PlanningRegister.ie
Donegal County Council · 2352004

Donegal Hospice Clg, Knocknamona, Letterkenny

Approved in Mar 2024. No sign of building yet.

  1. 21 Dec 2023Received
  2. 22 Feb 2024Conditional
  3. 27 Mar 2024Final approval
  4. 26 Mar 2029Approval runs out
Status
Approved
Decision
Conditional · 22 Feb 2024
Council
Donegal County Council
Type
PERMISSION
Site
1.91 ha

What’s proposed

(1) REMOVAL OF TREES, TO THE SOUTH & EAST OF THE EXISTING HOSPICE BUILDING TOGETHER WITH THE REMOVAL OF 2NO. PRESSED STEEL CONTAINERS, A PREFABRICATED STORE AND A COMPOUND CONTAINING OIL & GAS STORAGE AND THE GENERATOR, (2) CONSTRUCTION OF A DORMER STYLE EXTENSION COMPRISING OF 5 NO. SINGLE BEDROOM APARTMENTS, TV/DAYROOM AND BREAKOUT SPACE WITH STORAGE & WC, SECOND PERSONEL ENTRANCE ON GROUND FLOOR WITH CONFERENCE ROOM AND STORAGE AT FIRST FLOOR TOGETHER WITH ALL ANCILLARY FACILITIES, (3) REMODELING OF THE EXISTING INTERNAL HOSPICE FACILITIES; INTER ALIA: (A) RECONFIGURATION OF EXISTING MAIN ENTRANCE WITH A NEW EXTERNAL LOBBY AND CANOPY, (B) REMODELING THE INTERNAL ARRANGEMENTS WITHIN THE EXISTING BEDROOMS INCLUDING EXTENDING THE EXISTING ENSUITE FACILITIES SERVING EACH ROOM TO FORM BOX PROJECTIONS ACCOMMODATING THE INCREASED ENSUITE FOOTPRINTS, (C) CONVERSION OF EXISTING 4 NO. RESIDENTIAL BEDROOMS INTO RESPITE CARE, (D) EXTENDING THE STAFF DINING FACILITIES, (E) REARRANGING OF STORE ROOMS INTO THE KITCHEN UTILITY AREA WITH ANCILLARY STAFF FACILITIES, (F) CONVERSION & EXTENSION OF EXISTING ANCILLARY ACCOMMODATION TO FORM NEW ALLIED HEALTH PROFESSIONALS ROOM, (G) UPGRADING THE STAFF CHANGING ROOMS, DAY ROOMS & WC’S THROUGHOUT THE BUILDING, RELOCATING THE NURSE’S STATION AND SUPPORT FACILITIES, RE-MODELING THE ADMINISTRATION AND OCCUPATION THERAPY DEPARTMENTS AND (H) INCLUDING ALL ALTERATIONS TO THE EXISTING EXTERNAL WINDOWS AND DOORS ASSOCIATED WITH THE ABOVE INTERNAL WORKS, (4) EXTERNALLY INSULATE AND RE-RENDER THE EXISTING BUILDING REPLACING ALL EXISTING WINDOWS AND EXTERNAL DOORS, REMOVAL OF CHIMNEYS AND SMALL RAISED GABLE BARGES THROUGHOUT, (5) REMOVAL OF REDUNDANT FREESTANDING ENCLOSED BRICK BOILER HOUSE AND FORMATION OF AN ENLARGED OPEN BIN COMPOUND IN THE REAR COURTYARD AREA, (6) NEW ENERGY COMPOUND TO THE NORTH OF THE SITE ACCOMMODATING A BIOMASS BOILER, BACK UP HEATING AND RELOCATED GENERATOR AND SUPPORT FACILITIES AND THE REPOSITIONED GAS COMPOUND AND ASSOCIATED SECURITY FENCING, (G) RECONFIGURING OF EXISTING SITE LAYOUT TO INCLUDE FOR THE FOLLOWING: (A) OMISSION OF 13 NO. EXISTING PARKING SPACES AND ADDITION OF 25 NO. NEW PARKING SPACES, (B) REMODELING AND EXTENSION OF THE SITE ACCESS ROAD TO SERVE THE NEW AND EXISTING CARPARKING SPACES AND THE NEW ENERGY COMPOUND, (C) EXTENSION OF THE PERIMETER FOOTPATH TO ACCOMMODATE THE PROPOSED EXTENSION, (D) ALTERATIONS INCLUDING WORKS TO THE EXISTING HARD AND SOFT LANDSCAPING OUTSIDE THE EXISTING BEDROOMS

Planning details

Reference
2352004
Local authority
Donegal County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
21 Dec 2023
Decision due
23 Feb 2024 · decided 22 Feb 2024
Decision
Conditional on 22 Feb 2024
Site area
1.91 ha from the mapped boundary, not the council's figure

Live near Donegal Hospice Clg?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

Nearby 4 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Not held yet for Donegal County Council: zoning.

Protections nearby 250 m

  • NIAH-recorded building · 1
    St. Conal's Psychiatric Hospital

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2352004 is a planning application to Donegal County Council for (1) removal of trees, to the south & east of the existing hospice building together with, received on 21 Dec 2023; permission was granted with conditions on 22 Feb 2024.