PlanningRegister.ie
Donegal County Council · 2561152

LISTELLIAN , LETTERKENNY , CO. DONEGAL

  1. 7 Jul 2025Received
  2. 28 Aug 2025Conditional
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Under appeal
Decision
Conditional · 28 Aug 2025
Council
Donegal County Council
Type
PERMISSION
Site
9.29 ha

What’s proposed

A PERIOD OF 10 YEARS FOR DEVELOPMENT AT THE EXISTING ESB NETWORKS 110KV LETTERKENNY SUBSTATION WHICH WILL CONSIST OF: (1) SOUTHWARD EXTENSION OF THE EXISTING ESB NETWORKS 110KV SUBSTATION COMPOUND BY 0.9HA, (2) CONSTRUCTION OF A 110 KV (KILOVOLT) GAS INSULATED SWITCHGEAR (GIS) BUILDING (APPROXIMATELY 82.5M BY 18.5M) MAXIMUM HEIGHT 18.0M, TO REPLACE THE EXISTING 110KV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION, (3) CONSTRUCTION OF 5 NO. 110 KV LINE CABLE INTERFACE MASTS (LCIMS) TO THE SOUTH AND SOUTH-WEST OF THE EXISTING AIS SUBSTATION COMPOUND AND PROPOSED REPLACEMENT GIS BUILDING, WHICH WILL COMPRISE THE END POINT OF THE EXISTING OVERHEAD LINE CIRCUITS ACCESSING THE PROPOSED GIS BUILDING, (4) CONNECTION OF EXISTING TRANSMISSION CIRCUITS TO THE PROPOSED GIS BUILDING BY WAY OF UNDERGROUND CABLES FROM THE NEW LCIMS, (5) DECOMMISSIONING AND REMOVAL OF 7 NO. EXISTING 110 KV TOWERS AND 3 NO. 110KV H POLES, CABLING, BUSBARS, SWITCHGEARS AND SUPPORT STRUCTURES, (6) ERECTION OF 3 NO. LIGHTNING MASTS AT 11M HIGH AT THE REPLACEMENT GIS COMPOUND, (7) TEMPORARY WIDENING (31M) OF THE EXISTING (4M) FIELD GATE ENTRANCE OFF THE L1054 TO FACILITATE A TEMPORARY CONSTRUCTION ACCESS TRACK (204M), PERMANENT ACCESS TO THE DEVELOPMENT WILL CONTINUE AS EXISTING FROM THE SUBSTATION ENTRANCE OFF THE N13 AND (8) ALL ASSOCIATED AND ANCILLARY WORKS, INCLUDING ASSOCIATED GROUND CABLING AND EARTHGRID, 5 NO. CAR PARKING SPACES, SURFACE WATER DRAINAGE, UNDERGROUND WASTEWATER STORAGE TANK, LIGHTING, LANDSCAPING AND BOUNDARY TREATMENT, SITE PREPARATION, SITE CLEARANCE AND LEVELLING, PROVISION OF HARDSTANDING, PERMANENT INTERNAL ACCESS ROAD (505M), 1 NO. TEMPORARY CONSTRUCTION COMPOUND AND 1 NO. TEMPORARY LAYDOWN AREA WITH 20 NO. TEMPORARY CAR PARKING SPACES AND ALL ANCILLARY WORKS, ON AN OVERALL SITE AREA OF 9.3HA. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION

2561152 is a planning application to Donegal County Council for a PERIOD OF 10 YEARS FOR DEVELOPMENT AT THE EXISTING ESB NETWORKS 110KV LETTERKENNY, received on 7 Jul 2025; permission was granted with conditions on 28 Aug 2025.

Planning details

Reference
2561152
Local authority
Donegal County Council
Status
Under appeal · register status “APPEALED
Received
7 Jul 2025
Observations close
11 Aug 2025 (closed 404 days ago)
Decision due
31 Aug 2025 · decided 28 Aug 2025
Decision
Conditional on 28 Aug 2025
Proposed development
A PERIOD OF 10 YEARS FOR DEVELOPMENT AT THE EXISTING ESB NETWORKS 110KV LETTERKENNY SUBSTATION WHICH WILL CONSIST OF: (1) SOUTHWARD EXTENSION OF THE EXISTING ESB NETWORKS 110KV SUBSTATION COMPOUND BY 0.9HA, (2) CONSTRUCTION OF A 110 KV (KILOVOLT) GAS INSULATED SWITCHGEAR (GIS) BUILDING (APPROXIMATELY 82.5M BY 18.5M) MAXIMUM HEIGHT 18.0M, TO REPLACE THE EXISTING 110KV AIR INSULATED SWITCHGEAR (AIS) SUBSTATION, (3) CONSTRUCTION OF 5 NO. 110 KV LINE CABLE INTERFACE MASTS (LCIMS) TO THE SOUTH AND SOUTH-WEST OF THE EXISTING AIS SUBSTATION COMPOUND AND PROPOSED REPLACEMENT GIS BUILDING, WHICH WILL COMPRISE THE END POINT OF THE EXISTING OVERHEAD LINE CIRCUITS ACCESSING THE PROPOSED GIS BUILDING, (4) CONNECTION OF EXISTING TRANSMISSION CIRCUITS TO THE PROPOSED GIS BUILDING BY WAY OF UNDERGROUND CABLES FROM THE NEW LCIMS, (5) DECOMMISSIONING AND REMOVAL OF 7 NO. EXISTING 110 KV TOWERS AND 3 NO. 110KV H POLES, CABLING, BUSBARS, SWITCHGEARS AND SUPPORT STRUCTURES, (6) ERECTION OF 3 NO. LIGHTNING MASTS AT 11M HIGH AT THE REPLACEMENT GIS COMPOUND, (7) TEMPORARY WIDENING (31M) OF THE EXISTING (4M) FIELD GATE ENTRANCE OFF THE L1054 TO FACILITATE A TEMPORARY CONSTRUCTION ACCESS TRACK (204M), PERMANENT ACCESS TO THE DEVELOPMENT WILL CONTINUE AS EXISTING FROM THE SUBSTATION ENTRANCE OFF THE N13 AND (8) ALL ASSOCIATED AND ANCILLARY WORKS, INCLUDING ASSOCIATED GROUND CABLING AND EARTHGRID, 5 NO. CAR PARKING SPACES, SURFACE WATER DRAINAGE, UNDERGROUND WASTEWATER STORAGE TANK, LIGHTING, LANDSCAPING AND BOUNDARY TREATMENT, SITE PREPARATION, SITE CLEARANCE AND LEVELLING, PROVISION OF HARDSTANDING, PERMANENT INTERNAL ACCESS ROAD (505M), 1 NO. TEMPORARY CONSTRUCTION COMPOUND AND 1 NO. TEMPORARY LAYDOWN AREA WITH 20 NO. TEMPORARY CAR PARKING SPACES AND ALL ANCILLARY WORKS, ON AN OVERALL SITE AREA OF 9.3HA. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
As published by the register.
Site area
9.29 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 9 applications within 500 m in the last 5 years

Show all 9

Explore this area on the map →

Appeal

The register records appeal ACP-323688-25 (status unknown) but we have not matched the ACP case yet.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 329566). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2561152/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open