Donegal County Council · 2561652

CROAGHNASHALLOG , DONEGAL PO , CO. DONEGAL

  1. 24 Sept 2025Received
  2. 29 Oct 2025Observations closed
  3. 6 Nov 2026Decision due
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Withdrawn or invalid
Decision
Due 6 Nov 2026
Council
Donegal County Council
Type
PERMISSION
Site
21.37 ha

What’s proposed

10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACKS, AND ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)

2561652 is a planning application to Donegal County Council for 10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE, received on 24 Sept 2025; the file is recorded as withdrawn.

Planning details

Reference
2561652
Local authority
Donegal County Council
Status
Withdrawn or invalid · register status “WITHDRAWN”
Received
24 Sept 2025
Observations close
29 Oct 2025 (closed 333 days ago)
Decision due
6 Nov 2026
Decision
Not decided
Proposed development
10 YEAR PLANNING PERMISSION AND A 30 YEAR OPERATIONAL LIFE FOR THE DEVELOPMENT. THE DEVELOPMENT OF A WIND FARM CONSISTING OF (1) ERECTION OF (A) FIVE WIND TURBINES OF A TOTAL CAPACITY OF 4.99MW, OF A TOTAL OVERALL TIP HEIGHT OF 86M (B) AN ONSITE MEDIUM VOLTAGE (MV) SUBSTATION (C) A TEMPORARY CONSTRUCTION COMPOUND, (D) SITE SIGNAGE (2) PROVISION OF A SITE ENTRANCE, (3) INSTALLATION OF UNDERGROUND CABLING CONNECTING THE TURBINES, (4) ASSOCIATED SITE ACCESS TRACKS, AND ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE 2023/2413)
As published by the register.
Site area
21.37 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 2 applications within 500 m in the last 5 years

Explore this area on the map →

Homes nearby

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 326793). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/DonegalCC/AppFileRefDetails/2561652/0.

    Source: npad · fetched 18 Sept 2026, 15:44