER PLANNING REFERENCE 14/50553 AND EXTENDED UNDER PLANNING APPLICATION REFERENCE 19/51227 (B) A NEW TEMPORARY SITE COMPOUND FOR USE DURING CONSTRUCTION (6) SITE DRAINAGE NETWORK (7) INSTALLATION OF INTERNAL WIND FARM UNDERGROUND POWER AND COMMUNICATIONS CABLING (7) ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKS. A ENVIRONMENTAL IMPACT ACCESSMENT REPORT (EIAR) AND NATURA IMPACT STATEMENT ACCOMPANY THIS APPLICATIONAs published by the register.
- Site area
- 25.56 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby none · 500 m · 5 years
No other application within 500 m in the last 5 years.
Appeal
Appeal ABP-315071-22 (status unknown), not yet matched.
Zoning
Not zoned in the current plan.
Protections nearby 250 m
No mapped flood area nearby.
Nothing else protected nearby.
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |
Summary
2251393 is a planning application to Donegal County Council for a TEN YEAR PLANNING PERMISSION FOR A RENEWABLE ENERGY DEVELOPMENT WITH A 40-YEAR, received on 19 Aug 2022; permission was refused on 13 Oct 2022.