ÓStÁN Ghaoth Dobhair, BÓThar na TrÁ, an Bun Beag
Approved in Nov 2024. No sign of building yet.
Start notices are matched from the national building control register; a start on site can be missed.
- 8 Feb 2024Received
- 30 Sept 2024Conditional
- 6 Nov 2024Final approval
- 5 Nov 2029Approval runs out
Planning details
- Status
- Approved
- Decision
- Conditional · 30 Sept 2024
- Reference
- 2460121
- Received
- 8 Feb 2024
- Further information
- Requested 28 Mar 2024 · received 3 Sept 2024
- Site
- 4.05 ha
What’s proposed
REFURBISHMENTS, ALTERATIONS & EXTENSIONS OF EXISTING PART TWO-STOREY / PART THREE STOREY HOTEL BUILDING CONSISTING OF: (1) DEMOLITION OF EXISTING STAIRCORE (46.5 SQ/M) ON THE EAST ELEVATION AND REPLACEMENT WITH NEW STAIRCORE (198 SQ/M) FROM LOWER GROUND FLOOR LEVEL TO THE PROPOSED NEW SECOND FLOOR LEVEL WITH NEW PLANT ROOM AT LOWER GROUND FLOOR LEVEL AND NEW HOUSEKEEPING/STORAGE ROOMS AT GROUND, FIRST AND SECOND…
Show all
FLOOR LEVELS, (2) REFURBISHMENT OF EXISTING PART TWO STOREY, PART THREE STOREY CONCRETE STRUCTURE, (3) ALTERATIONS TO INTERNAL LAYOUTS AT EXISTING LOWER GROUND FLOOR, GROUND FLOOR AND FIRST FLOOR LEVELS (3,003 SQ/M) PROVIDING NEW RECEPTION/ADMINISTRATION AREA, BAR/RESTAURANT, CUSTOMER TOILET/KITCHEN/STAFF FACILITIES/PLANT AND 69 GUEST BEDROOMS, (4) PROPOSED NEW ADDITIONAL SECOND FLOOR (1,337 SQ/M) ABOVE EXISTING BUILDING INCORPORATING NEW FULLY SERVICED WEDDING VENUE/FUNCTION ROOM, BAR/RESTAURANT PLUS OUTDOOR TERRACE AREA, (5) PROPOSED NEW THREE STOREY EXTENSION (2,029 SQ/M) ATTACHED TO THE NORTH EAST OF THE EXISTING BUILDING TO PROVIDE 11 NEW GUEST BEDROOMS (80 IN TOTAL) AND 15 NO. NEW TWO BEDROOM APARTMENTS, (6) PROPOSED NEW PART SINGLE STOREY, PART FOUR STOREY EXTENSION (266 SQ/M) TO THE SOUTH ELEVATION OF THE EXISTING BUILDING TO PROVIDE EXTENDED KITCHEN FACILITIES, NEW LIFTS, STAIRCORE AND EXTERNAL TERRACE AREAS, (7) PROPOSED EXTENSIONS TO NORTH AND SOUTH ELEVATIONS OF THE EXISTING BUILDING TO PROVIDE FOR REVISED ELEVATIONAL TREATMENT AND EXTERNAL BALCONIES AT GROUND AND FIRST FLOOR LEVELS, (8) ALTERATIONS AND REFURBISHMENT OF EXISTING HEALTH AND BEAUTY SPA (632 SQ/M) ATTACHED TO THE WEST OF THE HOTEL BUILDING, (9) REPLACEMENT OF EXISTING ONSITE WASTEWATER TREATMENT FACILITIES AND PERCOLATION AREAS WITH NEW ONSITE WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREAS, (10) REFURBISHMENT OF EXISTING CAR PARKING FACILITIES AND CONSTRUCTION OF ADDITIONAL CAR PARKING AREAS TO ACCOMMODATE 143 NO. CAR PARKING SPACES IN TOTAL AND 30 NO. BICYCLE PARKING SPACES AND (11) ALL ASSOCIATED SITE DEVELOPMENT AND LANDSCAPING WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
2 other applications within 500 m in five years
Get the full reportNearby 2 · 500 m · 5 years
Homes nearby
- For saleMagheraclogher, Derrybeg, Co. Donegal
- For sale4 Radharc Na Noilean, Magheraclogher, Gweedore, Co. Donegal
- For saleStrand Road Ardnagappary, Derrybeg, Co. Donegal
- For saleArdnagappary, Derrybeg, Co. Donegal
- For saleMagheraclogher, Bunbeg, Co. Donegal, F92 W9D0
- For saleMiddletown, Derrybeg, Co. Donegal
Not held yet for Donegal County Council: zoning.
Protections nearby 250 m
- Recorded monument · 2
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
2460121 is a planning application to Donegal County Council for refurbishments, alterations & extensions of existing part two-storey / part three storey, received on 8 Feb 2024; permission was granted with conditions on 30 Sept 2024.